短工時的工作 的英文怎麼說
中文拼音 [duǎngōngshídegōngzuò]
短工時的工作
英文
shorttime workingg-
To replace the reefer jacket and gaberdine raincoat which had been used for more than 30 years ; for staff in all weathers and when performing outdoor duties
取代沿用超過30年的雙排鈕厚呢短外套及工作服雨衣,供員工在任何天氣下擔任戶外工作時穿著I used to, like, take half of the school and do break - dancing skits with my friend in front of them at lunchtime. " but his troubles concentrating in school didn t stifle his acting dreams. leo s acting debut was on the television show romper room, at age five
5歲時他就參加了電視劇romper room的拍攝, 12歲時在歷經了50次面試后,不懈的努力終于有了回報,他得到了第1份職業演員的工作,一部短短的小汽車廣告。Eaer to operate operate put the dress material on the machinestart pedal it can complete with nease change the lnob positon at the right side of the machine head it will realiz the change of stitch both upper and down adopting design of bearded needle it is unnecessary to thread the needle hat put the thread in the bearded needle feeding material in same step both upper and down sewing becomes moreasy cloth material wont be creased length of stitch distance will keep same wide working platform it is cibvebuebt abd flexible when sewing
操作簡便,操作員把衣料放在機器上,啟動踏板即可輕松完成,變換機頭右側旋轉轉鈕的位置,即實現上下珠點的變換,採用鉤針設計,無需穿線線,將線置於鉤針即可,上下同步送料,縫制更輕松,布料不會起皺,針距長短保持一致,寬闊的工作平臺,使縫紉時更方便靈活。And different national central banks are left on their own to handle the transition. they are adopting different durations for dual circulation of their currencies along with the euro, but at most only two months
具體取代舊貨幣的工作,均留待各國央行自行處理在這方面,各國為新舊貨幣并行流通所定的時間長短不一,但最多也只是維持兩個月。But the life time of krf laser medium is only 2 ns while the pump time of e - beam pump krf laser is over 100 ns. when a 1 ps ultrashort pulse amplified by krf laser amplifier most pump energy is waste. technology of multi pulse amplify can solve this problem
Krf激光器的工作介質是非儲能介質,上能態有效壽命約為2 - 3ns ,而電子束的泵浦時間一般為上百ns ,放大超短脈沖激光時絕大部分上能態的儲能沒有被利用。Under the leadership of loca i party committee, they organized and mobilized party members, cadres, members of youth league and the activists among the non - party members, in light of their respective working system, to establish a huge propagandistic body of the mass, with the propagandists and reporters as the backbone of the system. after receiving a brief training, th i s body f o i i owed some special procedures to go to all walks of life to do political mobilization and current affairs and production propaganda, to coordinate all the political movements
在各地黨委的領導下,以宣傳員和報告員為骨幹,組織動員廣大黨員、幹部、團員和非黨積極分子,按照各自的工作系統,從上到下,建立起一支龐大的群眾宣傳工作隊伍,經過短暫的訓練后,根據統一確定的宣傳方針、內容、任務和步驟,按各地區分工負責,分片包干,採取各種宣傳教育方式和途徑,深入到工廠、農村、街道、機關、學校,進行廣泛的政治動員和時事政策與生產宣傳,密切配合各項政治運動,開展深入細致的思想政治工作。After the coke being puted into the coke - quenching device, the lid of the device should be shut at once. while the suction pump, refrigeration compressor, high pressured water circuling pump are started, the subpressure will be produced by the burning coke. then, in the vacuum, the coke will be extinguished in a flash. the burning of the coke instantly, still, produces a large quantity of heat which can be taken away by circulating water in refriger and the interlayer, after that, the temperature will fall to 60oc, even lower. in this condition, the coke will be pushed out to be stored, thus, the coke won ' t rekindle
當焦炭推上攔焦車進入熄焦器后,立即關閉罐蓋,同時啟動真空泵、冷凍機、高壓循環水泵,這時,燃燒著的焦炭就會因真空泵把熄焦器內抽成負壓,由於缺氧,使焦炭熄滅,雖然煤炭在瞬間被熄滅,但由於焦炭生成過程中所產生的大量的熱量還存在,這時,冷凍機和夾層中的循環水的工作就會把焦炭中的熱量帶走,使之在短時間內將溫度降到60以下,在這種狀態下把焦炭從熄焦器內推出入庫,焦炭就不會復燃。Did production process and appliance management. effectively lowed amount of workers and work - time to save monthly cost to around rmb7000 while keeping high quality and increasing production quantity. as excellent performance, appointed as pe supervisor
在職期間有效地減短工時,減少工位,提高生產量,提高品質,有效地降低成本,提高效率,一直得到上司的好評,提長為pe組長,評為先進工作者。In accordance with the driving characteristics of ac driving locomotive, the working status of its traction transformer is analysed. the questions that should be considered in the traction transformer design of ac driving locomotive are mentioned. these questions are the large short - circuit impedance of traction winding, higher harmonic current, over - excitation and dc magnetization caused by large variation of the network voltage, etc. some disposal methods are given
針對交流傳動電力機車的傳動特點,對其中的牽引變壓器的工作狀態進行了分析,指出交流傳動電力機車用牽引變壓器設計時需考慮的牽引繞組的短路阻抗大、電流的高次諧波、網壓波動大可能引起的過勵磁以及直流磁化等問題,同時給出了相應的一些解決方法。The heat supplying system adopts the imported sus316 plate type heat exchanger, with the heat transferring coefficient 3 times bigger than the shell & tube type exchanger, facilitating the system to reach to required working temperature in shorter time
換熱系統選用進呂sus316板式換熱器,其傳熱系數為殼管式換熱器的三倍以上,能在較短時間內達到所需的工作溫度。They will short down the working life of air compressor because they are always started or stopped when we want to make the railway carriage stay in a fixed temperature. now, automatic and intelligent control systems are being applying in bus air - conditions control. in this way, computers control the work of air compressor, the turnaround speed of fan, the open degrees of wind controlled doors and so on
我國大多數客車空調仍然採用簡單的壓縮機開關控制及循環離合控制系統,如:離合器?熱力膨脹閥系統( cctxv )和離合器?節流管系統( ccot ) ,這些控制方式的精度低,當進行恆溫控制時壓縮機處于頻繁的開、停狀態,縮短了壓縮機的工作壽命。Calibration of wind tunnel balances is time consuming and strenuous. there are many people that do have a need to develop their own calibration software that shorten the time and manpower needed for a calibration of balance
風洞天平校準是一項頗費時間和精力的工作,有必要為天平校準開發相應的軟體用以縮短校準時間,節約人力物力。Alluxe ( usa ) hotels management group could shorten the construction period with the style of the strictly and speedily on construction stage, and catching a marketing information in time on hotel operation stage
美陽(美國)酒店管理集團以雷厲風行的作風,專業、敬業的工作精神,在酒店建設階段最大限度地縮短工程施工周期,在酒店運營階段,及時捕捉營銷信息。According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not
地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。If medicine is the primary driver of widespread sequencing, however, we will be largely resequencing the human genome looking for minute variations in individuals ' dna, and short read - lengths will not be such a problem
然而如果屆時定序普及化的動機是醫學上的需要,我們的工作主要是重新定序人類基因組,找尋個人dna中細微的差異,那麼讀取長度短也就不是問題。In order to accommodate the shorter work day, the entire factory was converted from two to three shifts
為了容納縮短的工作時間,全工廠將2班倒轉換成3班倒。Compared with the traditional curve - based method, this method can calculate the currents with high accuracy and little user effort. it can automatically calculate the periodic components of varying short circuit currents at anytime, and the aperiodic components of the symmetric short circuit currents
該計算機演算法大大減輕了傳統運算曲線演算法的工作量,且具有較高的準確度,能夠自動完成系統短路時任意時刻電流衰減周期分量的求解,及對稱短路時短路電流非周期分量的求解。How to shorten the time for college graduates to fit the society and make them be qualified for the job of being a middle school teacher is an important problem which is worth our consideration
如何縮短高校畢業生的社會適應期,使他們能在盡可能短的時間內勝任中學教師的工作,成為一名優秀教師,是一個值得我們深思的問題。In a country once regarded as a bottomless well of low - cost, ready - to - work, english - speaking engineers, a shortage looms
印度曾經被認為是一個擁有取之不絕的低成本、隨時能工作和掌握英語的工程師的國家,現在卻正隱約呈現出工程師短缺的跡象。( 6 ) by the all - scale plant of the pre - ozonation experiment, when the water temperature is high, the dissolved oxygen could easily attain saturation, even over - saturation, then the phenomenon of air block could be caused in the tank, the working period of tank may shorten from 36 hours to less than 15 hours, it would influence the normal operation of water treatment plant, so it was suggested not use pre - ozonation only
( 6 )通過對預臭氧化的生產試驗,水溫較高的情況下,溶解氧容易達到飽和,甚至是過飽和狀態,這樣容易在濾池產生氣阻現象,濾池的工作周期從三十六小時縮短到十幾小時,影響水廠的正常運轉。因此建議不單獨投加預臭氧。分享友人