短時加載 的英文怎麼說
中文拼音 [duǎnshíjiāzǎi]
短時加載
英文
short-time loading-
The model is tested by a typical die - cavity roughing, and shortening machining time and balancing cutting - load can be attained
通過典型模具型腔的粗加工試驗驗證,證明該進給率優化策略不僅可以縮短加工時間,而且可以使加工載荷均勻。The flow diagram of a lpg bottle paint - drying heating system using heat carrier as heat - medium, which has similar properties as other heat - carrier heating systems, has been improved, which has good effect in avoiding oil - spraying, shortening dehydration time and power - fail protecting etc. after making a series of analysis, calculational methods of expansion tank dimension have been deduced, which takes the moisture boiling - off of heat carrier into account and accords with real conditions
對與其它熱載體加熱系統具有共性的鋼瓶熱載體加熱系統的流程圖進行了改進和完善,在防止噴油、縮短脫水時間和停電保護等方面取得了良好效果。通過分析,整理出了熱載體加熱系統膨脹器容積的計算方法,該方法考慮了熱載體所含水分汽化而帶來的影響,比原有的計算方法更加符合實際。If the total test duration is shorter than the time that is required to step up to the maximum user load, then the test stops after the elapsed duration and does not reach the max user count target
如果總的測試持續時間比逐步增加到最大用戶負載所需的時間短,則經過測試持續時間后,測試將停止,並且不會達到「最大用戶計數」目標。My research paper can be divided into five parts : i. practical mathematical models have been derived and equations are also derived ( includes field excitation system, governing system ), which are used in generator three phases short circuit and by adding large loading. ii. simulation of the generator ' s shunt - wound run
發電機組實用數學模型的推導(包括勵磁系統和調速系統) ,並由此推出了用於發電機三相突然短路和突加異步電機大負載模擬的差分方程;並進行了突卸負載、突加負載時調速系統的模擬過程; 2So in order to meet the more strict emission regulations, it is necessary to quicken the rise of temperature and shorten the light - off time of the monolith
因此為滿足更嚴格的排放法規,應有針對性地採取措施加快催化轉化器載體的溫升,縮短起燃時間,有效降低發動機的排放。Measuring engine transient process data in ca1258p1k2l11t1 truck in accelerated mode, recording and analyzing the data, then analysis the test error. 4. building model and simulating two typical running mode ? fixed 6th gear acceleration with initial vehicle speed 40km / h and gear change acceleration starting with 2nd gear, comparing calculated result with test result, revising transient process simulation model and analyzing error between calculation
本文基於ca1258p1k2l11t1載重卡車對ca6df2 - 26發動機的瞬變工況進行試驗和模擬計算,結果表明: 1 ) gt - power軟體可以很好的模擬、分析、預測發動機瞬變過程,模擬計算的結果與試驗結果很接近,試驗證明,預測分析指出的改進方向是正確的; 2 )加裝電動增壓器可以降低整車使用油耗,改善低速煙度排放,縮短加速時間,改善整車的加速響應; 3 ) gt - power軟體預測分析配合發動機和整車試驗是分析、解決發動機瞬變過程的有力工具。Improvements in performance include reductions in specific fuel consumption ( 4 % ), take - off distance ( 10 - 20 % ), minimum speed ( 100 kias ), time to climb and increase in specific excess power, sustained load factor and sustained turn rate ( 15 % )
性能改進方面包括減少4 %的耗油率,縮短10到20 %的起飛距離,減少最低速度大約一百指示空速節,縮短爬升時間和增加單位剩餘功率,提升15 %的持續回轉率與持續負載系數。According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not
地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。On 18 april 1942 she launched 16 u. s. army b - 25 bombers to attack japan, a strike that caused relatively little damage but which had enormous strategic implications. the hornet was then sent to the south pacific to reinforce u. s. units following the battle of coral sea, but was recalled to pearl harbor in mid - may
作為當時最大最新的航母「大黃蜂」號自然被選中參加空襲東京的任務,經過短期的特殊改裝后, 1942年4月2日, 「大黃蜂」號載著16架b - 25轟炸機在哈爾西的企業號護航下突入日本近海。With what i ' ll have downloaded into this cube and the contacts i ' ll have begging for my time in iacon, i think my imminent relocation may work out to less than a chore
有了我下載到這模塊中的東西,加上那些若在鐵堡時代我需得低聲下氣才能求來的門路,我想我的緊急資金重組將會在極短的時間內完成。As the computer controls the throttle valve, this method gets rid of the hand randomization, shortens the testing time, lightens the work of lab assistants and makes a progress towards the automatic test
這種加載方式通過微機控制比例電磁鐵發送信號,克服了手動加載的隨機干擾,縮短了實驗時間,減輕了實驗人員負擔,向液壓測試的全自動化邁出可喜的一步。It was found that before the plating, there is section time to gestating, that we call the " gestating time " and the plating was ended spontaneously after some time, named " plating time ". the analysis of the solution after plating indicated that the too much decrease of ph value results in the reaction to be stopped. the plating time was shortened when the ph and the temperature of the bath were increased
結果表明,鍍液ph浙江大學碩士學位論文范啟義2003年3月摘要值、施鍍溫度提高,由於反應的速度加快,使反應時間縮短;硫酸銅濃度提高,有助於加快反應速度,從而縮短反應時間; edta濃度提高,使鍍液穩定性升高,對反應時間的影響等效于硫酸銅濃度的降低;而甲醛濃度提高,雖然反應的速度加快,但由於可用於還原的量增加,因此反應時間增加;裝載量提高,因能鍍覆的表面積增加,使反應時間縮短。The data captured in field tests and observations both prove that crossrange prestressing can effectively reduce roadbed settlement, shorten the roadbed compression and stabilization period, and increase the capacity of roadbed
通過試驗路段的試驗以及竣工后一段時間的定期觀測,表明側向施加的預應力能減少路堤總沉降,縮短工后沉降穩定期,提高路堤的承載力。At the same time, we would receive a canopy, three sheet toilet paper and five gallons drinking water ( when you lacked of water, you could ask more ). we should put all the above equipment in a large and black colour plastic rubbish bag but it was not suitable to carry by short person like me
"獨處"時不準進食,也不能帶多餘物品,除了自己的睡袋、雨衣和保暖衣物之外,每人獲發一個天幕,幾加侖的水和三格廁紙,不過這些東西得用一個黑色大垃圾膠袋裝載起來,這對身型短小的我來說可不易攜帶。By using jython, you can use both the java and the python libraries, reuse your existing scripts, and shorten your test - and - code cycle because the scripts are loaded at run time
通過使用jython ,可以同時使用java庫和python庫,重用現有的腳本,而且,由於腳本在運行時加載,因此還可以縮短測試編碼周期。To make a long story short, it took over five seconds for my servlet to load a page - worth of local entity ejbs for display
長話短說,我的一個servlet在加載一個使用實體ejb的頁面來顯示時花費了超過5秒鐘的時間。This system has a lot of the prominent characteristics such as simple structure, and good efficiency, especially adapting to the large, middle power machine equipments that have the big qualities, periodicity, in the short time, constantly accelerating and applying the brake. it is very remarkable in energy - saving
二次調節靜液傳動系統具有許多顯著的優點,比如:較為簡單的結構,並可得到較高的效率,特別適用於那些負載質量較大、具有周期性、在短時內需不斷加速和制動的大中功率場合(如車輛系統和升降系統) ,其節能效果十分顯著。Javapos provides a good solution for the problems of the translatability, dynamic loading, safety and cross - platform of embedded pos system. it can support other 3rd party developing application easily, simplifies and standardizes the developing flow of pos application, and shorten developing cycle and the time of coming into the market of application system
Ejavapos很好地解決了嵌入式pos系統可移植性、動態加載、安全性、跨平臺等多方面的問題,很容易支持第三方開發應用軟體,可以簡化和規范pos應用的開發流程,大大縮短應用系統的開發周期和上市時間。It supports the energy requirement in long term acceleration process and as an energetic recovery system for braking process and downhill drive
超大電容工作在尖峰負載區,為大加速度過程提供能量,在短時間內實現能量回收。The specimens of rpc filled in steel tube short columns were studied, and their characters of deflection were analyzed. the tested cures of loading - displacement relationship of rpc filled in steel tube short columns were given and the characters were discussed. a formula for predicting the ultimate bearing capacity of rpc filled in steel tube short columns under axial compression was derived from the limit equilibrium method
分析了鋼管活性粉末混凝土短柱的變形特點,模擬了鋼管活性粉末混凝土結構的三種加載方式,探討了該組合結構的工作機理,分析了試件受荷時的變形特點,給出了試件的實測荷載-變形曲線,並分析了套箍指標、加載方式等對鋼管活性粉末混凝土軸心受壓時的荷載-變形曲線的影響。分享友人