石堆堤 的英文怎麼說
中文拼音 [dànduīdī]
石堆堤
英文
riprap-
The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2
由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤壩,使湖泊的形成成為可能。The use of a vertical seawall resting above the rock fill mound would minimize the width of the base
在毛石堆上建造垂直海堤可減少底座的闊度This solution can be widely promoted for general rockfill slope protection in other fields such as railway, highway, river dike etc.
這一技術在鐵路、公路和攔河堤壩等一般堆石坡面施工中的推廣應用前景也十分廣闊。A mound of earth or stone built to hold back water or to support a roadway
堤用以阻擋水或支持公路而建造的土堆或石堆Rock - mound breakwater
堆石防波堤Rubble mound seawall
堆石海堤The proposed cwpss will rest on the seawall rubble foundation which is an appropriate foundation material without the need of piles or other form of foundation. the design is considered most cost - effective and involves low construction risk
建議的冷卻用水抽水站會採用堆石地基的海堤,這種地基不但用料合適,而且無須加設樁柱或其他類型的地基,是具成本效益和低建造風險的設計。24. the further review of criii confirms the november 2003 findings that the current seawall design adopted in the government s scheme, i. e., a rubble foundation for the seawall, is the most commonly adopted design. it represents the most cost - effective form of seawall design
24 .中區填海第三期工程的進一步檢討肯定了2003年11月的檢討結果,就是政府計劃所採用的現有海堤設計,即採用堆石地基的海堤,是最為常用的設計,也是最具成本效益的海堤設計。分享友人