石堤 的英文怎麼說

中文拼音 [dàn]
石堤 英文
rock embankment
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. These tiny debris-flow deposits formed on freshly excavated embankments of the california aqueduct.

    這些細小的泥流沉積是在新開鑿的加利福尼亞渠的大上形成的。
  2. The gypsum slurry is pumped into a diked area.

    我們用泵將膏料漿打到一塊用圍起來的空地中。
  3. The present lake wall of stone and granitoid was not then in place, but the road had been well laid out, the intermediate spaces of lawn were lovely to look upon, and the houses were thoroughly new and imposing

    在北區沿著現在的北湖濱路已建起了一批漂亮的府郟那個湖當時還沒有用塊和花崗巖鋪的湖。井然有序的道路把草坪分隔成一塊塊的,看上去很悅目,簇新的府第十分氣派宏偉。
  4. Or again, note the meanderings of some purling rill as it babbles on its way, fanned by gentlest zephyrs tho quarrelling with the stony obstacles, to the tumbling waters of neptune s blue domain, mid mossy banks, played on by the glorious sunlight or neath the shadows cast o er its pensive bosom by the overarching leafage of the giants of the forest. what about that, simon ? he asked over the fringe of his newspaper

    「再則,請注意那打著漩渦蜿蜒曲折地嘩嘩淌去的淚淚溪流與攔住去路的巖搏鬥,在習習西風輕拂下,沖向海神所支配的波濤洶涌的蔚藍領國;沿途,水面上蕩漾著燦爛的陽光,兩邊的岸爬滿青苔,森林中的巨樹那架成拱形的繁葉48 ,將蔭影投射于溪流那憂郁多思的胸脯上。
  5. Along by the edge of the mole he lolloped, dawdled, smelt a rock and from under a cocked hindleg pissed against it. he trotted forward and, lifting his hindleg, pissed quick short at an unsmelt rock

    這狗並不朝我望,徑自沿著防波的邊沿跳跳蹦蹦,磨磨蹭蹭,一路嗅嗅巖,時而抬起一條後腿,朝那塊巖撒上一泡尿。
  6. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的工作就下述幾個方面展開:用灰改良膨脹土的機理;通過室內試驗確定摻灰的技術指標;在室內進行膨脹土摻灰的最大有效粒徑的模擬試驗,即鈣離子水試驗,由此總結出「粉?塊」灰?土攪拌工藝的有效性、合理性和可行性;用數值方法對路使用期的濕度場進行模擬,並與路的強度?變形的計算域耦合,以檢驗土性改良的效果,從而探索一種描述改良膨脹土路運行工況的數值方法;用現有最常用的且費用最低的施工機具,對灰?土進行「粉?塊」攪拌摻和及路基的填築施工等。
  7. Standard practice for assembly and placement of double - twisted wire mesh gabions and revet mattresses

    雙扭線篩網筐和護墊的組裝和放置的標準規程
  8. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華壩,使湖泊的形成成為可能。
  9. They have raised all kinds of engineering steps on roadbed against frozen disaster, for example, adopting the reasonable height of roadbed, building ventilative embankment, setting up the defense, burying hot metal stick, making use of stone to protect slope and laying thermal insulation and heat insulation material etc, laying eps is one of these special steps

    針對路基凍害問題,人們對路基凍脹、融沉和溫度場特徵進行了廣泛研究,提出了各種路基抗凍害的工程措施,如選用採用合理的路高度,修築通風路,設置護道,埋設熱棒,利用片護坡和鋪設保溫隔熱材料等特殊工程措施。
  10. This dissertation ' s problem just comes from this engineering background exactly. for this two kinds of cores, which were taken from the engineering place, this dissertation draws sample by computer and analyses the weight distributions, getting the weight curves, the middle weights, asymmetry coefficients and other physics characteristic indexes of them, and makes up the model samples which are similar to the factual weight distributions

    本文對施工現場採用的10 100kg和1 800kg重量范圍的進行了隨機抽樣和重量級配分析,得到了描述這兩種類別的重量級配曲線、中值重量、不均勻系數等物理特性指標,並由此制備重量級配相似的模型樣本。
  11. According to the abundance well logging, mud logging and core analysis data, gaotaizi reservoir has been classified into four sand group with the principle of cycle comparison and classified control. based on the detailed study of lithologic character, sedimentary structure, paleontologic fossils, depositional sequence, rock association and logging data, the microfacies of the studied area are divided into such seven types : subaqueous distributary channel microfacies ; river mouth bar microfacies ; subaqueous interdistributary channel microfacies ; subaqueous crevasse channel microfacies ; subaqueous natural barrier microfacies ; distal bar microfacies ; delta front sheet sand microfacies. the characteristic of each sedimentary microfacies are described detailedly

    通過研究大量測井、錄井資料和巖芯資料,依據「旋迴對比,分級控制」的原則,把研究區高臺子油層劃分為g 、 g 、 g 、 g四個砂層組。通過對研究區巖性、沉積構造、古生物、沉積序列、巖組合及測井曲線特徵進行研究的基礎上,認為研究區高臺子油層屬於三角洲前緣亞相沉積,並將研究區沉積微相劃分為:水下分流河道、河口壩、水下分流河道間、水下決口扇、水下天然、遠砂壩、席狀砂等七種微相類型。
  12. Specfication for design of fire - dike for petrochemical industry

    油化工防火設計規范
  13. Soft ground treatment of flood bank using vibro - replacement gravel piles

    振沖碎樁在防洪軟土地基處理中的應用
  14. Rubble mound breakwater

    防波
  15. Analysis of the scour to the river bed along the southern main dike of the jingjiang river before and after throwing stones into the nearshore water

    荊南干局部河段近岸水下拋前後沖淤分析
  16. Pitched slope breakwater

    護坡防波
  17. Application of dry stone pitching revetment with pointing joint by sluicing sand in levee

    淺談干砌沖砂勾縫護坡在防工程中的應用
  18. Sediment and soil were removed to expose the bedrock and enable the dams to be erected on solid rock. the cofferdams were retained, and the seaward one served as a protective structure. the seawardside of the cofferdam for the east dam was placed with more than 7, 000 dolosses, each weighting 25 tonnes to stop the pounding ocean waves

    壩建成后,圍堰仍然保留,用作主壩的護,西壩的護,向海的一面更安放了七千多塊每塊各重25噸的防波,阻擋來自南中國海及太平洋海浪的沖擊。
  19. The use of a vertical seawall resting above the rock fill mound would minimize the width of the base

    在毛堆上建造垂直海可減少底座的闊度
  20. He crawl on his belly under the lee of a stone dyke

    他在一條石堤的掩護下匍匐前進。
分享友人