石灰漿泵 的英文怎麼說

中文拼音 [dànhuījiāngbèng]
石灰漿泵 英文
lime slurry pump
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ名詞1 (物質燃燒后剩下的粉末狀的東西) ash 2 (塵土; 某些粉末狀的東西) dust 3 (特指石灰) lime...
  • 漿 : 漿同「糨」
  • : 名詞(吸入和排出流體的機械) pump
  • 石灰 : lime; kalk; chunam石灰焙燒 lime roasting; 石灰玻璃 soda lime glass; 石灰採石場 lime pit; 石灰漿[...
  1. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤混凝土技術、南京長江二橋送混凝土技術等提供咨詢建議。
  2. The main works have been done as follow : ( 1 ) after a great deal of literatures are read, the paper introduces the main ways of the flue gas desulfurization, and the development status of dcs ; ( 2 ) through the analysis of the former dcs system in the plant, the desire about the rebuilding of dcs is put ; the characteristic of the planning dcs system is introduced ; ( 3 ) according to the characteristic of the wet limestone - gypsum flue gas desulfurization, the main factor about influencing the efficiency of desulfurization is analyzed ; ( 4 ) some tests are done, which are the reduction and enhancement of the flue gas quantity, and the disturbing test of the starting and stoping the circulation of the serum in the absorbing tower. the paper lists some actual run curves

    本文完成了以下主要工作:在閱讀了大量文獻資料的基礎上,介紹了火電廠煙氣脫硫的主要方法,以及dcs的發展狀況;通過對本廠脫硫裝置原有dcs系統的分析,提出了對dcs改造的要求;介紹了擬選擇dcs的特點;根據濕式膏法煙氣脫硫的特點,分析了影響系統脫硫效率的主要因素;進行了吸收塔煙氣量減少、增加,啟停吸收塔漿液循環擾動試驗,並給出了部分實際運行曲線。
分享友人