砂柱 的英文怎麼說

中文拼音 [shāzhù]
砂柱 英文
sand pinnacle
  • : 名詞(沙子) sand; grit
  1. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈、漢白玉華表、拓荒牛、漢白玉佛像、頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門墩、玉器加工、浮雕、華表、龍、刻字、硅、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓、花瓶、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  2. Jiangmen boasts of rich mineral resources with 37 kinds of minable minerals, including limestone, silica sand, potassium feldspar, monazite, crystal, aquamarine, coal, tombarthite / rare earth, gold, silver, copper, iron, stannum and tungsten, among others

    礦產資源豐富,已探明可開採的有石灰石、硅、鉀長石、獨居石、水晶、綠石、煤、稀土及金、銀、銅、鐵、錫、鎢等37種。
  3. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    軸線、標高線復測投點,彈出支模線,將腳支模處用1 : 2水泥漿找平,每根周圍搭設井字架,在井字架上抄測標高控制線。
  4. In addition square design 12 the heavenly stems the twelve earthly branches column in the sun, ancient the heavenly stems for timing tool the twelve earthly branches, implied meaning to represent time, i hope, can with theme of sand at the i, echo each other, the building in the middle of the sun square is set as the round, hope it has by the look of on the plane figure been a stereoscopic round, and cover the ground and adopt the magnificent style that publicize, to reflect the enthusiasm of day is publicized, in addition the section of dim light of night represented by moonlight restaurant, i plan to have light more, can let people can fully experience the soft light makes the dim light of night pleasantly

    此外在太陽廣場設計了12根天干地支,古代天干地支為計時工具,代表時間的寓意,我希望能和我時之的主題,相互呼應,太陽廣場中間的建築物設為圓形,希望從平面圖上看來是個立體的圓,而鋪地採用華麗張揚的風格,來體現日的熱情張揚,此外以月光餐廳為代表的夜色段,我打算多設燈光,能讓人能充分感受到柔和燈光下夜色迷人。
  5. These sandstone - and - conglomerate sea stacks were spared during the glacial sweep of the last ice age, but bear the effects of centuries of tidal erosion

    這些巖和聚成球形的海蝕是在最後冰河時代延伸冰期剩下的,而且承受了數世紀海潮腐蝕的效果。
  6. Column leaching rare earth from chlorinated calcine of panxi black weathering mud

    攀西稀土礦黑色風化礦泥氯化焙砂柱浸稀土研究
  7. The original landscape of the site had been changed drastically, and frequent disturbances caused by recent urban development were shown. the trench is now full of pipes and piles. the relics might be deposited in a brownish sandy layer, between the modern disturbed layer and the greyish sand of marine deposit

    從出土文物的地點觀察,原來的地貌早被近代城市發展所改變,溝內滿布水管和樁,埋藏文物的層位應是現代擾亂層和灰層之間的碣層。
  8. Hmn is an intensive cleaning agent for sand control pine string

    Hmn防清洗劑是一種強力清洗劑。
  9. This cylinder was composed of a mixture of clay and sand, with the addition of a little hay and straw.

    這個圓是用摻了乾草和麥秸的粘土和細做成的。
  10. Based on the geological and mining conditions and occurrence characteristics of loose aquifer of xinglongzhuang colliery, water bursting cause of 4303 full - mechanized caving mining face under loose aquifer was analyzed, the prevention measures of the 3rd aquifer and reasonable dimension of coal pillar for sand proof were discussed in this paper

    摘要根據興隆莊煤礦地質采礦條件,結合鬆散含水層賦存特徵,分析了四采區4303綜放工作面第四系鬆散含水層出水的原因,探討了防治三含水的技術途徑和留設防的合理尺寸。
  11. The results of experiments shows that core column can increase flexural and shear resistant capacity and improve deformability and entirety of composite walls ; it is coordinate ductility of two composite walls joining wire or steels out - of - plane ; the seismic of composite walls joining with wire is fine than joining with steels ; the deformation of out - of - plane only affect the crack - loading, the ultimate carrying capacity and ductility in - plane nearly has no change

    墻片試驗表明:芯可以增加復合墻體的抗彎和抗剪承載能力,改善墻體的變形能力和整體性;分別應用鋼絲網片和鋼筋連接的兩種復合墻體的平面外延性大致相同,內外葉墻協同工作良好;內外葉墻之間的連接提高了外葉墻漿層抗拉強度,同時也提高了復合墻體向外葉墻方向的抗推和抗拉承載力。
  12. Standard test method for ultrasonic examination from bored surfaces of cylindrical forgings

    體鍛件表面心的超聲波測試的標準試驗方法
  13. The surface sticks canada to import the solid bark of primary color, and roast the top very and strictly black of valuable piano paint, bright that divide the craft top thin and red wood grain, luster that have got the precious stone sort is with the texture, endurable often new, its strong and tough surface can resist slight of shot but not leave the trace, and match the plank of last glass crest with the glow - in - the - dark sand aluminum metal alloy pillar, highly respectable shape chien roughly vogue, now modern vogue elegant appearance of your luxurious living room of ream of nobility tasty, cultured qualities

    表面貼加拿大進口原色實木皮,烤上極嚴格分色工藝的名貴鋼琴漆,亮麗黑色配上淡紅色木紋,有著寶石般的光澤和鏡面質感,恆久常新,其堅硬的表面可抗拒輕微的碰擊而不留下痕跡,搭配上玻璃頂板和亮光鋁合金,尊貴的外形簡約時尚,彰現貴族品味,典雅的氣質令您的豪華客廳爭添現代時尚風采。
  14. As for the improvement of ductility of masonry structure and the aseismatic performance of building, several factors were discussed, which consisted of the layout of building plane and building elevation, the building level number and height, the layout of vertical wall and cross wall, thus enhancing the intensity of mortar, ring beam, constructional column and the placement of horizontal reinforcing steel bar

    從建築平面和立面的布局、房屋的層數和高度、縱墻和橫墻的布置、提高漿強度、圈樑和構造以及水平鋼筋的放置等多個方面來進行探討,從而改善砌體結構延性,提高房屋的抗震性能。
  15. Test method for ultrasonic examination from bored surfaces of cylindrical forgings

    體鍛件表面心超聲波檢驗方法
  16. In chapter three, in order to simulate the actual drilling fluid column pressure and to supply the extreme high pressure drilling circulating fluid for the device, the high pressure circulating fluid simulating system has been designed based on the experience of drilling fluid circulating system in the wellside. to purify the drilling fluid, the high pressure desander has been designed

    第三章為模擬實際鉆井的液壓力,並為整個模擬鉆井裝置提供超高壓循環鉆井液,在借鑒了鉆井現場的鉆井液循環系統經驗的基礎上分析研究了鉆井液高壓循環系統,並配套設計了高壓除器,以達到凈化該系統中鉆井液的要求。
  17. In sichuan red basin, excavating cuttings in gently inclined red beds composed of sandstone and mudstone intercalations, mudstone would be indented inward by weathering, and result in a niche on the slope surface. slope, and the bearing force of the support structure must computed in design. in this paper, the overlying sandstone bed is regarded as cantiever beam, and a calculation method for the bearing force is developed, a calculation example is also given

    分析了四川盆地緩傾角紅層地質結構特徵,將下覆泥巖風化形成凹巖腔后的巖視為懸臂巖梁,提出了一種計算泥巖風化凹進極限深度及在設計支撐時計算支護力的計算方法,並給出一個計算示例。
  18. The influences of soil structure, confining pressure and strain amplitude on dynamic properties of recently deposited soils of nanjing and its surrounding areas are discussed. furthermore, based on test results and theoretical analysis, the averaging curves, recommended values and envelopes of dynamic shear modulus ratio ggmax and damping ratio versus dynamic strain for recently deposited soils of nanjing and its surrounding areas are presented. by use of vibration triaxial apparatus, nanjing silty clay and fine sand interbedded strata and nanjing fine sand were tested and their test results are discussed

    通過自振試驗,探討了土的結構性、有效圍壓和應變幅值大小對動荷載作用下南京及其鄰近地區新近沉積土的動剪切模量、阻尼比和應力?應變關系的影響;通過試驗和理論分析,給出了南京及其鄰近地區的粘土、淤泥質粉質粘土、粉質粘土、粉質粘土與粉互層土、粉土以及土等六類新近沉積土中典型土類的動剪切模量比和阻尼比隨剪應變幅值變化的平均曲線、包絡線和推薦值。
  19. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底巖石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的井架、平臺等設備,研究設計了模擬6000米井底壓力壞境的高壓模擬井筒、鉆高壓轉聯器、鉆井液高壓模擬系統以及高壓除器等機械裝置,並研究了井底四維模擬壓力(上覆壓、圍壓、孔隙壓和液壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓力環境的模擬。
  20. Standard test method for measuring changes in height of cylindrical specimens of hydraulic - cement grout

    測量水硬水泥漿制圓形試樣高度變化的標準試驗方法
分享友人