砌築型式 的英文怎麼說

中文拼音 [xíngshì]
砌築型式 英文
pattern bond
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  1. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的結構與支護研究;特大水輪發電機組的科學研究。
  2. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯墻的結構與支護研究;特大水輪發電機組的科學研究。
  3. This system is the new type, in which the connection between the special - shaped column and concrete block is stronger than that of frame structure and the dark beams are located and its constructional sequence is brickwork first and placing columns second and concrete blocks are as bottom forms when beams are placing

    這種新結構形的主要特點包括:異形柱與塊為馬牙槎連接、墻體內含有暗梁、施工順序為先墻后澆柱、梁澆時以塊為底模。
  4. By combining the design of cast asphalt concrete core earth - rock dam of nierji hydroelectric projects, an optimize study on the structural types and construction technology of cast asphalt concrete core are carried out in the article. the main contents of the study are summed up as follows : at present, the main and auxiliary core structures are widely adopted in the design of the cast asphalt concrete core earth - rock dam in the state, i. e. the main core to be asphalt concrete and auxiliary core of asphalt mortar masonry

    本文結合尼爾基水利樞紐工程的澆瀝青混凝土心墻土石壩的設計,對澆瀝青混凝土心墻的結構和施工技術進行優化研究,主要研究內容歸納如下:目前我國在澆瀝青混凝土心墻土石壩設計中,心墻的多採用主、副墻結構,即主墻為瀝青混凝土,副墻為瀝青砂漿體。
  5. The productions include : 1. the investigation of crackss of masonry structures, the characteristic and the reason on cracks of wall ; 2. the limited element analysis about datum of brick - wall the relation between the maximal stress in wall and the relative sedimentation of foundations, the relation between the cracks form in wall and inner stress, the validity of limited element mode ; 3. the limited element analysis about the relative sedimentation of foundations, the influence of ratio of length and height, foundations rigidity, groundsill rigidity on the inner stress in wall ; 4. the limited element analysis about the influence of temperature on wall cracks and the influence of space between extension cracks, difference in temperature on the inner stress in wall ; 5. the analysis about the cracks rule because of temperature, the contrast between the result and the simulant result ; 6. the study about the influence of cracks of masonry structures because of constriction stress, the experience of dealing with constriction cracks in the domestic and the foreign ; 7. the advice of avoiding cracks because of the asymmetric sedimentation temperature, constringency in design and construction

    本研究結合實際工程中的塊建普遍存在的裂縫問題,參照磚墻裂縫調查研究的成果,針對我省的塊應用狀況,進行了充分的調研,並查閱大量的文獻資料,總結了塊建墻體裂縫的特點和規律,通過對溫度裂縫、沉降裂縫的有限元分析和經驗公的對比,深入的探討了墻體開裂的影響因素,結合各地實際工程經驗,在對混凝土塊墻體在材料、設計、施工等方面進行系統的理論分析、綜合研究的基礎上,給出開裂的防治方法,促進混凝土塊在我省的推廣應用,為相關規范的編制提供理論依據和經驗分析,主要研究成果有: 1體開裂的調查研究,墻體開裂的特點和原因總結; 2有限元分析磚墻實測數據,揭示了墻體內最大主應力和地基相對沉降量的關系及墻體開裂形態與內部應力的聯系,並且驗證了有限元模的有效性; 3
  6. With regard to the strong support type of cast - in - place concrete often adopted in loess highway tunnels, the influences of strength, thickness and age of concrete on surrounding rock and lining structure were analyzed by use of numerical imitation technology

    摘要針對黃土公路隧道常採用模混凝土強支護,利用數值模擬技術分析了襯混凝土強度、厚度和考慮齡期與否對圍巖及隧道襯結構的影響。
分享友人