破土動工 的英文怎麼說

中文拼音 [dònggōng]
破土動工 英文
break ground; begin a construction project by digging for the foundation; turn the formal first spadeful of dirt
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 破土 : 1 (挖地動工) break ground (in starting a building project etc ) 2 (開始耕種) start spring p...
  1. Yeah, next month, they break ground

    是的,下個月他們已經破土動工
  2. The harbor school just broke ground on the new gym. it should be beautiful

    Harbor學校破土動工修新體育館了應該很漂亮
  3. Soaring into the sky at a record height of over 415 meters, the twin towers project started to break ground in the year 1966

    創記錄地以415米的高度聳入雲霄的「雙子塔」程於1966年開始破土動工
  4. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c碎機採用美國迦納德?丹佛氣集團公司成熟技術,是以壓縮空氣為力的具,能高效完成鋼筋混凝、巖石、瀝青等作,具有馬力更大、效率更高、壽命更長等特點,特別適宜對特大、特厚、特堅硬物體的碎作業,是礦山、橋梁、道路、市政建設等基礎程施的理想具。
  5. 2 projects of dongseo mechatronics and ruijin precision machinery are started at the same time in yantai etdz

    東西機電和瑞金精密機械兩個項目在煙臺經濟技術開發區同時破土動工
  6. In view of the engineering practice that retaining wall in the front edge of landslide is only deformed but not destructed completely as a result of the slide of slope, this paper presents a back calculation method of landslide shear strength index considering the residual resistance of retaining wall occurring topple, translation and shear deformation

    摘要針對滑坡的滑僅使其前緣的擋墻發生位移或變形,但未使之完全壞的程實踐,系統提出了滑坡前緣的擋墻在發生傾覆、前移和剪切三種變形下,考慮擋墻變形后對滑坡的剩餘抗滑作用進行滑帶抗剪強度指標反算的理論和方法。
  7. On october 31, 1976, the 90th birthday of the late president chiang, a ground - breaking ceremony was held, marking official commencement of the construction, with the rsea engineering corporation, and veteran s affairs commission contractors

    爰於六十五年十月三十一日蔣公九秩誕辰紀念日舉行典禮並興建,由國軍退除役官兵輔導委員會榮民程事業管理處承建。
  8. Guider : it is designed by renowned danish architect, jorn utzon. he began construction of the world famous opera house in1959 after winning an international design competition

    向導:它是由丹麥著名的建築學家喬恩-厄特宗設計的。他是在贏得國際設計競賽後於1959年開始破土動工建設這座世界著名的歌劇院的。
  9. Construction will begin as soon as preparations are completed.

    一做好準備,就破土動工
  10. Oct. 26, 2006 xcec broke the ground and started the construction

    2006年10月26日,廠房破土動工和開始施
  11. The construction of the factory will start by the end of this year and production in june 2005

    廠將於今年年底破土動工,並於2005年6月開生產。
  12. The farmer thinks that it is good to break ground for his new house in 2 or 3 days, but his wife thinks that they has no grounds for doing it so urgently

    農夫認為在2到3天內為他的新房破土動工是合適的,但是妻子則認為他們沒有可以馬上開地。
  13. Ultimately, it will be capable of producing disk drives of varying form factors, giving hitachi gst the flexibility required to meet future demand in the traditional it and consumer segments

    該生產中心初期將建設三萬五千平方米的廠房,已於二零零四年第四季度破土動工
  14. Recently in beijing, suzhou kinglong has brought forth the complete series of " haige " automobiles, which contains three main series : s series, w series, and b series

    四川汽車集團投資.億興建客車生產基地據悉,四川汽車業集團公司月日在成都經濟技術開發區正式破土動工興建新的客車生產基地。
  15. The guyed mast structure is a high - rise system made up of soft cable and slim mast. the interaction between the inclined guys and the mast makes its nonlinear dynamics very complex. the damage probability of guyed mast is especially high under normal designing and constructing in civil engineering fields

    桅桿結構是由柔索和細長的桿身組成的高聳結構,斜拉的纖繩和桿身使其非線性振十分復雜,在正常設計、建造及材料情況下,桅桿結構壞發生的比例之高在程界是少見的。
  16. Through analyzing bed ' s response to wave, in the condition that super - stratum is more hard and second - stratum is more soft in region of interest, super static interstitial hydraulic pressure amplitude die away rapidly between stratums, before in sight of boundary between hard and soft stratum, plane effective pressure increase to max. shear stress reach peak value when bed thickness is approximately 2. 7 meters, then it will decrease to the minimum on the place where the flexible soil has a common boundary with the rigidity, so the boundary is the most destroy plane on engineering. on the basis of reconnaissance in situ, in normal situation of sea, the structure slides to the basin along the boundary

    通過對底床在波浪下的響應分析,對于研究區底床上層較硬而第二層較軟的情況,超靜孔隙水壓力幅值在層間交界處迅速衰減,在臨近硬、軟地層交界處前,水平有效應力增至最大,剪切應力在底床厚度大約2 . 7米左右達到峰值,然後減小,到硬、軟層交界位置,達到最小,因此這個界面就是最容易發生壞的程軟弱面,現場勘查證明,即使在正常海況下,構築物也會沿坡以此交界面為滑面,緩慢向「盆」底滑
  17. E work according to quality guidelines of professionalism, precise effective, keeping ahead of this industry, making excellent products that improved the quality and grade of resuns products

    今年,集團公司的規模建設也在迅速拓展,廣州業園主體程已全面竣,投產在即。饒平業園也已破土動工
  18. Taking a qingdao hotel second phased project deep hole excavated for building foundation as example, the paper introduces the application of the demolition vibration in the complex peripheral environment and the geological condition, the influence, crag body vertical excavates regarding nearsightedness, the pre - stressed anchor rod and the earth nail unify support and protect the technology in the project of the crag body side slope

    摘要以青島某飯店二期程深基坑為例,介紹了在復雜的周邊環境和地質條件以及有爆的影響下,對于近似垂直開挖的巖體邊坡,預應力錨桿與釘結合的支護技術在邊坡支護程中的應用。
  19. Thirdly. based on the analysis of the engineering geology, hydrogeology and the dynamic peculiarity of the site soil, and the analysis and caculation of the seismic reaction, it gains the anti - seismic design coefficient and divided the city area into three seperate defence zones. marked a, b, c. finally, it makes a researsh of the seismic effect of the site of the city and makes the suggestions of the land utilizing. dividing the city land into 4 sub - zones

    第三在分析研究萊蕪程地質、水文地質及場地力特徵的基礎上對萊蕪市場地地震反應進行了分析計算,得出萊蕪市抗震設計地震參數,並分為a 、 b 、 c三個設防區。最後對場地地震壞效應進行了研究,對萊蕪市地利用進行了分區,並提出了合理利用地建議。
  20. Concept, methods, characteristics and influential factors of artificial rebuilding of mining engineering disturbed soil with the connotation that artificial rebuilding of soil is to restore and reconstruct land destroyed in mining by artificial means

    摘要提出了礦山程擾再造的概念、方法及特點,認為壤人再造即主要通過人為措施再造壤,是礦山地的壤恢復與重建。
分享友人