確定的備件表 的英文怎麼說
中文拼音 [quèdìngdebèijiànbiǎo]
確定的備件表
英文
definitized spare parts list- 確 : 形容詞1. (符合事實; 真實) true; reliable; authentic 2. (堅固; 堅定) firm
- 定 : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
- 的 : 4次方是 The fourth power of 2 is direction
- 備 : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
- 件 : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
- 表 : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
- 確定 : 1. (明確地定下) define; fix; determine; ascertain 2. (明確而肯定) definite; certain; for sure
-
Shop drawings design in structured cabling project should ascertain cabling equipments and cables " routes according to design criteria and user ' s demand, and should produce firstly needs table of equipment and material quantity
結構化布線工程的施工圖設計需要根據設計規范和用戶需求確定系統各組件及布線路徑,同時需要生成主要設備和材料用量報表。After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and supervision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seven ) days in advance and thereafter commissioning shall be carried out as soon as possible
在成功完成按本章節中的第74條所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附件三中的時間表對設備進行初次運作,而上述時間表(所規定的日期)應經雙方調整並提前7天確定.而其後的試產應盡快執行Approximately three months prior to the scheduled date for mechanical completion, buyer shall advise seller that it is ready to have a minimum of two seller representatives, to be provided through seller ' s affiliate to proceed to the site, at buyer ' s expense, to inspect the plant and to ascertain that the plant has been built in accordance with the project specifications and is ready for commissioning
在擬定的機械完工日期前3個月左右,買方應通知賣方準備要賣方從其所屬單位選派至少兩名代表來現場對工廠進行檢查,並確定工廠的建設是否符合項目技術規范,是否具備了試車的條件;選派上述人員而發生的費用應由買方承擔。The closing of the sale and purchase of the assets will be subject to the satisfaction of certain conditions, including the mutual agreement of a definitive agreement, the completion of the due diligence investigation of both parties, the filing of the certificate of designation creating the preferred stock to be issued to qianbao, the delivery of any required consents from third parties, and the delivery of audited financial statements of qianbao
銷售和資產收購的完成取決於是否滿足這些條件,包括雙方同意確定的協議,雙方完成盡職調查,是否備案給錢保的優先股的指定證書,第三方同意的發布,以及錢保審計過的財務報表的發布。2. considering current equipments and requirements for db935, the technics standard were made sure, including the cathode weld and carbonization, manufacture of the pyrogenation graphite grids, surface treatment, assembly and the exhaust after a lot of research and improvement
2 、根據公司現有的裝備條件和db935的要求,通過不斷探索和改進,確定了陰極焊接及碳化、熱解石墨柵極製造和表面處理、整管裝配和排氣等工藝規范。The documented verification that the facilities, systems and equipment, as installed or modified, perform as intended throughout the anticipated operating ranges
用文件確認安裝或改進的設施、系統和設備,表現失重按照預先規定的操作范圍進行。It has been demonstrated that it is the microgel that guaranteed the homogeneous of the structure of the composite, the size and the morphology of the composite particles. the surface structure of the micro - particles can be adjusted by changing the preparing conditions. the composites may adopt hollow sphere structure, and the inner may lack of cds due to precipitation was started from the outer part of the microgels
實驗結果表明:高分子微凝膠的三維網路結構和所採用的制備方法確保了有機-無機復合材料復合的均勻性;微凝膠的模板作用使得復合材料呈球狀結構,微球的大小決定於模板的尺寸;微球的微納米結構可因微球的制備條件的不同(例如,改變連續相類型)而不同。After the successful completion of the test run specified in clause 74 of this chapter, start - up of the equipment shall be carried out by the enduser under seller ' s instructions and superision according to the contract schedule according to appendix iii and said date shall be coordinated and finally decided by both parties 7 ( seen ) days in adance and thereafter commissioning shall be carried out as soon as possible
在成功完成按本章節中的第74條所指定的運作測試后,最終用戶應在賣方的指引及監督下根據合同附件三中的時間表對設備進行初次運作,而上述時間表(所規定的日期)應經雙方調整並提前7天確定.而其後的試產應盡快執行The system is compatible with the various different types a / d converters, carry out the functions of the vibration signal sampling, the saving of data file, the timely wave showing, the configuration table edit, the former data return and data analysis etc. the functions of signal analysis include the time field statistics analysis, the time field mutual analyzing, the frequency spectrum analyzing, the relevant analysis, the transmission function analysis, the demodulating analysis, and the short fourier transformation of the time and frequency field etc. experiments verify that the system carry out stably and credibility, various functions is achieved, has precise analyzing results, high calculating speed and high precision, the expected targets have been reached
該系統可以兼容多種不同型號的數據採集設備,實現了振動信號的採集、數據文件的存儲、波形的實時顯示、組態表編輯、歷史數據回放與數據分析等功能。系統的信號分析功能包括時域統計分析、時域相關分析、頻譜分析、相干分析、傳遞函數分析、解調分析以及時頻分析中的短時傅立葉變換等。經試驗驗證表明,系統運行穩定可靠,各項功能工作正常,數據分析結果準確、運算速度快、精度高,達到了預期設計目的。In order to otain high quality zno thin films, we, for the first time, employ the plasma enhanced chemical vapor deposition ( pecvd ) to prepare high quality zno thin film at low temperature using a zinc organic source ( zn ( c2h5 ) 2 ) and carbon dioxide ( co2 ) gas mixtures. the effects of the growing condiction and the native oxide layer of si substrate on the quality of zno thin films was studied in detail. to prepare p - zno and overcome the dufficulty of reverse due to the interaction between the n atomic, we obtain high qulaity p - zno by a easy way of thermal zn3n2
為了在低溫下制備高質量的氧化鋅薄膜,我們採用金屬有機源和二氧化碳氣源,首次利用等離子體增強化學氣相沉積的技術在低溫下制備了高質量的氧化鋅薄膜,系統地研究了生長條件以及襯底表面氧化層對薄膜質量的影響,確定了生長高質量氧化鋅薄膜的優化條件;為獲得p - zno材料,克服在zno中摻n雜質間相互作用影響摻雜效率不易獲得p - zno的困難,我們通過熱氧化zn3n2的方法制備了p - zno ,獲得了一系列研究結果: 1 、詳細研究了氣體流速比,襯底溫度和射頻功率實驗參數對氧化鋅薄膜特性的影響。The results show that the optimal processing of 6061 aluminum foams which have structural uniformity and controlled porosity is the foaming temperature 620 - 690, heating rate 45 / min - 60 / min and heat preservation time is 12 - 18min. according to pore size tih2 content is chosen. when pore size is big, tih2 content is high and heat preservation time is short, vice versa
研究結果表明,對于實驗採用的6061鋁合金粉末材料來說,加熱發泡製備出孔隙結構均勻,孔隙率可控的泡沫鋁的最優條件是,加熱溫度為620 - 690 ,保溫時間為12 - 18min ,加熱速率為45 - 60 min , tih _ 2含量可以根據所需孔徑的大小來確定。In this paper, the author compares and analyzes the policy system of some representative countries ( or area ) and finds their policy system is perfect and has four factors : policy concept corresponding to the phrases of one country ' s ( or area ) economy development, professional policy - making body and policy - operating body, definite policy object, comprehensive policy measures corresponding to a country ' s circumstances
本文通過對幾個有代表性的國家(或地區)的中小企業政策體系的比較分析,發現這些國家(或地區)均具有較為完善的中小企業政策體系,且一般都具備四個要件,即與本國(或本地區)經濟發展階段相適應的政策理念,專門的政策制定主體與實施主體,明確的政策客體(對象) ,符合國情的全面的政策措施。In addition to the predetermined list of prerequisites, you can add your own components to the list
除了預先確定的系統必備組件列表外,還可以向該列表添加自己的組件。( 3 ) discussed the problem of option pricing under the condition of a market ' s completeness got the option ' s exact hedging trade formula. ( 4 ) with the fixed conditions of the black - scholes formula, improved the european price formula and combined the character of america option, concluded that under the same condition, call america option price equals call european option price
( 3 )利用市場的完備性條件,在完備性市場中討論了期權定價,得出在確定條件下套期交易策略的具體表達式( 4 )利用black - scholes公式的固有假設條件,對原有的歐式期權的價格計算公式進行延拓,同時結合美式期權的相關性質,得出在同等條件下,美式看漲期權和歐式看漲期權的價格相等。分享友人