確定項目 的英文怎麼說

中文拼音 [quèdìngxiàng]
確定項目 英文
identify project
  • : 形容詞1. (符合事實; 真實) true; reliable; authentic 2. (堅固; 堅定) firm
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • 確定 : 1. (明確地定下) define; fix; determine; ascertain 2. (明確而肯定) definite; certain; for sure
  • 項目 : item; article; clause; subject of entry; [體育] event
  1. Once you ' ve decided the goals and broad framework of your project, you flesh it out by creating a project plan

    確定項目標和大框架以後,就可以創建一個計劃來安排具體措施。
  2. Commercial planning of real estate development project is generally divided into two stages. the first planning stage ’ s key point is the determination of land usage and development cycle. conduct an overall market research and analysis through information collection and on - site survey, initially make out marketing strategy and product plan, and determine land using method and development cycle through financial analysis

    第一部分分析房地產開發商業規劃的概念、內容和意義;第二部分從市場調查、確定項目開發方式、商業規劃、效益分析等六個方面探討商業規劃的過程和方法;第三部分闡述了規劃實施的幾個主要問題。
  3. Perform accurate financial evaluations of proposed capital expenditures to ensure timely and profitable business decisions, and audit completed projects to determine profitability and achievement of original objectives

    對資產性支出執行精的財務評估和衡量,以確定項目的合理性和盈利性。審核完工的盈利情況和執行情況,是否存在有超支,偏離原來標。
  4. The cost engineer plays an important part in the program investment process, from the feasibility study stage, the design stage, the bidding and tendering stage, the construction stage, to the final accounting stage, the cost engineer should fix on the conceptual control purpose and measure of the program, take the step of beforehand control, in - hand control and after - hand control, in order to carry out the controlling of all the project process and direction

    造價工程師在投資控制中具有重要的作用,從可行性階段、設計階段和招投標階段、施工階段到竣工結算階段,造價工程師負擔著確定項目控制標和措施,採取事前控制、事中控制、事後控制的手段,實現對工程全過程、全方位控制。這是造價工程師在投資管理活動中所承擔的責任。
  5. Responsibility 4 : assists project dept. to confirm project const control objective

    職責四:協助管理部門確定項目成本控制標。
  6. The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine, and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan, by working out plan, following up the construction and timely error correcting management to make sure the achievement of project ' s task time

    新建的施工進度控制的關鍵是要合理地確定項目總控制工期和階段性控制工期,並將其分解落實到進度計劃中,以實現工程及早投運、及早發揮效益的標;更新改造的進度控制則要以進度計劃的落實不影響工程的年度灌溉計劃為標,採取合理制計劃、跟蹤施工、及時糾編的管理辦法,工期標的實現
  7. In this paper, some results can be obtained by post appraising the anticipation of marking, technology of product and indicator of finance of the technical - reformation project in " dalian shengdao glass c. o. t ", which are compared with the results in project feasibility researching reports to determine whether the feasibility researching is objective, fairness and scientific, on other hand, which summarize the experience and the existed defectiveness to put forward some useful suggestion for the manager of enterprise, and all of this, it can recondition and enhance the power of scientific - decision in project investment and management and offer a apocalypse for company further development

    本文通過對大連盛道玻璃製品廠技改的市場預測、產品技術、財務指標幾個方面的后評估,一方面把分析結果與可行性研究報告進行了對比,確定項目可行性研究是否客觀、公正、科學,另一方面總結執行中存在的問題,為企業經營者提出一些建設性意見,有利於進一步改善和提高投資和生產經營的科學決策水平,為今後公司的發展提供有益的啟示。
  8. Of shi jiazhuang bailong chemical co. ltd. on one hand, it compares the evaluating results of using the above - mentioned model with the results of project feasibility researching report to determine whether the feasibility researching is objective, fairness and scientific or not. on other hand, it summarizes the experience and the existed defectiveness to put forward some useful suggestion for the manager of enterprise, and all of these can improve and enhance the power of scientific - decision in project investment and management and provide some beneficial enlightenment for the further development of the company

    並利用該模型對石家莊白龍化工股份有限公司的「 3萬噸年鄰法苯酐」的技術改造進行技術經濟評價,一方面把分析結果與可行性研究報告中的進行對比,確定項目可行性研究是否公正、客觀、科學;另一方面總結執行中存在的問題,為企業經營者提出一些建設性意見,有利於進一步改善和提高投資和生產經營的科學決策水平,為公司以後的發展提供有益的啟示。
  9. The thesis contents is a " xiangrui garden " real estate item market planning, and the planning from the market investigate, form the analysis ( land value analysis, competition environment analysis, ) set out, and the strategy of basic strategy, market strategy and target of the market, here the foundation top proceeds to subdivide to target market, evaluation, choice, clear and definite target market for aiming of item, from characteristic in target market we can fix position ( target customer ' s cluster ), product in item market fixed position ( function fixed position, file time fixed position, building style fixed position, total price scope ), enter but clear and definite product, price, advertise, sale etc. market strategy

    論文內容為「祥瑞花園」房地產營銷策劃,策劃從市場調研、形式分析(土地價值分析、競爭環境分析)出發,確定項目基本戰略、營銷戰略和營銷標,在此基礎上對標市場進行細分、評價、選擇,明所針對的標市場,由標市場特徵得出市場位(標客戶群) 、產品位(功能位、檔次位、建築風格位、面積配比、格局配比、總價范圍) ,進而明產品、價格、廣告、銷售等營銷策略。
  10. Determine in what order projects run in the debugger

    確定項目在調試器中運行的順序。
  11. How to : identify how a project manages files

    如何:確定項目如何管理文件
  12. Identify all the project tasks and who or what will do them

    確定項目所有的任務及其執行者。
  13. Restricted some affixes from generating on certain item types

    限制一些不有關確定項目類型產生附加物
  14. Unfortunately, there is no single questionnaire that determines a project s exact persistence needs

    不幸地是,沒有一份調查表可以確定項目切的持久性需要。
  15. The asp. net build environment determines the language and compiler required by files within the project, based on the

    屬性確定項目內的文件所需的語言和編譯器。
  16. Once you ' ve decided which resources to include in your project, you need to add them to your project plan

    確定項目中要包含的資源后,需要將其添加到規劃中。
  17. Opens a dialog box that explains why the project file was determined to be a potential security risk

    打開一個對話框,該對話框說明為什麼確定項目文件具有潛在的安全風險。
  18. After you decide which tasks you want to include in your project, you can enter those tasks into your project plan

    確定項目中所要包含的任務后,就可以將這些任務輸入規劃中。
  19. Feasibility research must be finished before a project " s beginning. through all - sided analysis, argumentation and evaluation about marketing, resource, technique, economy and society problems relating to a project, it can confirm whether the project should be set up, or can choose the best investing scheme

    可行性研究是在擬建之前,通過對與有關的市場、資源、工程技術、經濟和社會等方面的問題進行全面分析、論證和評價,從而確定項目是否可行或選擇最佳投資方案的一工作。
  20. By raising the simple and obvious x - y axis segmentation method, the real estate market is segmented into three categories, raw, mature, potential and under cultivated markets. meanwhile, according to the investigation of tendency of several urban the real estate markets, developing theoretical mode of chongqing the real estate market is generally simulated. furthermore, all of the regional markets in our city are divided of regions : not - focused - on region, focused - on region and the region suitable for setting up the image of enterprises brand

    在本文運用的理論工具和總體框架的指導下,運用市場調查理論、波特模型、市場細分理論,對本課題所處的市場環境,包括重慶市房地產市場和與課題所在地區的宏觀經濟環境、區域環境、政策環境、城市規劃、行業環境以及消費者市場的收入水平、家庭結構、消費能力、消費心理、居住偏好、生活習慣等40餘個指標進行調查分析,對課題的競爭環境進行了研究,力圖尋找出與本相適宜的市場需求和市場營銷機會,確定項目要進入的標市場。
分享友人