碾壓法 的英文怎麼說

中文拼音 [niǎn]
碾壓法 英文
rolled-on method
  • : Ⅰ名詞(碾子) roller Ⅱ動詞1 (用碾子等使穀物去皮、破碎) grind or husk with a roller 2 (碾碎) c...
  • : 壓構詞成分。
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. On the basis of investigations into the progressive yield process and the possible failure modes of rcc gravity dams, the quasi - elasticity design limit state of the ctrtical stability criterion is proposed and the real working state of the dams designed according to the ctriterion is discussed. a check formula using the material strength reducing factor as the safety index and a simplified formula similar to against sliding stability fromula are derived. finally, the corresponding design safety factors are given by using fem calculations with various influence parameters to be taken into account

    本文在研究混凝土重力壩漸進破壞過程和可能失穩方式的基礎上,提出了以準彈性臨界作為穩定臨界準則的設計極限狀態,分析了按該準則設計的大壩的實際工作狀態,導出了以準彈性強度儲備系數為設計安全指標的審查公式以及形式與抗剪斷公式相同的簡化公式,探討了定量計算考慮各種因素影響的相應設計安全系數的合理取值,並與現行規范方進行了比較
  2. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆石壩上游坡面傳統的墊層料超填、削坡、斜坡的施工方存在許多弊端。
  3. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械施工,通過對關鍵工序如:施工測量、場區基層、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  4. On method for design of seepage control with impermeability amp; amp; drainage measures in rccds

    混凝土壩防滲與排水滲控設計方
  5. In accordance with the construction of xi ' ning - huangyuan first class highway and machangyuan - ping ' an high - speed highway, based on a good deal of investigation, this paper studies the geologic character and the main physical mechanics of the collapsibility loess in qinghai. this paper also studies the foundation treatment effect with dynamic consolidation, impact rolling, lime pile and lime - soil cushion. to dynamic consolidation, much attention is given to the relationship between the ramming energy and the effective depth

    本文結合西湟一級公路、馬平高速公路建設,對青海地區濕陷性黃土進行了大量勘探調查,總結研究了青海地區濕陷性黃土的地質結構特點、主要的物理力學性質及其規律;並通過現場試驗,系統地研究了強夯、沖擊、灰土擠密樁和灰土換填等地基處理方的施工工藝及處理效果。
  6. Study on thin - layer element and application in fem analysis of rccd dams

    探討混凝土壩薄層單元有限元分析
  7. Pigments and extenders - methods of dispersion for assessment of dispersion characteristics - dispersion using a triple - roll mill

    顏料和稀釋劑.色散特性評定用色散方.第6部分:色散用三輥
  8. In order to simulate the construction process and the effect of concrete pouring temperature and outside temperature on temperature field and thermal stress field in the dam, temperature field and thermal stress field are calculated layer by layer. the calculation step during construction is 0. 25 day, and during operation the diffusion of hydration heat of concrete is over and elastic modulus is basically stable, changeable step is used

    為了研究施工進度、混凝土澆築溫度、外界溫度對壩體溫度場和應力場的影響,按混凝土施工方每澆築一層(層厚0 . 3m ,澆築時間6小時)計算一次溫度場和應力場,這樣,施工期計算步長為0 . 25天,運行期因混凝土水化發熱已結束,且彈模基本穩定,故採用變步長計算。
  9. In this article, according to three - dimension finite element theory and heat conduction theory, the computation program of simulating thermal stress field of rcc arch dam during construction and service is researched and developed

    本文採用三維有限元和熱傳導理論,研究開發了混凝土拱壩施工期和運行期溫度應力場全過程的模擬計算程序。
  10. Plan element simulation of fracture seepage for analyzing seepage in rcc dams

    混凝土壩滲流場分析的縫面滲流平面單元模擬
  11. Seismic stability analysis of rolled compacted concrete dam based on approach of dda coupled with fem

    耦合方混凝土壩抗震安全性分析
  12. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿機的擠滑模原理,創造性使用邊墻施工,在每填築一層墊層料之前,用擠式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計鋪填壩料,用振動平面,合格后重復以上工序。
  13. In harsh climate region, the air temperature changes greatly between winter and summer. rcc dam are usually placed without bulk and longitudinal joints, and left free in winter. thus, it ' s unique thermal stress time - space distribution rule increases the difficulty of temperature control and crack control of rcc dam

    由於嚴寒地區冬季氣候寒冷、年內氣溫變化幅度大;混凝土壩採取通倉澆築、不分縱縫以及越冬長間歇式的施工方,使其具有獨特的溫度應力時空分佈規律,更增加了混凝土壩溫控與防裂難度。
  14. In this paper, applying the theory and method of system engineering and administer accountant, combining the huatan project, the optimization among the construction scheme matching machine and expenses were studied thoroughly. through the simulation and optimization in construction process, mixing and transport subsystems of huatan dam, and analyzing the influence factors of damming capability, establishing the correspond systems analysis software of dlp model

    本文應用系統工程、管理會計的理論和方,並結合花灘混凝土大壩工程實踐,系統而深入地研究了築壩的施工方案、機械配套和費用優化,對花灘混凝土壩施工過程、拌和運輸子系統的模擬和優化,分析了混凝土澆築能力的影響因素,建立了dlp模型相應的系統分析軟體。
  15. It can serve as reference material for projects of similar nature, such as compaction test process, results, test equipment and technical methods etc

    工程的試驗過程、結果,和試驗設備的配置、工藝方等,可為同類工程參考。
  16. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通過對下游壩體填築石渣料的兩個料源進行生產性試驗, ?解分析其實特性,核實設計填築標準的合理性,推薦達到填築標準的經濟合理的實方、機械類型、施工參數等。
  17. Based on the roller - compacted test, check on construction and observation during operation, the fill - criteria of the design for the dam is obtained, and then the economic and reasonable roller compacted method, including selection of the roller, mechanical parameters, watering amount for material of sandy gravel etc., is determined as well

    摘要通過試驗、施工復核及大壩運行觀測,得到了大壩的設計填築標準,從而確定了經濟合理的實方,包括實機械選型、機械參數、砂礫料加水量等。
  18. With considering the construction process of rcc gravity dam and temperature load during construction period, crack constitution model of concrete material is applied to simulated analysis of the temperature stress from construction period to operating period

    摘要考慮混凝土壩的實際成層澆築過程和施工期的溫度作用,採用混凝土開裂本構模型,利用三維瞬態有限元方模擬模擬分析了大壩施工期至運行期的溫度應力及綜合應力。
  19. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方
  20. Spreading method of horizontal push on inclined layer of roller compacted concrete

    混凝土施工中的斜層平推鋪築
分享友人