礦一波專用 的英文怎麼說

中文拼音 [kuàngzhuānyòng]
礦一波專用 英文
no protoss
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • : Ⅰ動詞(獨自掌握和佔有) monopolize; take possession alone Ⅱ形容詞(集中在一件事上的) concentrate...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  1. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤鐵路線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采層的空間展布進行地質判斷;然後採國內外較為先進的工程勘探與檢測儀(簡稱「面儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側定范圍內(共40米)進行了面測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面儀的測試結果是較為合理可信的。
分享友人