礦山經理 的英文怎麼說

中文拼音 [kuàngshānjīng]
礦山經理 英文
barmaster
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : 經動詞[紡織] (把紡好的紗或線梳整成經紗或經線) warp
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  • 經理 : 1. (經營管理) handle; manage2. (企業負責人) manager; director
  1. Article 8 the design papers for mine construction projects must comply with the safety rules and technological standards for mining industry and shall, according to regulations of the state, be subject to the approval of the authorities in charge of mining enterprises ; those failing to comply with the safety rules and technological standards for mining industry may not be approved

    第八條建設工程的設計文件,必須符合安全規程和行業技術規范,並按照國家規定企業的主管部門批準;不符合安全規程和行業技術規范的,不得批準。
  2. The multiplex, steady, sustainable supply system of mineral resource should be built by improving investment circumstances to attract foreign capitals, exploring mineral resource to increase deposits, taking advantage of foreign mineral products, protecting and utilizing reasonably the mineral resource ; the mining environment should be improved and the ecological mine should be built by exploring new pattern, carrying clean production and so on. mining enterprises should prompt core competence by forming large mining groups, exploiting human resources, increasing economic benefit, optimizing the industry and product structure and so on. epilog : it summarizes this paper ' s basic view and points out the problems that we should continue to solve in the future

    樹立環境意識和生態意識,使人和自然協調發展;大力改善投資環境,吸引外部資金,探增儲,充分利用國外產資源,保護、節約、合利用產資源,建立多元、穩定的產資源可持續供應體系;通過探索新機制,依靠科技進步,推行清潔生產等措施來改善環境,建設生態企業通過不斷創新,組建大型業集團,以人為本大力開發人力資源,濟集約增長,優化產業結構和產品結構等措施,提升企業的核心競爭力,使濟、社會和環境相互協調,實現企業的持續、健康發展。
  3. This thesis primarily makes below the work of a few aspects : ( 1 ) the method to append the section line in the geological section plane and the geological plane graph intersected each other ; ( 2 ) the principle and method that automatic determinate of orebody on transverse section with the neural network theory was presented, and draw the slippery boundary of ore ; ( 3 ) the method that drawing the surveying well and lane way engineering in the geological and survey graph ; ( 4 ) the method to automatic calculation and statistics output ore reserves and grade ; ( 5 ) the method that automatic creating the geology cross section of the hole ; this thesis realizes automation for managing geological graph based on the substantive research work

    本論文主要作了以下幾個方面的工作: ( 1 )提出了在相交平面圖和剖面圖中添加剖面剖切線的方法; ( 2 )提出了應用人工神網路論確定剖面中體界線的論和方法以及巖界線圓滑的原與方法; ( 3 )實現了生產實測工程數據處與地測圖件的有機結合; ( 4 )實現了塊地質品位和儲量的自動計算和統計輸出; ( 5 )提出了中深孔炮孔排面地質剖面圖自動剖切的原和方法。本論文在大量研究工作基礎上,實現了地測圖件管的計算機自動化。
  4. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司過多年的基本建設和技術改造,現已成為一個組織管機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,測試方法完善,可以獨立設計、製造大型電站、冶煉、軋鋼、鍛壓、、水泥建材設備和大型優質鑄鍛件的現代化大型企業。
  5. Wu da lian chi mt, spring mineral water co, ltd was round in 1998 and has now become one of the leading private enterprises in wu da lian chi ciry, after 10 years of hard working of general manager du chao li and his staff, the compar ' s annual production has now amounted to rmb million and has paid a total tax of million to the state treasury. the company has been granted the " consumer - trusted enterprise " award consecutirely for many years

    五大連池泉泉水有限責任公司座落在國家級重點風景名勝區迎賓東大街6號,自1988年建廠以來,在杜朝利總的帶領下,過全體員工十余年的不懈努力,現已發展成為五大連池市較大的先進私營企業,公司曾連續多年被評定為省級消費者信得過單位。
  6. Article 42 where a mine construction project is started without having the designs of its safety facilities approved, the mining enterprise concerned shall be ordered by the authorities in charge of mining enterprises to stop the construction ; with respect to the mining enterprise refusing to carry out the order, the matter shall be submitted by the authorities in charge of mining enterprises to the relevant people ' s government at or above the county level for a decision on the rescission of its mining permit and business license by the competent authorities

    第四十二條建設工程安全設施的設計未批準擅自施工的,由管企業的主管部門責令停止施工;拒不執行的,由管企業的主管部門提請縣級以上人民政府決定由有關主管部門吊銷其采許可證和營業執照。
  7. Article 27 managers of mines must prove, through examination, to have special knowledge of safety and the capability of leading safe production and disposing of accidents in mines

    第二十七條長必須過考核,具備安全專業知識,具有領導安全生產和處事故的能力。
  8. Give actual mine transportation vechile system and transportation routs conditions, it can automatically find out satisfactory solutions to vechile scheduling design through genetic operations such as reproduction, crossover and mutation, etc. a new mean is offered in mining management automazation and intelligence

    對于給定的運輸車輛系統和運輸線路,過遺傳演算法的復制、交換、突變等操作可以自動得出滿意的車輛調度方案,為采生產管的自動化和智能化提供了一種新工具、新方法。
  9. One of the existing problems of the mine at present is : when the south open stope is over in 2005, where does the open north stope start for the sake of optimizing economic benefit and social benefit and environmental benefit of the mine facing to this problem, based on the large number real data of mine, in view of fuzzy attribute and complexity attribute existing in mine production, this paper applies fuzzy multi - attributes decision method to a lot of feasible technology, economy rational for schemes to appraise to proposes

    當前生產存在的問題之一是:南露天采場將於2005年開采結束,何處啟動北露天采場,才能使得濟效益、社會效益、環境效益保持最優化?針對銅綠銅鐵北露天何處啟動最優這一問題,本文在收集大量銅生產實際資料基礎上,針對生產中存在的模糊性和復雜性,提出運用模糊多屬性決策方法對多個技術可行、濟合方案進行評價。
  10. Abstract : the safety management is one of the important content for the enterprise management on the mine. the safe civilized production can ensure production operation smoothly. once safe production has been met several unfavorable factors at transform structure in the mine enterprise, as a result, the production included plenty of passive and difficult position. if all leaders and clerks changed ideas “ the safety first and putling prevention first ”, the management work would must push forward for the development of the mine enterprise

    文摘:安全管工作是企業管的重要內容之一,安全文明生產是生產營活動順利進行的保證,企業在轉機建制中安全管工作遇到諸多不利因素,導致安全管工作一度出現被動與無序的局面,只要各級領導和全體職工提高認識,轉變觀念,牢固樹立「安全第一,預防為主」的思想,落實安全生產責任制,全方位開展安全生產標準化的創建,形成有效的安全文化氛圍,安全管工作必將對企業的發展起到巨大的推動作用。
  11. Surface settlement is due to layer losses and the layer losses are due to the changes of stress state and water content. it is necessary to probe into the principle, but to pay more attention to the aftermath of layer losses - surface settlement and its regularity. this paper has focused on discussing about the regularity of surface settlement in tunneling construction

    地表之所以發生沉降,是因為發生了地層損失,而地層損失主要是由於土的應力狀態和土的含水量發生了變化,機的探討是必要的,但是人們更關心地層損失造成的後果?地表沉降,更關心地表沉降的規律性,本文討論了隧道施工過程中地表沉降的規律,將隧道施工方法分為盾構法和法兩種,結合論分析和實測結果,分別給出了地表沉降曲線和沉降范圍的驗公式,其結論對北京地鐵隧道的設計與施工具有重要的參考價值。
  12. Thus we get a perfect answer using bp neural network to evaluate the risks of mining project

    因此文章認為用bp神網路系統對投資項目的風險評判結果是比較想的。
  13. To achieve a reasonable charging construction, by analyzing g. harries ' s mathematics model theoretic and calculating the parameter of explosive construction by using delphi programmable language programming the program. the result analyzing of blasting test approves that optimization of explosive construction can give the economic benefit for mine

    為尋求合的裝藥結構,對g . harrise數學模型進行了論分析,採用delphi語言編制計算機程序計算裝藥結構參數,爆破試驗結果分析證實裝藥結構優化可以為帶來濟效益;根據分形幾何論,探討了巖石爆破塊度的分形特徵,不同裝藥結構爆破試驗的破碎塊度均顯現出了良好的分形結構。
  14. Pass possibility towards press spirit equipments open emerge a contrast test, pressed the spirit equipments to provide for right choice basis, bring upped the adoption many cents area independence provide the spirit with adopt the pit inside press the spirit to stand completely replace the current ground press what spirit stand to reform the project, and combine to synthesize the argument that project the technique with the economy ' s rationality that mines, the right similar term press the ref orming of spirit system to have the certain leading meaning

    通過對壓氣設備進行現場對比測試,為正確選擇井下壓氣設備提供了科學依據。從而,提出了採用多分區獨立供氣和建立井下壓氣站全面代替目前地面壓氣站的改造方案,綜合論證了該方案的技術可行性和濟合性。該研究方法和研究成果對類似條件的壓氣系統改造具有一定的指導意義和推廣應用價值。
  15. This paper analyses the problems in reducing costs in metallic mines and presents that economizing energy and enhancing safety are two workable approaches to the efficient safety economy

    摘要本文從節能及加強安全管兩方面時減少金屬的安全濟投入問題進行了分析與探討,達到提高安全濟運行效率的目的。
  16. So, in this system, we collected geological and mining information about the mine, investigated and researched about the regional geology and the features of rock and mine body. it establishes mathematic and economical model of this the mineral deposit and mining area warehouse about map and description of cu - ni sulfided mine of baimazai in jin - ping county using the software of mathematic and economical model and mapgis

    為此,系統搜集了與有關的地質、采圖文資料,對區域地質、巖體及體特徵展開了詳細的野外地質調查和深入的室內研究。分別運用床數學濟模型軟體和mapgis地信息系統軟體建立了金平白馬寨銅鎳硫化床數學濟模型和區圖文庫。
  17. An organization of visitors, both domestic and foreign enterprises machinery industry experts and scholars, managers, technical personnel, etc. 2. automobile manufacturers, aerospace, power water, electrical, shipbuilding, farm machinery, engineering machinery, oil drilling, mining machinery, transport machinery bearings and other industrial areas, general manager president, procurement manager staff new product research and development, marketing and machinery for the industrial demand, traders and others came to visit

    1組織國內外機械行業企事業單位專家學者管人員技術人員等2汽車生產廠家航空航天電力水利工程電機船舶農用機械工程機械石油鉆探機械交通運輸機械等軸承工業應用領域的總董事長采購部人員新產品研究開發人員營銷主管及機械工業相關的需求商貿易商等前來參觀。
  18. Because this kind of right is similar to option and regarded as call option, it is logical to draw lessons from the theory of option pricing to evaluate mineral resources assets

    因此,建立能考慮和處營者在營管中的靈活性的產資源資產估價方法是非常必要的。 black 、 scholes和merton提出的金融期權論為此提供了基礎。
  19. Enmax equipment has been used in these industries throughout the world : horizontal directional drilling, petroleum, micro - tunneling, petrol - chemical, dredging, environmental, mining, municipalities and pit remediation

    這些設備在世界范圍內已在非開挖水平定向鉆井、油田、微型隧道、石油化工、淤泥處、環保、、市政和廢漿池土壤恢復等工業領域得以利用。
  20. Abstract : the ways of improving economic benefits of mines were discussed in terms of such various facts as adapting to market environment and changing management idea ; exploiting the advantages of mine itself and developing new source of income ; relying on scientific and technological progress and scientific management and reducing management cost ; establishing market view and determing production in accordance with the sale etc

    文摘:從適應市場環境,轉變營觀念;發揮自身優勢,開拓新的收入來源;依靠科技進步和科學管,降低營成本;樹立市場觀念,以銷定產等多個方面討論了改善濟效益的途徑。
分享友人