移行塑性鉸 的英文怎麼說

中文拼音 [hángxìngjiǎo]
移行塑性鉸 英文
travelling plastic hinge
  • : Ⅰ動詞1. (移動) move; remove; shift 2. (改變; 變動) change; alter Ⅱ名詞(姓氏) a surname
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 動詞(塑造) model; mould
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ動詞[口語]1. (用剪子剪斷東西) cut with scissors 2. (用絞刀切削) bore with a reamer; ream Ⅱ名詞(指鉸鏈) hinge
  1. Travelling plastic hinge

    移行塑性鉸
  2. This article deduced the calculation method of column hinge sway in framework structure by analyzing plastic sway of the column hinge sway mechanism ? the most dangerous collapse model in the framework structure with the virtual principle of plastic analysis, and calculated two framework structures and the results is almost the same as those calculated by method of plastic analysis

    通過對框架結構最危險的倒塌模型? ?柱形側機構,對薄弱層的變形通過分析的虛功原理推求框架結構柱形側的計算方法,應用此計算方法對大連市兩棟框架結構進計算,其結果與彈時程分析法結果基本相符。
  3. Then, this paper edits other computer program to calculate thirty sgrc frame columns, and researches the drift capacity of sgrc frame column, and analysis the turning capacity of frame column " s plastic hinge. then the relational expression of the curvature ductility factor and ratio of hoops of sgrc frame columns is derived. this paper analysis the relation of the curvature ductility factor and the relative drift of sgrc frame columns, and discuss the question of the minimum values of ratios of hoops of sgrc frame column at different axial load ratios

    一11一太原理工大學碩_ i :學位論文使用本文程序另外模擬計算了30榻煤研石混凝土框架,進一步分析了軸壓比和配箍率對煤研石混凝土框架柱曲率延的影響,編寫程序計算了30根煤研石混凝土框架柱,對煤研石混凝土框架柱的側向變形能力進了研究,分析了柱的轉動能力,導出了煤研石混凝土框架柱的曲率延系數與配箍率的關系式,分析了煤研石混凝土框架柱的曲率延系數與框架柱相對側向位的關系,討論了煤研石混凝土框架柱在不同軸壓比下最小配箍率的取值問題。
  4. The experimental research for beam - to - column connections of steel frame and the research influence on the steel frame is one subject of 2001 ' key research subject of ministry of construction of china, grant no. 01 - 2 - 085. researching for of beam - to - column connections under cyclic loading, for the factors effecting on the connections, for the deformation and failure character of connections, the arising order of plastic hinges and load - deformation hysteretic behavior of three pane frame under cyclic loading, the effect of semi - rigid connections on the frames, is the major purpose of this study

    本文進的鋼框架樑柱連接的試驗研究和對框架的影響研究是建設部2001年科技攻關項目《新型空腔結構板輕鋼結構體系應用研究》的子課題,旨在研究樑柱連接在循環荷載作用下的滯回能、影響連接的各種因素、連接變形特徵和破壞特徵;研究三榀平面鋼框架在循環荷載作用下構件出現的順序, p ?的滯回能以及半剛連接對框架側以及出現順序的影響。
  5. The contents include as follows : the influencing factors of the displacement ductility factor of the unbonded partially prestressed concrete frame structures, such as stirrup reinforcement characteristic value, nominal shear span ratio, axial compression ratio, the appearing order of plastic hinges and partial prestressing ralio ( ppr ) are discussed. the formula of displacement ductility factor of the unbonded partially prestressed concrete frame structures is suggested by regression analysis. with regard to the aseismic design and the request of ductility and energy dissipation, the restriction of the flat - beam / column sectional size and aseismic reinforced design are discussed

    本文主要包括以下內容:討論了配箍特徵值、名義剪跨比、軸壓比、出現順序、預應力度等因素對無粘結部分預應力混凝土框架位系數的影響,回歸了考慮影響因素的位系數計算公式;對無粘結部分預應力混凝土扁梁框架結構,闡述了抗震設計對扁梁、柱截面尺寸的要求與限制;對滿足延和耗能要求的無粘結部分預應力混凝土扁梁控制截面抗震配筋進了探討;通過對無粘結部分預應力混凝土扁梁梁端的受力分析,改進了以往扁梁梁端扭矩設計值計算公式。
分享友人