移錨位 的英文怎麼說

中文拼音 [máowèi]
移錨位 英文
shift anchorage
  • : Ⅰ動詞1. (移動) move; remove; shift 2. (改變; 變動) change; alter Ⅱ名詞(姓氏) a surname
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性點理論,從等效均化的角度來考慮桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應力場、場的變化規律進行了研究,分析了加支護對隧洞圍巖應力、變形的影響。
  2. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究桿在不同荷載作用下,桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了桿受力的模型實驗研究,根據實驗結果提出了剪應力與的彈塑性本構關系表達式,並根據桿受力的基本方程,求解得出了桿在不同工作狀態下從彈性到彈塑性滑的全過程中桿的內力分佈。
  3. This method decrease the beacon cost to the least, and gets the special distribution of reference positions through controlling the moving route of the beacon, therefore can effectively overcome the beacon sacristy problem

    這種方法將節點成本減到最少,並且通過對節點動路線的控制實現了參照置的特殊分佈,可以有效克服節點稀疏問題。
  4. The anchorage force of bolt, the displacement of deep surrounding rock, and the surface displacement of the gateway were comprehensively observed, indicating that the testing entry affected by dynamical mining pressure still keeps stable, achieving a good supporting effect

    桿受力、圍巖深部、頂板離層及巷道表面綜合觀測表明,受回採動壓影響后,試驗巷道穩定,支護效果好。
  5. S. consideration of interaction on the nonlinearity about the material, the geometry, and the boundary of the columns subject to axial force. biaxial hending, and torsion, an analytical model of hysteretic curve of columns is presented, based on the sectional cross - sectional discrete yieldsurface inodel, the bond slip in anchorage zones regarded as the boundary nonlinearity of a memher. and the iterative procedure of displacement of inner nodes on the basis of the hamonization of displacement

    5 、根據構件分段截面離散的屈服面模型法,把固區粘結滑看成構件的邊界非線,以及基於協調的內結點迭代法,建立了能考慮構件壓(拉) 、雙彎、扭的材料、邊界、幾何非線性相互影響的柱空間滯回曲線分析模型。
  6. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將索視為彈性絞支座,利用抗滑樁和變形協調條件,計算出不同樁底條件下抗滑樁的內力分佈。
  7. Rebounding displacement of slope and axial force of anchor bars increases as the increment of the included angle of the rebounding displacement vector and x positive axis will reduce as the increment of horizontal tectonic stresses. the reduction of lithologic characters and weak interplayer have unfavorable influence on stability

    支護稈軸力也增大;隨著水平構造應力的增加,回彈矢量與水平x軸正方向所形成的角度將減小;邊坡巖體巖性參數的弱化和軟弱央層的存在都對邊坡的穩定造成不利的鍘惻。
  8. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下碇沉井基礎與地基土的變形變規律,著重分析了影響散索鞍水平的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平間的擬合關系。
  9. The use of, cheaper, concrete blocks as anchor points is not suitable as they have a large footprint, are difficult to position precisely and tend to move if large boats are moored to them, which will cause damage to the corals

    使用價廉的混凝土海並不合適,原因是這些海?用大面積海床,而且不容易定,較大型船隻使用此類浮標時會,對珊瑚造成損害。
  10. ( 6 ) the thesis puts forward the pile - top displacement control method, and it can account the least force of the anchor wire on anti - slide pile

    ( 6 )本文提出了拉抗滑樁拉力計算的樁頂控製法,計算控制樁頂所需的最小拉力。
  11. The formula of the maximum lateral deformation has been proposed for tie - back wall when the anchors are embedded in unmoving soils or in rocks. this work has enlarged the application field of the previous deformation formula. examples from engineering practice prove that the values calculated with above formulas can meet the need of the pit engineering

    將上面的變形計算公式做了推廣,提出了撐擋墻最大側向的預測公式(固不可動的土層或巖石中) ,工程實例表明,利用該式預測的變形值可以滿足工程的需要。
  12. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩定性安全監測措施,主要包括邊坡水平觀測及支護結構撓度觀測;沉降觀測;以及桿應力監測;助梁鋼筋應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的趨勢與發展。
  13. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點計觀測和鉆孔桿應力計檢測的結果進行綜合反演分析,提出了水下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層動提供了依據。
  14. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力索的點施加索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  15. Considering the difference in application scale, we designed a proximity based mobile beacon assisted localization algorithm ( pmaloc ) for the application of small scale, and designed a distance - in - hops based mobile beacon assisted localization algorithm ( hmaloc ) for the application of large scale

    演算法設計時考慮到應用規模的不同:針對小規模應用,設計了基於鄰近關系的節點輔助定演算法( pmaloc ) ;針對大規模應用,設計了基於跳計數的節點輔助定演算法( hmaloc ) 。
  16. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊、地表下沉、圍巖與噴層壓力、圍巖體內部桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  17. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈傳感器,測得卡瓦定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  18. Influences of axis inclination, length, clamping angle of anchorage, roughness and bonding degree of interface on the displacement of anchorage and repose stability of rock mass were explored

    碇體軸線傾角、長度、夾持角、接觸界面粗糙度及結合程度對和巖體安息穩定性的影響作了深入探討。
  19. 2. based on the mindlin ’ s solution of displacement, the distributing expressions of the shear stress and the axial force in anchorage are derived, and the mechanical characteristic of anchorage is analyzed, which indicates the mechanics of the support more deeply. the method of confirming the length of anchorage is proposed

    2 、根據mindlin 』 s問題的解,推導出了桿的界面剪應力和軸力分佈規律,並分析了桿的受力特性,進一步了解桿柔性支護的作用機理,在此基礎上提出確定固長度的計算公式。
  20. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    支護是一種常見的基坑支護模式,本文以樁支護結構水平為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁頂水平的影響進行了分析,指出在樁支護體系中,桿支撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
分享友人