積水坑 的英文怎麼說
中文拼音 [jīshuǐkēng]
積水坑
英文
plash-
I want to sail sticks across a fresh mud puddle, skid rocks across the millpond and make a sidewalk with rocks
我想在新積起的泥水坑邊玩耍,讓小木棍從一頭漂到另一頭;用石子在磨坊貯水池打水漂兒,並用石頭堆出人行道But he leaped across the plashy places, thrust himself through the clinging underbrush, climbed the ascent, plunged into the hollow, and overcame, in short, all the difficulties of the track, with an unweariable activity that astonished him
但他跨越了積水的坑窪,穿過了絆腿的灌木,爬上了高坡,步入了低谷,總而言之,以他自己都不解的不知疲倦的活力,克服了路上的一切障礙。Until now, if a player s ball is affected by casual water in a bunker, he has the option of coming out of the bunker under penalty of one stroke, but he did not have this option if an immovable obstruction such as steps interfered with his stroke
目前,若高球落點是位於沙坑臨時積水的話,球手可選擇被罰一桿而將球置於沙坑外再繼續比賽。但此例並不適用於落點是位於不能移動障礙物的情況例如梯級。( 5 ) the author researches the relationship between the deep foundation ' s shape, area and depth and the deep excavation dewatering. the formula, which calculates the minimum distance between foundation ' s bottom panel and the confined water layer ' s top panel, was put forward
(五)研究了基坑形狀、面積、深度與深基坑降水相關性,給出了計算基坑底板至承壓含水層頂板間的最小距離公式,分析了針對不同基坑應採用的降水方法。It can not only meet the need of water saving, water holding, drought resistance, but also make the best use of local rainfall runoff and efficiently reduce soil erosion. the research on it ' s theory and appliance will promote the development of orchard water saving irrigation and ecosystem and project of soil and water conservation
蓄水坑灌法是一種適合於我國北方山丘區的果林灌溉新方法,既可滿足節水、保水、抗旱的要求又能充分利用當地降雨徑流和有效控制水土流失。對該方法進行理論和應用研究將對我國北方地區果林節水灌溉和水土保持與生態建設起到積極的促進作用。The basic theory of dewatering, the dewatering calculation methods, the impact of dewatering on the surrounding environment, the definition of hydrogeology parameters and the shape, area and depth of the deep foundation dominate over this dissertation
其中,降水的基本理論、降水的計算方法、降水對周邊環境的影響、水文地質參數的確定、降水井結構以及基坑形狀、面積、深度與深基坑降水相關性是本文的研究重點。Apparently what happened was that water collected on these tar pits, and the bigger animals like the elephants ventured out on to the apparently firm surface to drink, and were promptly bogged in the tar
當時的情況顯然是,瀝青坑裡積存了水,大象那樣的大動物冒險到似乎堅固的冰面上去飲水,立即掉進了瀝青坑。The proposed method also can be applied to some other geotechnical engineering, such as excavation and supporting of deep pit, foundation treatment, wide area excavation, ground water treatment and so on
這一方法也可用於深基坑開挖與支護、地基處理、大面積開挖和地下水防治等巖土工程。A 1300 - acre course surrounded by a 110, 000 square meter lake and 150 bunkers
總面積為1300畝,擁有11萬平方米的水域面積和150餘個沙坑。Rovers spirit and opportunity had stated on mars surface for 3 years, and discovered the ancient sedimentary rocks that directly proved the existence of water on the red planet
漫遊車勇氣號及機遇號分別在火星的古塞夫隕石坑及子午平原上逗留了超過三年,發現了遠古時代留下的沉積巖,直接證實火星遠古時代液態水的存在。Some of the water ponded in the crater, forming the layers of hematite - bearing sediments
一部份的水在隕石坑裡形成水塘,造成一層層含有赤鐵礦的沉積物。In many parts of australia standing water, that is dams, puddles and so forth, dry up rapidly and some rainfall barely penetrates the soil
澳大利亞大部分積水,大壩、水坑等等,乾的很快,一些雨水只是滲透泥土。In the case of the solution of the problem, the effect of seepage, such as seepage force, should be paid a great attention to
因此要解決深基坑開挖變形穩定性問題,就應重視地下水流在孔隙介質中產生的滲透體積力。The sequential construction and operation of the pits has been used to develop scenarios for sediment transport modelling, assess marine traffic issues and identify key environmental issues for water quality, ecology, fisheries, human health, noise and heritage assessments
此研究利用泥坑循序漸進的施工及運作模式,建立沉積物擴散模擬方案,評估海上交通情況和找出主要環境問題,包括:水質生態漁業人類健康噪音及文化遺產評估等。The sequential construction and operation of the pits has been used to develop scenarios for sediment transport modelling, assess marine traffic issues and identify key environmental issues for the water quality, ecology, fisheries, human health, noise and heritage assessments
此研究利用泥坑循序漸進的施工及運作模式,建立沉積物擴散模擬方案,評估海上交通情況和找出主要環境問題,包括:水質生態漁業人類健康噪音及文化遺產評估等。分享友人