積算溫度 的英文怎麼說

中文拼音 [suànwēn]
積算溫度 英文
cumulated temperature
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 溫度 : [物理學] temperature
  1. Hyperbola model of mgo - mixed concrete ' s autogeny deformation, especially deduce of the model ' s parameter and building process of the model are analyzed in detail. ( 2 ) calculating method of autogeny deformation and creep are discussed. based on these, timely - simulation theory of dam body ' s temperature field stress field and pre - process back - process method are mainly studied

    ( 2 )對mgo混凝土的自生體變形及徐變變形的計方法進行了探討,在此基礎上,重點研究了壩體場和應力場實時模擬的原理以及前後處理方法。
  2. Study on cold wave - induced temperature stresses of mass concrete

    驟降時大體混凝土的應力計
  3. The temperature rise at the center of a massive concrete wall is calculated by using the adiabatic rise of temperature and heat conduction equations of concrete based on the equivalent time, and considering effects of temperature on the hydration heat reaction ratio and creep characteristics of early - age concrete

    摘要基於等效時間的混凝土絕熱升、熱傳導方程,考慮對早期混凝土水化熱化學反應速率和徐變特性的影響,計了大體混凝土墻中心的升。
  4. Modbus transducer is the key device in the system and is used to offer power supply of pressure and temperature sensor, to collect signal, to linearizate and compensate temperature, to calculate density, volume and mass, to transmit data to modbus network, and display the data. so the modbus transducer is a multi - parament measurement, intelligent control device which can manage multi - signal

    變送器是系統的核心設備,其作用是為油罐、壓力、液位、可燃氣濃等傳感器供電,採集傳感器信號並進行線性化、補償等處理,完成密、體和質量等參數計,將數據輸出到modbus現場總線測控網路,根據需要現場顯示計測量參數。
  5. But when the wind - speed becomes above 1m / s hereafter, wind - speed increase for the cpu thermal siphon of transmit heat the ability ' s gain result the deceleration. so it is considered perfect when the wind - speed is 1m / s. through this experimentation we found that when the cpu thermal syphon cooling machine used acetone as working fluid, wind - speed 1m / s, cpu chip caloricty 60w, its volumetric heat release rate came to 1. 3 104w / ( m3k )

    通過本次實驗測出所使用的cpu重力熱管散熱器在使用丙酮為工質,風速1m / s , cpu晶元發熱量為60w時,其體散熱率達到1 . 3 104w / ( m3k ) ,能保證晶元與環境之差小於40 ,能很好的適應pentium -計機長期運行的要求。
  6. During the period of measurement, the transduction circuits transform the differential pressures, the absolute pressures and the temperatures received by the sensors into the voltage signals, and then, the voltage signals are transformed into digital signals by the a / d convertor. the mcu processes these digital signals and calculates the cumulation of the flow. finally the totalizers contact with the pc by rs - 485 bus to form a distributed measuring network

    在測量過程中,系統以流量計節流所獲得的差壓信號作為主信號、絕壓和信號作為補償信號進行流量,這三種信號分別由相應傳感器感知后,經各自的物理信號測量電路轉換為電信號,再由a / d轉換模塊轉變為數字量,交微控制器進行處理、
  7. Abstract : based on the analysis of the mathematics models of saturation steam density and superheat steam density the paper states that the deviation of the detection on temperature highly affects the accuracy of intelligent flow totalizer. especially for saturation steam , the accuracy of the temperature detection circuit shall be designed higher than the accuracy of the instrument. thus a temperature detection circuit based on ratio method with high accuracy is introduced

    文摘:在分析飽和蒸汽和過熱蒸汽密的數學模型的基礎上指出,檢測的偏差對智能流量儀的精影響極大,尤其是飽和蒸汽,測電路的精應設計為遠高於儀表的精,同時引入一種基於比率法的高精電路。
  8. An estimation of brightness temperature for vegetated surface by matrix doubling method and iem

    用雙矩陣法和分方程模型估地表的亮
  9. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    中考慮了混凝土的絕熱升、彈性模量、徐變和自生體變形隨齡期的變化以及分層澆築、夏季停工、外界氣變化、表面保、通水冷卻及分期蓄水等因素對壩體應力場的影響。
  10. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始不連續,逐日的氣變化,混凝土的入倉,水化熱升,邊界保,水庫蓄水過程,澆築間歇以及灑水養生等因素;應力場的計考慮了混凝土的自重,靜水壓力,應力,常態混凝土與碾壓混凝土不同的自生體變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  11. According to the demand of the concept design of china spallation neutron source ( csns ), the target station, i. e. the target, the reflector and the moderator have been simulated and optimized using monte carlo simulation software, nmtc / jam and mcnp4a, firstly. the neutron flux escaping from the target and the moderator and the heat deposition in the target, the reflector and the moderator are calculated. these results provided essential data as a basis of the spallation neutron source design

    本論文結合當前中國散裂中子源( chinaspallationneutronsource , csns )工程概念設計的迫切需要,選擇國際上廣泛使用的基於蒙特?卡羅方法,用於模擬粒子輸運過程的程序mcnp4a和nmtc jam作為研究工具,首次對csns靶站進行了全面的模擬與優化,內容包括靶、反射體與慢化器系統的中子通量分佈以及熱量沉,同時計了靶的場與應力場分佈。
  12. The key items influent on the characteristics of spraying have been also studied in the dissertation, we can get a good spraying result by adjusting the related parameters efficiently. ( 3 ) the theoretical model of the dynamical parameters such as temperature, moisture, pressure and contour for hot medium and particle inside the drying chamber were obtained by model, utilized the computational fluid dynamics technique to solve the problem between spraying droplets medium by arranging the double grid dispersing structure and rotary outlet structure and the developed structure improved the drying efficiency and product quality

    ( 3 )採用-模型實現了壓力噴霧乾燥塔的場、濕場、流場的理論建模,利用計流體力學( cfd )技術來解決噴霧乾燥過程中熱介質與霧滴間的傳熱傳質以及動量傳遞和湍流擾動等問題,避免了乾燥過程中的設計不合理狀況;通過增加雙格柵均風裝置和旋轉出風裝置,改善了乾燥塔內的熱質傳遞,提高了乾燥塔的體蒸發強
  13. Changing temperature velocity in inner barrel is not a stable constant, and it will vary with advancement of measuring from time to time, thus cooling emendation quadrature model is established to compensate temperature dissipation

    提出以內外桶差導致的量熱系統變化的速對主期測量時間進行分的冷卻校正計模型。
  14. The ade7758 is a high accuracy 3 - phase electrical energy measurement ic. it incorporates adcs, a digital integrator, reference circuitry, temperature sensor, and all the signal processing required performing active, reactive, and apparent energy measurement and rms calculations

    Ade7758是高精三相電量測量專用晶元,它集成了adc 、數字分器、參考電路、傳感器以及電能測量和有效值計的數字處理模塊。
  15. Based the humidity theory, the paper adopts the relative humidity as the character value and puts forward using 30 % rh and below 0c dew - point as the on - line monitoring critical value. it gives the method of volume ratio convert at the different temperature. with the standard value, we can conclude the result of moisture content

    針對現有規程標準中控制水分的指標的缺點和局限,提出了採用相對濕作為監測特徵量並轉換為露點以直觀表示設備絕緣狀況:採用30相對濕及0以下露點作為監測的臨界值與允許值;同時推導出了體比單位在不同下的折方法,以結合現有標準,綜合分析,做出判斷結論。
  16. Temperature control and crack prevention of concrete - the simulation analysis characteristics of dams construction with mgo concrete, the theory apply " equivalent time " to the model for computing autogenous volumetric change of concrete which be relate to temperature history. it makes computing autogenous volumetric change of concrete be realized at case of arbitrary temperature history, so the problem puzzled engineer over a long period of time may be dispelled

    針對控防裂的一項新技術?外摻mgo混凝土築壩技術的模擬計特點,提出了應用「有效時間」理論,來考慮自生體變形與歷史有關的膨脹模型,使長期以來困繞工程界有關外摻mgo在任意歷史下產生的膨脹變形的應力補償計成為可能。
  17. The accumulated temperature of each stage of cynoglossus semilaevis gu nther was calculated with the record of the time and the temperature according to the principle of accumulated temperature. the summation of all the accumulated temperature was necessary with which the fertilized egg could get through its development of the embryo stage. the summation was 837. 92 ( hour * ), and the average temperature was calculated to be 21. 0 according to the summation and the total time

    通過對孵化時的和時間的記錄,由法則計出半滑舌鰨各個發育期所需要的,整個孵化期所需總為各個發育期的之和,最終結果為50275 . 1 ( min ~ * ) ,孵化的平均通過總和孵化總時間計得,孵化階段的平均為21 . 0 。
  18. Using piezoresistive accelerometers and magnetoresistance sensors measure the dynamic acceleration and geomagnetic field and through avr mcu software to calculate the attitude angular and azimuth. the fact of affecting the module is discussed in detail in this report and put forward the resolving scheme of key technology of digital filter, linear compensation, temperature compensation and magnetic field adjustment. the digital module has advantages of small size, light weight, low conception, high accuracy, all solid state and high reliability

    本課題採用壓阻式加速計和磁阻傳感器分別測量重力加速和地磁場,通過avrmcu軟體解出姿態角和方位角,課題詳細分析了影響模塊性能指標的因素,就數字濾波、線性補償、補償、磁場修正等關鍵的技術問題提出了可行的解決方案,研製的數字化模塊具有體小、重量輕、低功耗、精高、全固態、高可靠等特點,所有性能指標均滿足設計要求,為姿態角測量提供了有效的手段。
  19. 3 the design theories of cooling pipe of play down internal temperature of mass concrete about diameter, length, arrange method, rate of flow, current velocity, reduce heat time, temperature disparity to in and out, reduce heating result etc. 4 the theory of influence about concrete internal temperature and concrete crack because of transform of mixture ratio and pulverized fuel ash sophisticate quantity

    西安建築科技大學博士生論文一;一;一一『一一一3降低大體混凝土內部常用的冷卻水管的管徑、長、布置方法、水流量、流速、降時間、進出水口的差、降效果等的設計計理論。 4配合比及摻加料對混凝土內部和混凝土開裂的影響理論。
  20. Calculation of scuffing load capacity of cylindrical, bevel and hypoid gears - part 2 : integral temperature method

    圓柱齒輪錐齒輪和準雙曲面齒輪膠合承載能力計方法第2部分:
分享友人