穩定區范圍 的英文怎麼說

中文拼音 [wěndìngfànwéi]
穩定區范圍 英文
stability range
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 區名詞(姓氏) a surname
  • : 名詞1 [書面語] (模子) pattern; mould; matrix 2 (模範; 榜樣) model; example 3 (范圍) boundar...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  • 范圍 : scope; limits; extent; boundary; confines; range; range dimension; spectrum
  1. After the effective interval is analyzed, the dissertation moves on to the bargaining process, which is divided into two different stages, information exchanging and bargaining. quoting - dickering occurs in the stage of information exchanging, but it is different from that in the stage of bargaining. the former can be interpreted as that a stable " common interval " are introduced by all kinds of information exchanging, in which the trade ceases if any party expects the final price is not in the interval and the other can not change his expectation

    信息交換階段雖然也有「報價還價」的現象,但是此時的「報價還價」不同於討價還價階段的「報價還價」 ,因為前者是在進行信息交換並通過各種可能的信息交換方式來得到一個的「共同間」 ,當交易雙方中任一方對于在共同間內最終成交價格的預期不在有效間內時,如果另一方不能使其預期發生改變並在有效間的內,那麼交易就會中止;而此時的「報價還價」就是各種信息交換方式中的一種。
  2. Meanwhile, fundamental principles about electroless tin plating by reducing agent and disproportionation reaction were explained. function of every component in the bath was explained that complexing agent can effectively change the potential of copper and tin, and accelerate the beginning of replacement reaction favorably ; reducing agent can increase the rate of chemical reaction and has the effect of promoting reaction dynamics too ; antioxidant can effectively prevent sn2 + in the bath from being oxidated ; additive agent a can improve the stability of the bath ; additive agent b has such effects as refining and brightening for the tin deposits, and it enlarges the range of brightening section ; additive agent c used as leveling agent can not only make the depostis level off, but also improve the dispersive ability of the bath ; surface - active agent can solve bubble problem which gathered on the surface of the deposits, and improve the surface quality of the deposits and the bath stability

    闡述了鍍液中各組分的作用:絡合劑能有效地改變銅、錫的電位,促使初期的置換反應順利進行;還原劑能加快化學反應速度,對反應動力學有積極的促進作用;抗氧化劑能有效地防止鍍液中sn ~ ( 2 + )的氧化;添加劑a能提高鍍液的性,添加劑b對鍍層能有細化和光亮作用,擴大了鍍層光亮;添加劑c作為平滑劑,不僅能增強鍍層表面的平整性,而且能提高鍍液的分散能力;表面活性劑較好地解決了化學鍍過程中汽泡在鍍件表面聚集的問題,提高了鍍層的表面質量和鍍液的性。
  3. The single phase electric motor, which is suitable for wide range of voltage, permits the efficiently cutting of slender fur strips, thicker skins and skins wide in width. the using conditions can be madebetter when the machine is used in the area of unstable voltage

    :配用單相大功率電機,對于細毛條較厚皮板和大幅麵皮張都可以有效切割適用電壓寬:對于電壓不,可以改善使用條件
  4. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部性進行了分析計算,確局部不塊體的規模、出露,從而對拱肩槽高邊坡的局部性有了系統全面的認識和了解。
  5. In the central regions, because of its special geographical advantages, and its abundant resources, convenient transportation, good economic foundation, it ’ s necessary and possible to stimulate its quick spring. but its spring must be through suitable methods, which is to establish the regional economy armed with the ability to develop continuously and the self - developing mechanism. its spring must have positive influence on the upgraded development in the eastern regions and the exploitation in the western regions

    實施西部地大開發戰略是振興中華的宏偉戰略任務,它對實現共同富裕、加強民族團結、保持社會和邊疆安全有重大意義,它是擴大國內有效需求,保持我國經濟持續快速健康發展的重大戰略措施,是實現我國現代化建設第三步戰略目標和全面建設小康社會的必然要求,而且也是適應世界結構調整,提高國際競爭力和拓展國際市場的迫切需。
  6. Based on pollen record and excavated materials in chuodun site and abundant documents in taihu region, three conclusions are obtained as follows : 1. excavated materials of seven plots in chuodun site show that four cultures from the majiabang culture to the maqiao culture all existed and cultural layers werecontinuous and large in it, which suggested the environment should be stable and feasible to live in for human beings

    根據綽墩遺址孢粉記錄與考古發掘,結合太湖地豐富的研究成果,得出以下結論: 1 、綽墩遺址七個探方的發掘材料顯示,新石器時期自馬家浜直到馬橋四個文化期在該遺址中都有分佈,文化層較連續且分佈較大,表明該地自然環境相對,適宜古代先民生存。
  7. The results show that distinct " bench " distribution rule takes on for the subsidence and distortion of bench - shape slope surface ; the movement range of bench - shape slope surface is smaller but its distortion is larger than those of flat surface and concentrated distortion occurs at every bench plan ; the surface horizontal distortion of bench - shape slope is still pressed in gob centre and tensioned in both sides of gob ; space - time effect should be taken into account for the stability of bench - shape slope influenced by underground mining

    結果表明:露天煤礦臺階狀邊坡體的采動沉陷規律表現出很明顯的「臺階」分佈特點;臺階狀邊坡地表的移動比平地地表要小,但變形卻更劇烈,且在各臺階平面處形成變形集中;臺階狀邊坡地表的水平變形仍然呈現出采空中間受壓,兩端受拉的特點;臺階狀邊坡在地下開采擾動下的性應考慮采空的時空效應。
  8. Through the regional background analysis in which western structures developed, it suggested that there did not exist a united and steady block to the west of ordos basin. alashan block neighboring on the north of the western margin was largely influenced by the action of qilian and tianshan - xingmeng folded belt which is respectively to the south and north of alashan block, was narrow in the steady block and was limited by the longshou mountain - zhongwei strike fracture in the south area

    通過對鄂爾多斯盆地西緣構造發育的域構造背景分析,認為在鄂爾多斯盆地之西,一直沒有一個統一的地塊相鄰,與盆地西緣北部相鄰的阿拉善地塊,受南北相鄰的祁連褶皺帶和天山興蒙褶皺帶活動的影響,較地塊的比較狹窄,其南又有龍首山-中衛走滑斷裂構造帶存在。
  9. Pm increases whereas pm decreases with the rise of temperature, which narrows the allowed pressure range for the safe and stable levitation of the processed drops at higher temperatures

    Pm和pm隨溫度的升高分別增大和減小,從而縮小了在高溫安全地懸浮液態樣品的聲壓
  10. ( 5 ) conclusion was obtained by the analyzing and studying the mechanics environment of the rock mass and the landslide on right bank : according to the analysis, the present direction of the maximal principle stress was consistent with the present tectonic stress field, the value of the principle stress increased or reduced in special place, and there was tensile stress region at the 2000m or above it on the left bank, the accumulate and adjustment was very limited in 200 years, the calculated result of the landslide indicated that the landslide on the right bank was stable under the various conditions

    ( 5 )壩址河谷巖體力學環境及右岸古滑坡體的問題分析得出:河谷巖體應力場的分析顯示,河谷巖體中主應力的方向基本上與現今域構造應力場的方向一致,在一些特殊地帶巖體的主應力值有所降低或增高,特別是在左岸的2000m高程附近及以上,存在有明顯張應力。在未來200年流變計算時步內,河谷巖體應力的積累與調整較為有限。同時對滑坡體各種工況條件下的性計算結果表明,右岸古滑坡體在各種工況條件下是處于狀態的。
  11. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失破壞。
  12. Thus it makes various weathers at definite region. by analysis physical diagnose quantities, we can easily find that the vertical movement, the vapor transfer, the stability at t - logp chart, all related with the precipitation when rainstorm occurs. they gave plus effects to the rainstorm

    通過對物理量的分析可以看出,降水發生時的垂直運動場、水汽通量、 t - logp的度參數等物理量值,非常有利於暴雨的產生、發展和維持,也就造成了這次遼西地的暴雨過程。
  13. Under this condition, the preventive measure was increasing the porosity of coal mass and deceasing the circulating channels of gas and air

    提出了增加卸載,促使煤體裂紋擴展,降低單位煤體儲能從而控制沖擊礦壓發生的原理。
  14. Based on field geological conditions, this paper analyzes the influence law of the bulk factor of filling body on the overlaying strata movement, the stability of key strata and its influence on the overlaying strata movement under the condition of complete fill in goaf, and puts forward the allowable bulk factor of filling body of sustaining strata movement in the rational range

    本文結合現場地質條件,分析了采空全部充填條件下,充填體壓縮率對上覆巖層活動的影響規律,分析了該條件下關鍵層的性及其對上覆巖層活動的影響,提出了保持巖層移動的合理的充填體壓縮率。
  15. In the effected zone of the slope, relaxation zone will be varied if corresponding safety factor is varied

    闡明在坡體開挖影響內,不同的系數對應不同的鬆弛
  16. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空勘察及有關性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一內(共40米)進行了面波測試,對采空的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  17. At last, the paper interprets the geological background of the forming of landslides, and reveals the landform, stratum, lithology and geologic structure based on the etm + image. and also, the paper interprets the location and distribution of the specific disaster bodies based on the quickbird image. through the analysis of the extracted information, the paper considers : the geologic structure of fengjie county is complex, and lithology is crashed ; the terrane in the canyon segment is fairly stable ; the terrane in some segments of the southern bank will be less stable after the water is stored, because the rock is in the same direction and is apt to slip with human project

    最後在etm +圖像上對滑坡發育的地質背景進行解譯,提取了地形、地層巖性、地質構造等信息,在quickbird影像上詳細地圈了滑坡災害體的實體位置及發育,通過對所提取信息進行分析,本文認為,奉節縣地質構造復雜,巖性破碎;峽谷段巖層性較好;南岸部分地段為順向巖層分佈,人類工程活動容易誘發順層滑坡,蓄水后庫岸整體性下降。
  18. Except haiyuan and yanchi counties, which are 83 %, a bit lower than the theoretical probability value of 84. 13 %, the rainfall of other five counties is larger than the theoretical probability value. this indicates that, within certain rainfall range, the annual rainfall is much stable

    從實際的40年降水資料看,可近似估計該降水量( x ? 1s ) mm的出現頻率大於84 . 13 ,表明在一的降水量內,其年降水量又有一性。
  19. A new aerodynamic design system developed by authors for draft fan with enhanced efficiency, suppressed noise, enlarged flux and high load. the new design system features : a twist regulation for vortex control is employed in designing to lessen the secondary flow loss in the blade tip and hub ; the feasibility and high efficiency of this procedure has been verified by the tests of the prototype fan ; a new computer - aided 3d blading is used to optimize the blade ; numerical inverse checking is adopted to enhance accuracy in designing and cut down the period of the designing and production. this design system can make the optimized blade with " forward inclination ", " inclining sweep ", " bending sweep ", to minimize the various secondary flow losses, to expand the steady working range of the fan, and to suppress the aerodynamic noise source

    本文通過對一種新型高性能礦用局部通風機的設計、製造及試驗全過程的綜述,展現了新的先進設計體系在民用通風機上的成功運用,其研製特點是: ( 1 )在葉片氣動設計中為了降低葉根及葉尖二次流損失,採用可控渦扭向規律設計,樣機實測的高性能驗證了這種方法的可行性和高效性; ( 2 )在設計方法中採用較精確的數值反驗算,獲取最優設計方案,大大提高設計的準確性和成功率,並縮短了設計試制周期; ( 3 )在設計過程中發展了計算機輔助三維葉片造型新方法,可以根據設計需要簡便快捷地對葉片進行「前傾」 、 「傾掠」或「彎掠」造型,這些造型對減小各種二次流損失、擴大工況和控制葉輪機氣動噪聲源起到了非常好的作用。
  20. The result shows : the stress state of rock - bolt can be improved by grouting surrounding rock ; combined whole section bolting - shotcreting - grouting support can improve the stress distribution, and can decrease the size of plastic zone in surrounding rock, resulting in a loop bearing structure near by the periphery of roadway and the long - term stabilization of the surrounding rock

    結果表明:注漿能夠改善錨桿受力狀況;全斷面注漿與錨噴聯合支護能夠改善巖應力分佈狀況,縮小巖塑性,在巷道周邊形成圓形承載拱,從而保證巖的長期
分享友人