穩定站臺 的英文怎麼說

中文拼音 [wěndìngzhàntái]
穩定站臺 英文
stable platform
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. In this dissertation, we studied the tcra1101plus total station position system, which introduced the principle and characters of the instrument ' s closed loop tracking system. also we explained the cause of prism ' s position error and brought forward mathematic model to correct, moreover, the good results has been drawn form the expenriments. the kinetic survey system have been realized, which the sampling rate attain more than 5hz and the position precision can be less than 2mm on condition that targeted - point moving slowly at the velocity below 2cm / s. having finished the survey system to examine whether the fine - tuning stewart platform in good status, we have finished mensurating the position reference of the fine - tuning stewart platform and the offset of the prism

    在此基礎上研製了多儀器在線控制高頻采樣動態跟蹤測量系統,采樣率大於5hz ,在跟蹤小於2cm / s低速運動目標時,測量精度好於2mm ;完成對饋源二次精調系統的檢測,包括對二次精調平位置基準的標和觀測棱鏡偏心差的測;設計不同動態測量實驗,對全儀動態跟蹤的誤差來源和特點進行了分析;從實驗角度,對全儀的測量時滯及其性進行了測試分析,給出了量的結果;比較了全儀和計算機的內部時間系統,發現兩者存在較大差異。
  2. The observatory has been using solar energy to operate automatic weather stations in remote areas since the 1980s and has implemented wind energy as a supplement in the past few years. this will ensure a stable supply of electricity to the station during periods of cloudy weather with little sunshine

    天文自上世紀八十年代已利用太陽能為偏遠地區的自動氣象提供能源,並於數年前開始逐漸加入風能作輔助,以確保自動氣象的電源,在日照不足的日子仍可正常運作。
  3. Normally water resources is affected by human activities and climatic change, but it is affected mainly by climatic change in runoff forming regions located in the high and middle mountainous area in the northwestern china. river runoff in the hexi inland arid region all originates from the qilian mt. area and the change of mountainous runoff resulted from global weather warming up and will bring an important effect to the development of society and economy in the hexi region. so the response on mountainous runoff and its changing trends are analyzed on the basis of the measured data of precipitation, air temperature, and discharges observed from some weather and hydrologic stations in the studied area. the results show that seasonal variation of mountainous runoff in the hexi inland region is mainly affected by the river ' s geographical location and supply source, and the yearly change by precipitation and that in the west of the region by air temperature besides precipitation. there are some obviously regional differences in the influences of climatic change on surface runoff in the hexi inland arid region, that is, rivers runoff in the west of the hexi area have been increasing and rivers in the east part have been decreasing, and the rivers runoff in the central part presented slowly increase trend, such as the heihe river, but it is not quite obvious

    一般情況下,水資源的變化主要受氣候變化和人類活動的影響,但在位於我國西北內陸乾旱地區的中高山地帶,徑流的形成主要受前者的影響.甘肅省的河西內陸乾旱區是該省重要的工農業生產和經濟開發區,這里各項社會和經濟活動與出山徑流的變化都有著十分密切的關系.因此,筆者根據有關水文氣象的降水、氣溫和徑流觀測資料,分析了以黑河、昌馬河、西營河等主要河流為代表的河西內陸區出山徑流的變化特徵與規律.結果表明,河西內陸區出山口徑流的季節變化主要受地理位置和河流補給來源的影響,而年際變幅則受山區降水量年際變化及變幅的影響十分明顯.目前,梨園河以西河流水量處于上升階段,梨園河以東的河流則處于下降的階段;以黑河幹流鶯落峽水文年徑流為代表的走廊中部地區的出山口徑流正處於1990年開始的枯水段的上升段.但總體而言,河西內陸乾旱區出山口徑流的變化相對比較.預計今後若干年內,河西內陸乾旱區東段河流出山口徑流的變化以偏枯為主,中段、西段河流出山口徑流的變化以平水或平水偏豐為主
  4. In order to be better used in faults simulation and analysis, the accurate of model needs to be improved. the research of marine diesel engine generator system simulation includes modeling and simulation results " analysis. based on mechanism of the marine diesel engine power system, and according to the marine power system of yunhe vessel, this dissertation sets up a simulation model of yunhe generator system

    由於船舶電力系統模型是輪機模擬器中電部分的核心,為了使建立的模型精度更高,更具有系統故障模擬和分析的準確性,本文從船舶柴油發電機系統的機理出發,應用電力系統性理論,結合雲河輪電力系統,在matlab軟體平上,建立了雲河輪柴油發電機系統的模型,並對該系統進行了模擬運行和分析。
  5. Mr. k. k. lau of the marine department recalled the challenge they faced when designing the buoy, " our buoys are mainly used for mounting relatively small and light navigation signs. the observatory s buoy posed a problem for us in that the weight of the equipment might make the buoy very unstable.

    海事處劉家駒先生對設計浮漂氣象時所面對的困難,印象深刻: 「我們沿用的浮標一直只能裝載較小和較輕的航海標記,由於天文的儀器較重,會使浮標不,這令我們頗費思量。 」
  6. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力主管的兩高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際電的參數,對甩負荷過渡過程進行了模擬計算,分析水力干擾對電安全、運行所造成的影響,並提出了一系列減輕水力干擾的措施。
  7. Now imagine yourself at the base of a flight of steps you do know, and estimate a ) how many steps there are, and b ) how long it takes you to climb them ( at that steady pace )

    現在,想象下你正在你所知的樓梯最下端,估計1 .有多少階, 2 .要花多久(步速的基礎下) 。
  8. In this paper, brief summary and contrast for the analytical methods of arch dam were conducted, the visualization and parameterization of fem, and its implementation were investigated, and the system based on ansys, for the simulation fem analysis of arch dam was developed. and 3 - d nonlinear fem simulation analysis was then carried out for niutoushan arch dam, which is located in shouning county, fujian province of china

    本文對拱壩的分析方法做了總結對比,研究了有限元分析中的可視化、參數化方法及它們實施技術,開發了基於ansys平的拱壩有限元模擬分析系統,並結合實際工程對福建省壽寧縣境內牛頭山水電雙曲拱壩進行了三維非線性有限元整體模擬分析。
  9. And it also can not give the exact appearance place. aiming at this question, basing on studying the underground cavity in laxiwa hydroelectric station, through establishing entity model, combining model, slicing model, and vector analysis, article introduce a method of analyzing the stability of block and get the certain search. all the graph result is showed in autocad, which is a graph software

    針對此問題,本文以拉西瓦水電地下洞室為研究場所,以autocad圖形軟體為平,建立地下洞室和結構面的實體模型,通過對實體模型的組合、剖切獲取結構面的洞頂及洞壁展示圖,再以結構面展示圖為基礎,應用矢量運算對塊體進行性分析,並在autocad中顯示結構面展示圖和塊體展示圖。
分享友人