立交線路 的英文怎麼說

中文拼音 [jiāoxiàn]
立交線路 英文
crossover track
  • : 動1 (站) stand; remain in an erect position 2 (使豎立; 使物件的上端向上) erect; stand; set up...
  • : Ⅰ動詞1 (把事物轉移給有關方面) hand over; give up; deliver 2 (到某一時辰或季節) reach (a cert...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company

    對貨運車輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運車輛調度優化理論與方法進行系統研究是物流集約化發展、建現代調度指揮系統、發展智能通運輸系統和開展電子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽車運輸領域,在水運、航空、通訊、電力、工業管理、計算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安排、輪船公司運送貨物經過港口與貨物安排的優化設計、通車安排、生產系統中的計劃與控制等多種組合優化問題。
  2. Since its foundation, this institute has completed 3800 or more projects of exploration and design of which projects of priority are fengpu, lupu bridges, i, ii, iii stages of comprehensive sewage treatment, inner, middle, outer ring roadways, yan an dong lu viaduct ( east and middle sections ), main entrance roadway and graded crossing in pudong international airport, first and second stages of humin viaduct, expressways ( hujia, huqingping, hulu, jialiu, xinfengjin ) and chongming cross river projects, r3 and m7 light rail projects both situated in city proper or suburban area

    自創建以來,完成了各類工程勘察設計項目3800餘項,其中已完成或正在進行的項目有:上海市奉浦大橋、盧浦大橋、污水治理一二三期工程、 (內、中、外)環、延安高架道(東、中、西段) 、浦東國際機場航站區主進場道及航站區、滬閔高架道一、二期、 (滬嘉、滬青平、滬蘆、嘉瀏、莘奉金等)高速公、崇明越江通道、軌道通r3、 m7等工程。
  3. The design built the wireless lan application platform with the modes of switching in the wireless lan and bar - code scan technology of wireless hand terminal ; made ap switch in warehouse exchanger by lineate method to get in lineate lan of the corporation, and joined the wireless lan into lineate lan by the wireless hand terminal communication to ap with protocols

    整個硬體環境設計採用了無接入方式和無手持終端、條碼掃描技術建應用平臺, ap以有方式接入體倉庫換機與企業有接通,無手持終端通過協議與ap通信實現無與有連通。
  4. This model helps to make a non - linear finite element program which is tested and verified by the example in umt

    在此基礎上,建了城市軌道通橋梁無縫縱向力的空間一體化力學模型,編制了非性有限元模型,通過實例進行了模型驗證。
  5. The paper tend to study the bus rapid traffic ( brt ) system which is suit in the chinese big cities in today or the beginning decays of the 21 century. the system is mainly make up of the ; key bus rapid rout network. first, the thesis analysis the urban structure infect the urban " traffic demand in view of the urban planning. then due to urban public traffic need the paper study brt system and it ' s practice and development in foreign cities, for example, the successful experience in curitiba

    論文首先從城市規劃的角度入手,分析城市布局發展對城市客運需求的影響;然後根據城市客運通的需要介紹和討論了快速公的構成系統及其在國外庫里蒂巴等城市的發展經驗,並進行了總結;接著,對在我國大城市中構築快速公進行探討研究,這也是論文的中心部分,在快速公結構規劃方法上進行了一定的創新,提出了「分級規劃,分區布」的快速公網規劃方法,並對網結構中的換乘設施規劃設計進行研究,在整個快速公規劃的基礎上建了一套公網規劃的評價指標體系。
  6. This thesis elucidates and analyses the key techniques and rules of aolr in detail, and introduces its simulation modeling of the integrated system infrastructure and each function modules. through systematic simulation of aolr in the performance of packet delivery rate, average end - to - end delay, average route set - up delay, routing overhead, and etc, the key techniques and algorithms are testified and can provide reference for practical system design and application

    通過對基於蟻群優化的負載均衡由協議系統的模擬,從數據分組成功遞率、平均端到端時延、平均由建時延、由開銷等性能的模擬數據和曲上,分別驗證了該系統中的幾項關鍵技術和演算法。
  7. By using visual basic 5. 0 language, activex automation interface, the oop technology and developing autocad 2000, the system not only can achieve the horizontal design and the vertical design of three - legs and four - legs intersection at the tangent section and the curved section, but also can calculate earthwork based on digital terrain model

    本系統以vb5 . 0為開發工具,採用面向對象的編程方法,利用activex自動化技術,通過對autocad2000的二次開發,可以進行處于直段、曲段的三、四叉口的平面設計和面設計與繪圖,完成基於數字地面模型的工程數量計算。
  8. When you connect to your isp ( internet service provider ) through a modem, you establish a switched connection to the isp, but it ' s actually carrying packets through a protocol called ppp or ( rarely now ) slip ( serial line internet protocol )

    當你通過數據機連接到網服務商時,你就和它建一個換連接,但實際上是通過稱為點到點的協議或串列介面協議(現在很少使用)傳送信息包的。
  9. A highway intersection designed to permit traffic to move freely from one road to another without crossing another line of traffic

    互通式叉一種設計的使車輛不用穿過另一條的車輛就可以從一條到另一條的
  10. This article establishes a suitable mechanical model for urban mass transit continuous welded rails longitudinal force research, which is widely based on the real situation and draws up the nonlinear finite element method program, and is verified by practical examples

    摘要?了對城市軌道通無縫縱向力進行研究,根據實際結構建了力學模型,編制了非性有限元程序,並通過實例進行驗證。
  11. Construction technigue of jacked - in bridge on fuskui road grade separated bridge pass tnrough lanchn - yantan railway

    藍煙富水橋頂進施工技術
  12. The roads in the city are all separated by trees, and the circular and triangular road dividers at traffic junctions are covered with flowers and plants. flowers bloom on the rooftops of bus stops, and amazingly, even pedestrian bridges and lamp posts are swathed in vines and speckled with flowers

    市區干車行道都以樹木隔界口的環行和三角地也鋪種花草候車頂棚鮮花吐艷更令人驚嘆的是,就連那行人天橋和柱,也爬滿藤蔓,綴滿花朵。
  13. Initial recovery voltage and peak recovery voltage across the circuit - breaker have an essential affect on re - strike. for assessing performance of circuit - breaker, the higher inductance and lower inductance must be considered at the same time when testing according to theoretic analysis, the directly test circuit on switching the no - load overhead by high - voltage circuit breakers of rated voltage 252kv and below, in compliance with the correlative standard jb5871 and the test devices, and the test circuit parameters have been calculated and the many testes have been carried out

    在理論分析的基礎上,考慮實驗室現有設備的情況依據標準jb5871的規定,選用合適的試驗設備,對試驗的參數進行計算,在實驗室建了252kv及以下電壓等級斷器開合充電電流直接試驗,利用該進行了數臺產品的試驗,分析了試驗結果,並根據試驗結果和理論基礎討論了gb t1984 - 200 《流高壓斷器》 (報批稿)關于開合充電電流試驗的有關規定。
  14. Application of high - effective intelligent route planning method, solve the complex path route plan in the multi - level crossing bridge, the specific line, has endured the good line, the high structure road, the auxiliary road and so on

    採用高效的智能規劃演算法,解決了橋、單行、禁行、高架、輔等復雜道規劃問題。
  15. Customers from huizhou, shenzhen and dongguan should pass humen bridge and the nansha dadao of panyu district to shiqiao, then drive on the guangzhou ? zhuhai line of 105 national road until you reach the traffic post of midea group in beijiao ( the crossing of sanhong bridge ), then turn right to sanle lu and drive along to lecong crossroads, turn left and drive along for 200m and you will reach sunlink north section furniture city of lecong ; or you can drive in the direction to foshan through guangzhou - shenzhen highway until you reach shunde lunjiao crossroads ( longzhou lu ) where you can drive to foshan and longjiang

    惠州、深圳、東莞方向客人,經虎門大橋番禺南沙大道到市橋走105國道廣珠到北?美的集團通崗(即三洪橋大橋口)右轉?三樂直行到樂從橋左轉200米即到樂從順聯北區家私城,或走廣深高速往佛山方向,在順德倫教橋(龍洲) ,可往佛山、龍江方向。
  16. Guangzhou international airport : nansha is approximately 100km 90 minutes ride from the guangzhou international airport. guangzhou international airport airport expressway north er huan express tai he li jiao hua nan express panyu yin bin road shawan bridge nansha da dao humen bridge before crossing nansha exit nansha grand hotel nansha is approximately 95 km 60 minutes ride from the shenzhen airport. shenzhen airport guang shen express humen bridge after crossing nansha exit nansha grand hotel. from major neighouring cities : the journey from major neighouring cities like dongguan, guangzhou is approximately 0. 5 hour to 1. 5 hours long

    機場至酒店:廣州新白雲國際機場至南沙大酒店全程約100公里,車程約90分鐘廣州新白雲國際機場機場高速公北二環高速公太和華南快速干番禺迎賓沙灣大橋南沙大道虎門大橋南沙出口不過虎門大橋南沙大酒店深圳機場至南沙酒店全里程約95公里,車程約60分鐘。深圳機場廣深高速虎門大橋南沙出口過虎門大橋南沙大酒店。
  17. Chongqing developed the cng auto 4 years ago, is the city that starts the cng project earliest and with the best development foundation, but the development speed is very slow, up until now there are only less than 8000 cng vehicles and 35 cng stations in the whole city

    沒有公專用車道的道上,公車的行駛時間受通狀況的影響太大,整個參數體系都無法準確建。據了解,蘇州市最初試行「千里眼」的公為1101102103
  18. Being a local approximating neural network, cerebellar mode arculation controller ( cmac ) has the distinctive ability of disposing nonlinear mapping and building nonlinear relationship. the paper proposes a cmac - based control scheme in which learning and controlling are alternately processed. the method is applied to the ac servo control system and obtain high quality output

    作為局部逼近神經網之一的小腦模型關節控制器( cmac )對處理非性映射、建性關系具有獨特的優點,本文將cmac應用於流伺服電動機系統的控制,採用邊學習邊控制的工作機制,取得了良好的實驗結果。
  19. A brief introduction of cassia plaza hotel in kunming city cassia plaza hotel is a three - star hotel open to foreign tourists, built with the fund offered by yuxi red tower aggregation. located at the crossroad of dianchi road and xiyuan road, the hotel enjoys a golden position, for its traffic condition is perfect it can be reached within one minute from fuhai overpass at the second ring - road, and it takes just 10 minutes to get to the airport and train station, and what s more, one can get to dianchi national tourism holiday zone and yunnan ethnic village within 20 minutes by traveling southwest along dianchi road ; besides, one can reach the city s center by taking more than 10 different number of buses at their bus stops existing on xiyuan road, southern ring - road and western ring - road just near the hotel itself

    昆明桂花大廈是玉溪紅塔集團投資興建的三星級旅遊涉外酒店,位於昆明市滇池與西園叉口的黃金地段,出行旅遊的通條件十分便利:從二環的福海橋下來1分鐘即可到達,酒店距飛機場和火車站也僅需十多分鐘車程,沿著滇池往西南方向,十多分鐘就可到達著名的滇池國家旅遊度假區和雲南民族村從酒店向東北面,環城西環城南西園有10多便捷的公讓您只需十分鐘就可進入昆明市中心的繁華商業區。
  20. Based on transcad, the following research contents are involved in the urban transit planning application annlysis : 1. primary characters of the urban transit network are analyzed, the transit network database based on transcad are discussed, the method and process of establishing database are provided, the methods of transcad display and data edition are introduced, a transit route system is established by using route system toolbox, a basic transit od matrix aiming at the od matrix con - calculated technique is set up

    本文針對transcad軟體在城市公規劃中的應用作了如下研究: 1 .分析公的主要特徵,探討一種適用於transcad軟體分析的公數據結構,給出建庫的方法與流程,對transcad顯示和編輯數據的方法進行說明,利用routesystem工具箱創建了公系統,並針對od矩陣反推技術的分析結合課題建基礎od矩陣。
分享友人