立樁標出 的英文怎麼說

中文拼音 [zhuāngbiāochū]
立樁標出 英文
stake out
  • : 動1 (站) stand; remain in an erect position 2 (使豎立; 使物件的上端向上) erect; stand; set up...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • 標出 : section out; scale out標出航行標志 airmark
  1. The energy equilibrium analysis model is established in allusion to the unreasonable operating temperature, imperfect oil production process and lower energy utilizing rate in zhuangxi oil production station, the relative evaluation index and calculation method are given as well

    摘要針對西聯合站生產環節中的某些運行溫度不合理、生產工藝不完善、能量利用率較低等現狀,建了能量平衡分析模型,給了相應的評價指和計算方法。
  2. The failure models of the pile foundation of the girder flume in the li river are analyzed, the corresponding functional functions are established, and the reliability index of a single concrete pile is calculated

    摘要分析了澧河段梁式渡槽基礎的破壞模式,建了相應的功能函數,計算得混凝土單的可靠指
  3. The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method

    本文提的優化設計方法,以單位長度的總造價為目函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為約束條件,以截面高度,抗彎縱筋面積,抗剪箍筋數量等為設計變量,來建優化模型,並用0 . 618法進行求解。
  4. ( 3 ) optimization design principle of long - short - pile composite foundation is put forward, base on which replacement ratio and pile length is taken as design variable, bearing capacity, settlement, stratum strength and other demands acted as constraint function, pile cost taken as objective function, so the optimization design model of long - short - pile composite foundation is built

    ( 3 )提了長短復合地基優化設計原理,在此基礎上將置換率和長作為設計變量,承載力、沉降、下臥層強度等要求作為約束函數,總制費用作為目函數,建長短復合地基優化設計數學模型。
分享友人