立錨 的英文怎麼說
中文拼音 [lìmáo]
立錨
英文
uand down-
The center typically consists of several freestanding ( unconnected ) anchors and only a minimum amount of small specialty tenants
典型能量中心包括幾個獨立的(不相連的)錨店和僅有極少量的小的專賣店承租人。Webbing sling, round sling, lifting sling, nylon rope, rope ladder, cargo net lifting sling belt group have a long history for more than 46 years of specializing in different types of slings, mainly products including polyester webbing sling, polyester round sling, polyester cargo lashing, super sing, flat sling, flat webbing sling, flat web sling, polester web sling, tree strap, webbing strap, doublebraid, recovery strap, recovery tow strap, lashing systems, polyester sling, polyester belt sling, hollow braid, synthetic webbing, endless sling, nylon sling, synthetic web sling, synthetic sling, webbing sling, round sling, cargo lashing, ratchet tie down, ratchet lashing, ratchet strap, ratchet tie down strap, nylon webbing, nylon strap, tubular round ropes, braided rope, diamond braid rope, starter rope, safety net, safety belt, cargo net, safety rope, climbing rope, rope ladder, building net, nylon net, polyester webbing sling, polyester round sling, tie down, cargo restraint, webbing strap, duplex eye - eye webbing sling, eye - eye webbing sling endless webbing sling, widely and heavy duty webbing sling, multi - sling, ratchet lashing, tow strap, web belt sling, flat webbing sling, nylon rope ladder, industrial safety nets, nylon cargo net, dock net, synthetic webbing sling, lifting clamp, braided rope, 3 strand rope, 12 strand rope, 8 strand rope, cargo net, shipmast net, tube net, solid braided rope, braided rope net, sports net, pe net, safety net, scaffold net, synthetic slings, wide lift sling, round webbing sling, flat webbing sling with eyes, flat webbing endless sling, wire rope sling, multi - set sling, pipe lifting sling, pipeline sling, lowering belt, heavy duty anti cutting sleeves, fiberglass rope, fiberglass wick, braided fiberglass rope, fiberglass rope lamp, fiberglass oil lamp wick, fiberglass strap, solid braided fiberglass rope - round, fiberglass tapes, ceramic fiber rope, fiberglass braided rope, pipe handling sling, lowering in belts, stone handling sling, flat lifting sling pipe lifting belt synthetic fiber round sling synthetic lifting sling, synthetic fiber sling, nylon webbing strap, pipe sling, bandsling, pipe sling with reinforced eyes, lifting sling with reinforced eyes, pipeline pipe industrial farm lifting sling, endless sling, eye eye sling, oil field sling, truck strap, winch strap, cargo tie down, track ratchet strap, tow strap winch flat rope tow line, heavy duty webbing towing lifting sling, cargo sling, pp cargo sling, polyester cargo sling, flat pack sling, ceramic fiber rope twisted rope braided round rope braided square rope
2圓形尼吊裝繩系列:無接頭尼吊裝繩兩頭扣尼吊裝繩多叉尼吊裝繩船用錨繩纜繩引紙繩變壓器吊裝繩各種規格編織吊繩,尼繩,啟動拉繩,啟動繩,引擎拉繩,引擎繩,起動拉繩,起動繩,動力繩,安全清洗繩,安全繩,保險繩,耐火救生繩,維綸繩,丙綸繩,滌綸繩,錦綸繩,尼吊繩,尼吊裝繩,錨繩,靠岸繩,旗繩,晾衣繩,復合吊繩,掛衣繩,宿營繩,保護繩,防火繩,尼網,休閑吊網,跳繩,蠶絲繩,全棉繩,塑膠繩,布繩,拔河繩,攀巖繩,遊艇繩,綿綸絞制繩,織制繩,登山繩,拔河繩,立桿繩,水平繩,工藝繩,吊繩,船用纜繩,絞制纜繩,綿綸絕緣繩,三股繩,八股繩,軍用繩,線路牽引繩,吊棕繩,割刀繩,引紙繩,包裝袋繩,禮品盒繩,酒盒繩,食品盒繩,手提袋用繩,禮品盒用繩,工藝品用繩,服裝用繩,聚乙烯繩,聚丙烯繩,混紡繩,纖維綸繩,復絲繩,撕裂膜繩,編織繩,加鉛繩,功能繩,軟梯繩,尼軟梯,軟梯,尼繩梯,尼梯繩,安全網,棉繩,彈力橡筋繩,嵌邊繩,封蠟繩等,啟動繩啟動拉繩引擎繩引擎拉繩起動拉繩,雙編織繩,金剛打編織繩,股編織繩,股編織繩,多股編織繩。Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated
把建立的水下拖索數學模型和錨索數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?錨系統,採用matlab語言編程進行了數值計算,同時分別計算和分析了反潛直升機拖速、距海面高度對拖索形狀和張力的影響以及海流速度、錨索直徑對錨索形狀和張力的影響。6. the sectional cross - sectional discrete yield - sruface model is used to spandrel deep beams, the effect of the shear deformation to shear force on ( he m ~ terial nonlinearity is considered, ( he bond slip in anchorage zones is regarded as the houndaty nonlinearity of a member. except the geometric nonhineaicty. consideration of double nonlinearities about materials an
6 、將分段截面離散的屈服面模型法應用於裙梁,考慮剪力剪切變形對材料非線性的影響,將錨固區鋼筋的粘結滑移看成構件的邊界非線性,不考慮幾何非線件,建立了裙梁考慮村料、邊界雙重非線性的空間滯回曲線分析模型。S. consideration of interaction on the nonlinearity about the material, the geometry, and the boundary of the columns subject to axial force. biaxial hending, and torsion, an analytical model of hysteretic curve of columns is presented, based on the sectional cross - sectional discrete yieldsurface inodel, the bond slip in anchorage zones regarded as the boundary nonlinearity of a memher. and the iterative procedure of displacement of inner nodes on the basis of the hamonization of displacement
5 、根據構件分段截面離散的屈服面模型法,把錨固區粘結滑移看成構件的邊界非線,以及基於位移協調的內結點位移迭代法,建立了能考慮構件壓(拉) 、雙彎、扭的材料、邊界、幾何非線性相互影響的柱空間滯回曲線分析模型。Consideration of the additional axial, two angular deformations generated by the bond slipping in anchorage zones of joints, the assumption is made, that the plane section of either end of a member before bond slipping of reinforcements remains afler bond slipping of reinforcements. additional deformations * contribution to stif ? nesses of plastic sub - elements is formed from the boundary nonlinearity of plastic stabelements. the space bond slip relation can truly compute bond slip in anchorage zones, additional def ? rmatinns, and their contribution to the space nonlinearity of a niember, has used iii space nonlinear analysis of columns and spandrel beams in this dissertation
附加變形對塑性子區域的剛度貢獻,看作是塑性子區域的邊界非線性,建立了構件端部子區域基於構件邊界非線性的鋼筋與砼之間的空間粘結滑移關系,能較真實地求得錨固區的粘結滑移、附加變形以及他們對構件空間非線性性能的貢獻,並運用於柱、裙梁的空間非線性分析之中。The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor
樁錨支擋結構體系是重慶地區經常採用邊坡支護形式之一,長期以來,人們認為樁錨支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過錨桿把力傳遞給穩定地層。The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically
其中初始化繪圖環境模塊主要針對客船總布置圖繪制的特點來完成比例、線型、圖幅和圖框的設置;客船總布置圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室圖形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如錨泊及系泊設備、駕駛室、乘客艙室及行李的放置、脫險措施及乘客定額等規范。According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis
根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。Establishing and strengthening the protection system for roof - bolt coal roadway in view of the safety in production
建立健全煤巷錨桿支護保障體系確保安全生產Be that as it would, we were oblig d to go on shoar somewhere or other for water, for we had not a pint left in the boat ; when or where to get to it was the point : xury said, if i would let him go on shoar with one of the jarrs, he would find if there was any water and bring some to me
不, "我說, "佐立,我們可以把錨索連同浮筒一起放出,把船向海里移移,那些野獸游不了太遠的,它們不可能跟上來。 "我話音未落,那巨獸離船不到兩槳來遠了。我立刻走進艙里,拿起槍來,對著那傢伙放了一槍。Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope
三峽永久船閘直立坡鎖口錨桿應力監測分析Lin, c. h., " rational for limits to reinforcement of tied concrete column, " ph. d. dissertation, department of civil engineering, university of texas, austin, texas ( 1984 )
陳永松,鋼筋混凝錨座鋼筋握裹滑?之預測,碩士論文,國立成功大學建築研究所,臺南( 1982 )Lin. c. h. ( 1984 ) : ” rational for limits to reinforcement of tied concrete column, ” phd. dissertation department of civil engineering, university of texas, austin, texas
陳永松( 1982 ) :鋼筋混凝錨座鋼筋握裹滑移之預測,碩士論文,國立成功大學建築研究所,臺南。In order to find out an economical, practical and reliable supporting method, some relevant technical personnel and i, based on successful experiences and project instances, designed the pre - stress anchor board supporting system, which is to exert pressure on the anchors and to independently support slopes. this system has successed and replaced the pile - anchor supporting system used in past
為探索一種經濟、實用、可靠的支護方法,結合一些成功的經驗和工程實例,筆者與有關技術人員一起設計了預應力錨板墻支護技術,在錨桿上施加預應力,主動、獨立支護邊坡,取代了過去了常用的樁?錨支護體系,並實施成功,成為島城近年來深基坑支護主要技術之一。Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering
最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及錨桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge
提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier
本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further
首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。With sovereignty 4, a monument upgrade platform can be anchored and built next to an outpost which already has a pedestal upgrade
在主權等級4下,紀念碑升級平臺可以被錨定並建立在已經擁有基座升級平臺的站旁邊。分享友人