站線剖面 的英文怎麼說

中文拼音 [zhànxiànpōumiàn]
站線剖面 英文
station section
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : [動]1. (破開) cut [rip] open 2. (分辨; 分析) analyse; examine; dissect
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. The article is directed by the modern structural geology, seismic stratigraphy and petroleum geology. in the study of works, geology, seismic and logging data are used. with the computer ' s ( workstation ) help, adopted many methods which are the technology of balanced section, calculation of the structural movement rate, the renewal of the erosion thickness, renewal of the ancient thickness, the protraction of the cover history curve and the " pagoda " figure, and based on the previous research achievement, this article studies the characteristic of rupture and fold, the degree of structural movement and the fashion of structural movement and brings forward that ludong area has experienced three big phases of structural evolvement

    以現代構造地質學、地震地層學和石油地質學為指導,全利用各種地質、物探、測井資料,藉助先進的計算機(工作) ,採用多種方法(平衡技術、構造活動速率計算、剝蝕厚度恢復、古厚度恢復、埋藏史曲製作、寶塔圖製作等) ,並結合前人的研究成果,研究了陸東地區斷裂和褶皺的特徵、構造運動的期次以及構造運動的方式,提出了陸東地區經歷了三個大的構造演化階段。
  2. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁和壩體中心縱準穩定溫度場等值圖以及施工期、運行期拱冠梁和壩體中心縱非穩定溫度場等值圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  3. After various indexes including constant elements, trace elements and organic gases in core sediment of site 1146 were analyzed, the changes of their vertical section curves of content with depth were studied and the potential reasons were also discussed in the paper

    通過對1146位巖心沉積物各常量元素、微量元素及各有機氣體的測試分析。研究了各元素及氣體含量的縱隨深度的變化,討論了其可能的原因。
分享友人