竣工試驗 的英文怎麼說
中文拼音 [jùngōngshìyàn]
竣工試驗
英文
completion test-
To investigate the practical stability performance of this bridge, a model test is carried out. the test model actually simulates nan pu bridge based on similarity criterion. the model test reveals that the stability factors is more than 2. 0, so the stability and strength of this bridge have been verified to be met with
該模型試驗首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋的模型設計和製作中,其研究成果對南浦大橋實橋的施工以及竣工后的運行有重要的應用價值,並對今後鋼管混凝土桁式拱橋的試驗研究、設計、施工具有重要的指導意義。In order to study the practical stability performance of chunan nanpu bridge, a total bridge model test was carried through. the design method of " spar to spar " modeling method was firstly introduced in this test. the test results are significant for construction and management of chunan nanpu bridge ; excessively, the test results are significant for design and construction of large span cfst arch bridge also
該模型試驗首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋的模型設計和製作中,其研究成果對南浦大橋實橋的施工以及竣工后的運行有重要的應用價值,並對今後鋼管混凝土桁式拱橋的試驗研究(特別是模型製作) 、設計、施工具有重要的指導意義。Industrial projects refers to the major projects and accessory facilities completed which result in forming production capacity and have been checked and accepted while the living and welfare facilities have been completed and can ensure normal production and formally put into production
工業項目是指設計文件規定形成生產能力的主體工程及其相應配套的輔助設施全部建成,經負荷試運轉,證明具備生產設計規定合格產品的條件,並經過驗收鑒定合格或達到竣工驗收標準,與生產性工程配套的生活福利設施可以滿足近期正常生產的需要,正式移交生產的建設項目。To avoid the pollution of groundwater resource and adjacent environment caused by drainage pipe leakage, current criterion in our country stipulates that there must be a pressurization test before drainage pipes are used
為防止污水管道滲漏而導致污水外滲污染地下水資源和周邊的環境,我國現行的規范規定,無壓管道在竣工交付使用之前必須進行管道的嚴密性試驗。The author designed, made, processed and tested to the plexiglass model and the bridge. then author calculated and analyzed the results, as a result of the computer programs bsas, sap, qjx and nastran. the author researched the force characteristics and structural behavior of large - span prestressed concrete bridges with continuous rigid frame structure, used the advanced theory and technology, materials, arts and crafts to resolve the practical matters in design and construction, to optimize structure, and to provide credible technical data for the design and construction and maintenance of bridges
本文以吉林省九站松花江特大橋為研究對象,通過有機玻璃模型的設計製作及加工和試驗,以及對已竣工通車的實橋荷載試驗,利用計算機程序bsas 、 sap 、 qjx及nastran等程序進行理論計算和綜合對比分析,探討大跨徑預應力砼連續剛構橋的力學特點和使用性能,運用先進的理論、技術、材料、工藝等來解決設計和施工中存在的實際問題,優化結構,並為橋梁的設計、施工及使用維護等提供可靠的技術資料。The data captured in field tests and observations both prove that crossrange prestressing can effectively reduce roadbed settlement, shorten the roadbed compression and stabilization period, and increase the capacity of roadbed
通過試驗路段的試驗以及竣工后一段時間的定期觀測,表明側向施加的預應力能減少路堤總沉降,縮短工后沉降穩定期,提高路堤的承載力。This thesis gets forecasting ground settlement of sk3 + 355 section of shenzhen metro da ~ ke running tunnel after it is completed 6 months, also gets forecasting ground settlement of sk3 + 395 section after it is completed 15 months. finally, the model test data are compared with the site measurement data
本論文通過多個模型試驗的研究,得到了深圳地鐵大~科區間里程sk3 + 355斷面在隧道竣工后6個月內地表固結沉降的預測值,也得到了sk3 + 395斷面三孔三線隧道施工引起的沉降和隧道竣工后15個月內地表固結沉降的預測值。Perform the commissioning functions tests with the completion engineers
和竣工工程師一起完成調試功能試驗。Phase 1 installation qualification, as - built testing, or construction approval. this is testing that proves the environment was correctly installed and that it meets the intended design specifications
第一階段,安裝合格驗證,竣工測試,或建造審核。該項測試用以證明環境已正確實現,符合既定設計要求。分享友人