端橫梁 的英文怎麼說

中文拼音 [duānhéngliáng]
端橫梁 英文
end floor beam
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到段以外附近區域的作用,在其兩面上施加了由平面桿系結構分析所得的面內力,另外,索力和預加力(縱向、向、斜腹板豎向)也施加在相應的位置,分析了箱形主在自重、索力和預應力作用下的空間應力效應。
  2. According to eigenvalue equation ( general formula ) of the energy method of the plane steel frame structure stability, and considering the restriction of the end of the column of the main steel frame and function of deflection curve gained from the differential balance equation general resolution, we get the equation for calculating the length coefficient of the main frame structure stability of the steel arch gate and the resolutions are also given

    根據平面剛架穩定性能量法特徵值方程(通式) ,考慮弧形鋼閘門主框架柱的柱約束的特殊情況,求出撓曲線函數(試解函數)通解,得到弧形鋼閘門主框架柱穩定性計算長度系數方程。其中弧門主框架主式形框架的臨界荷載比較現行規范推薦的有限元法簡單方便、結果精確及物理概念明確等優點。
  3. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大型三維有限元軟體ansys對該起重機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門與起重機副碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機橋架主、副的變形以及其內部的應力分佈情況。
  4. The harmonic analysis method for computing force of end - point of variable cross - section beam when it does transverse vibration

    計算變截面向振動時桿力的調和分析法
  5. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系預應力束抵抗拱推力,吊桿及縱橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱推力,又改善了連續橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  6. Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.

    肉眼觀察表明:在節點處的系樑上翼緣之間產生一種沿橋縱向的水平位移。
  7. On transverse vibrations of an axially moving beam on fixed supports

    關于兩固定軸向運動向振動
  8. Transverse vibration of an axially moving beam with fixed support by wave propagation

    波傳播法分析兩固支軸向運動向振動
  9. Aerospace series - pipe coupling 8 30 ' in titanium alloy - ferrule, welded, with dynamic beam seal end

    航空航天系列.鈦合金8 30 '管連接件.帶動力密封頭的焊接環箍
  10. Aerospace series - pipe coupling 8 30 ' in titanium alloy - ferrules with dynamic beam seal end, welded and reduced at pipe end

    航空航天系列.鈦合金管連接件8 30 ' .在管焊接和變徑的帶動力密封頭的環箍
  11. A farm implement consisting of a heavy blade at the end of a beam, usually hitched to a draft team or motor vehicle and used for breaking up soil and cutting furrows in preparation for sowing

    犁一種農具,由在一根部的厚重的刃構成,通常系在一組牽引它的牲畜或機動車上,用來破碎土塊並耕出槽溝從而為播種做好準備
  12. Vibrations of an axially transporting beam are investigated

    摘要研究帶有扭轉彈簧兩鉸支軸向運動向振動。
  13. Vibrations of an axially transporting beam with torsional springs and simply supported

    帶有扭轉彈簧兩鉸支軸向運動向振動分析
  14. Vibration and stability are investigated for an axially moving beam constrained by a pinned end and a fixed end

    摘要研究一簡支一固支軸向運動向振動和穩定性。
  15. After comparing between the finite - element analysis and experimental results, the author verified the fem. then according to the chinese code, the nonlinear finite model of the beam - to - column is established which are made of different size components. the responses of beam - to - column web moment connections which are made of different size components are compared and analyzed from three facets, and the conclusions about the joints behavior are drawn : thicken the connection plate, lengthen the connection plate or use a back - up stiffer can improve the connection behavior, consist of improving the behavior of load - supported and reducing the stress convergence in the flange moment plates

    本文根據我國規范的有關規定,自行建立了12個不同構件尺寸的樑柱腹板連接的三維有限元模型,對不同構件尺寸的樑柱腹板剛性連接節點在單向荷載作用下的反應進行了研究,從結構的mises應力等值線示意圖、加載處的荷載? ?位移曲線、翼緣連接板兩的mises等效應力以及翼緣連接板與柱相連接的三邊的mises應力等值線示意圖四方面進行了比較與分析,從而得出了不同構件尺寸的樑柱腹板剛性連接的在受力行為上的結論:增加翼緣連接板的厚度、增加翼緣連接板的長度以及採用柱的向加勁肋均可以改善節點的受力性能:提高節點的承載能力;減小翼緣連接板內部與柱翼緣邊的的應力不均勻現象,從而避免試件過早地發生破壞。
  16. General solutions of smart materials and structures part three intelligent cantilever beam subjected to a transverse concentrated force

    懸臂向集中力
  17. Han ' s header in the 75th was batted over the goal by bindon, followed by a shot a minute later from ma xiaoxu that hit the crossbar

    第75分鐘,韓頭球攻門,被賓頓托出。短短一分鐘后,馬曉旭射門擊中
  18. An upright post with a transverse piece near the top, on which condemned persons were executed in ancient times

    十字架一根在接近頂地方的立柱,在古代用來處死被判有罪的人
  19. A beam across an opening, such as a hearth, into which the ends of joists can be fitted

    ,承接穿過孔洞,如壁爐地面,到插能被固定的
  20. Aerospace series - pipe coupling 8 30 ' - dynamic beam seal end for ferrule, welded - geometric configuration

    航空航天系列. 8 30 '鈦合金管連接件.動態密封頭的焊接箍.幾何配置
分享友人