竹篙灣公路 的英文怎麼說

中文拼音 [zhúgāowāngōng]
竹篙灣公路 英文
penny's bay highway
  • : 名詞1 (竹子) bamboo 2 (管樂器的代稱) woodwind instrument 3 (竹簡的簡稱)bamboo strip [slip]:...
  • : 名詞(撐船的竹竿或木桿) punt-pole; boat-pole
  • : Ⅰ名詞1. (水流彎曲處) bend 2. (海灣) bay; gulf; cove; inlet Ⅱ動詞(使船停住) anchor; moor; tie up
  • : Ⅰ形容詞1 (屬于國家或集體的) state owned; collective; public 2 (共同的;大家承認的) common; gen...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  1. The 3. 5 km rail line provides rail shuttle service between tung chung line sunny bay station and disneyland resort station at penny s bay

    這條3 . 5里長的鐵線提供鐵穿梭服務,往來東涌線欣澳站與之迪士尼站。
  2. Pbrl would be completed around 2005 to coincide with the opening of the park

    線將配合主題園,於2005年左右完成。
  3. All vehicles from urban, new territories and airport can go to the hong kong disneyland via north lantau highway and penny s bay highway

    所有由市區、新界及機場開出的車輛,均可經北大嶼山竹篙灣公路前往香港迪士尼樂園。
  4. Other major new road projects under planning include the deep bay link ( which will connect the proposed shenzhen western corridor to the local highway network ), the central

    其他規劃中的新道工程,主要包括連接擬建的深圳西部通道與本港網的后海干線、中環仔繞道、七號干線香港仔至堅尼地城段,以及連接
  5. The 3. 5 - kilometre penny s bay rail link that connects a new yam o station on the existing mtr tung chung line to penny s bay where the hong kong disneyland is being built. construction started in july 2002 for completion in 2005

    線全長3 . 5里,連接現有東涌線上新建的陰澳站與(該處現正動工興建香港迪士尼樂園) 。
  6. The penny s bay rail link connecting sunny bay with disneyland on lantau island is expected to be completed in 2005

    線連接欣澳與位於大嶼山的迪士尼主題園,工程預計在2005年完成。
  7. The disneyland resort line formerly known as penny s bay rail link will tie in with the development of the hong kong disneyland theme park in lantau

    迪士尼線前稱為線將配合香港迪士尼樂園主題園于大嶼山之發展。
  8. The disneyland resort line ( formerly known as penny s bay rail link ) will tie in with the development of the hong kong disneyland theme park in lantau

    迪士尼線(前稱為線)將配合香港迪士尼樂園主題園于大嶼山之發展。
  9. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line

    兩間鐵司正在落實六項鐵工程,即西鐵地鐵將軍澳支線馬鞍山鐵九尖沙咀支線線和上水至落馬洲支。
  10. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion

    兩間鐵司正在落實六項鐵工程,即西鐵、地鐵將軍澳支線、馬鞍山鐵、九龍尖沙咀支線、線和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。
  11. The pbrl scheme, which provided for an approximately 3. 5 km long, single - track system, connecting the tung chung line at yam o and a station at hong kong disneyland ( hkd ), was one of the project under the master project agreement entered into by the government, the walt disney company and hongkong international theme parks limited in 1999 on the development of hkd

    線方案提共一條約3 . 5里長的單軌鐵系統,在陰澳連接東涌線及另一端連接香港迪士尼樂園的車站,是政府、和迪士尼司及香港國際主題園有限司在1999年就發展香港迪士尼樂園而訂立的工程項目總協議之一。
  12. In planning the modes and level of public transport services at penny s bay, we have taken into account the existing policy of having railways as the backbone of the transport system, the need for balanced competition within the transport market and for maintaining choice for passengers, the planned availability and carrying capacity of the drl which connects to the mtr network, the existing public transport network, the projected passenger demand to and from penny s bay, the recreational nature of the passenger demand, the road network capacity and the operating characteristics of different transport modes

    我們規劃共交通服務的形式及水平時,已考慮現行以鐵為運輸系統骨幹的政策、保持交通服務市場上競爭均勢的需要並維持乘客的選擇、與地鐵網相連的迪士尼鐵線預定的服務水平及載客量、現有共交通網、預測往返的乘客需求、本質在於消閑游樂的乘客需求、道的容車量及各種不同類型交通工具的營運特式。
分享友人