第一期裝機 的英文怎麼說

中文拼音 [zhuāng]
第一期裝機 英文
first stage installation
  • : Ⅰ助詞(用在整數的數詞前 表示次序) auxiliary word for ordinal numbers Ⅱ名詞1 [書面語] (科第) gr...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : machineengine
  • 第一 : first; primary; foremost; first and foremost
  • 裝機 : airloading
  1. Based on the previous research on the portal crane administration, one standpoint put forward in this paper is idea that is on the foundation of reliability in this paper, two viewpoints take shape when reason is analyzed, that is fatigue break and appearing the flaw that will extend. what is the fatigue break ? ( this phenomenon is always happen in some place ), the fatigue is that board appears apophysis and concave when the board is pressed. so that the board ability of bearing the weight of load will descend

    本論文建立在已有的港口械管理的研究基礎之上,進步提出了以可靠性為基礎的港口械的管理思想,已有的研究表明,港口械設備破壞主要由於兩個原因,是穩定性問題,特別是構件的局部穩定性,所謂穩定性是指:在板的平面內,板受到平行於板面的壓力作用,使板發生隆起、內陷等凹凸不平的結果,從而使板受載能力減弱;二是結構出現疲勞裂紋及其擴展,這是由於設備長時運行,而造成設備某些部位出現裂紋並得以擴展,使設備承載能力下降。
  2. Supply of concentrate haemodialysis solution with bicarbonate powder buffer to the hospital authority and the department of health as a 24 - month contract from date of acceptance design, supply, delivery, installation, commissioning, maintenance of hardware, software and related services for the implementation of the automated tag and information display system for the immigration department on or before december 2006 supply of 320 000 kg. of polyelectrolyte type ii to the drainage services department as a 36 - month contract from date of acceptance provision of dental laboratory work for the department of health as a 24 - month contract from date of acceptance supply, installation and commissioning of a ground reception system for meteorological data from multi - functional transport satellite for the hong kong observatory from date of acceptance to fulfillment of contractual obligations supply and installation of 1 set of automated dna sequencing system to the department of health from date of acceptance to fulfillment of contractual obligations

    承投為醫院管理局和?生署供應高濃度血液滲析液連炭酸氫鹽緩沖粉劑,合約由發出接納書日開始,為24個月為入境事務處於2006年12月或之前推行自動化籌號及資訊顯示系統供應硬體和軟體,包括設計、送貨、安、試、保養及有關服務為渠務署供應320000公斤高分子電解質(ii類) ,合約由發出接納書日開始,為36個月為?生署提供牙科製品服務,合約由發出接納書日開始,為24個月為香港天文臺供應套多用途輸送衛星氣象數據地面接收系統,包括安及試服務,由發出接納書當日至履行合約訂明的責任為止為?生署供應和安套核酸序列自動測定系統,由發出接納書當日至履行合約訂明的責任為止
  3. The faa indicated that it was their expectation that all foreign carriers operating into the usa would comply with the faa rules, which require two phases of implementation. the first phase, to be in place by mid - march 2002, mandates either the placing of a bar across the inside of the cockpit door, or bolts located on the inside of the cockpit door, and either system being controlled by the pilots

    美國聯邦航空局表示,望所有進入美國境內的外國飛都遵守該局所定的規則。有關規則分兩實施。定出的規則,是在二零零二年三月中強制規定必須在駕駛艙艙門內橫置條門柵,或在駕駛艙艙門內上插鎖,兩種置都會由飛行員控制。
  4. In 1970, pope paul the sixth, visiting the philippines, was slightly wounded at the manila airport by a dagger - wielding bolivian painter disguised as a priest

    1970年六世羅馬教皇保爾,訪問菲律賓間在馬尼拉場被化名牧師的玻利維亞畫家用匕首刺傷。
  5. In chapter 3 we construct two approximation algorithms which applying bin packing algorithms for scheduling problems, one is ff ( first fit ) algorithm used in parallel machine scheduling problem pm / / dj = d / n which has a lower bound of asymptotic worst - case performance ratio, another problem is scheduling independent parallel tasks in parallel identical machine systems to minimize the makespan, we use strip packing method for it and give an approximation algorithm with asymptotic performance ratio no more than 1. 6

    個演算法利用箱問題中的ff ( firstfit )演算法求解極大化按完工工件數的平行排序問題pm d _ j = d n - u _ j ,該近似演算法具有漸近性能比下界。二個近似演算法利用二維箱中strippacking問題的演算法求解以極小化makespan為目標的帶并行工件的平行排序問題,該演算法的漸近性能比具有下界1 . 5和上界1 . 6 。
  6. The research work is held on schedule ; the first sample machine was taken testing in foundry plant of tsinghua university in late of 1995 and confirmed systematical control thought and technical parameter ; it is proved that this system has high precision of moisture measuring and creditability that establishes good preparation for new research

    研製工作如進行,九九五年底代試驗樣在清華大學鑄造廠進行試驗,初步確定了系統的控制思路及各項技術參數,驗證了自行開發的水分檢測置的精度及可靠性,為產品的樣設計打下堅實的基礎。
  7. Part three describes the successful application of technical innovation strategy to each period of 15000 oxygenerator engineering management including design, erection and operation / maintenance. some of the technical innovations had been put into effect, which all have solved the actual vital problems of 15000 oxygenerator engineering. some of them even can avoid serious problem from happening a second time, which not only have shortened the time - limit of erection and commissioning, but also played an important role in ensuring the smooth and safely operation of 15000 oxygenerator

    三部分論述了科技創新戰略在安陽鋼鐵公司15000制氧工程管理的設計階段、安施工階段和運行維護階段的成功應用,許多科技創新,都已經付諸實踐,都是有針對性地解決了安鋼15000制氧工程中的重大的實際問題,許多創新還可以避免些重大問題的再次發生,不但縮短了安和調試工並都已在確保安鋼公司15000制氧安全穩定運行方面起到了重要作用。
  8. Equip along with the weapon continuously creative, the sharp weapon also raises continuously in the quantity and the request on the quantities, processing to produce the mode and productions to process the production request that the equipments have already ca n ' t satisfy the long sail company originally possessed. through the common consultation of the company leadership and all employee, decide to throw in the capital, carry on to the company to reform completely, expand the scale, lead quantity and quantities that controls the production line to raise the production into the number, thus satisfy the competition ability that the productivity request combines to raise the business enterprise continuously. this thesis mainly what to study is the long spring aviation liquid to press to control the limited company number to control the degree of progress that the production line installs the item excellent turn, pass to use the item management of theories resolve the problem within actual application

    長春航空液壓控制有限公司前身是中國航空二集團下屬133廠,是個為飛配套載設備的軍工企業,成立於1998年,隨著我軍備事業的不斷發展,對武器備的需要也越來越迫切,大批量的高精尖武器備已經成為打贏高科技精備條件下局部戰爭的法寶,因此長春航空液壓控制有限公司針對這嚴峻形勢,果斷地提出利用項目管理的知識體系,引進數控生產線項目,在保證企業正常生產和安質量的前提下,縮短工,節約成本並通過項目管理知識體系的運用,用系統的管理知識,提高管理效率、管理水平,並運用到其他的項目中,從而最終提高企業的生產力和競爭力。
分享友人