筋介 的英文怎麼說

中文拼音 [jīnjiè]
筋介 英文
kinsuke
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  1. Simultaneously, combine with his own work experience, the author gets an advanced detail and general design steps. and then illustrates an actual engineering which is designed with the article ’ s recommendatory method and steps. by combining with the test results, it is proved that the ground treatment result obtains the design requirement and the commendatory method is right, which is able to provide reference value to the engineering

    本文首先對加土的研究現狀做了詳細的紹和分析,在此基礎之上,對加土地基設計方法做了一定的研究,對地基承載力力設計方法做了對比分析,選擇極限分析法作為本文的推薦方法,並結合作者自身的工作經驗,提出了加土地基詳細和全面的設計步驟,然後用一個加土地基實際工程為例,採用本文推薦的設計方法和步驟進行設計,並通過現場試驗結果,證明該地基處理達到設計要求,也證明了推薦方法計算的準確性,這對廣大工程師在實際工程操作中有較高的參考價值。
  2. Abstract : by using engineering example this paper briefly introduces the application and constrction method of ferroconcrete filling pile in the transformation of old buildings

    文摘:以工程實例簡要紹了鋼砼灌注樁在舊樓改造中的應用及具體施工方法。
  3. The consolidating wave speed means the speed at which elastic stress wave transmits throughout reinforced concrete, and it is intervenient the inherent wave speed of steel and of the concrete. moreover, the consolidating wave speed inherent in the material of the reinforcing steel bar and the concrete, and it relates to the cling strength of steel bar and the concrete

    固結波速是指彈性應力波通過鋼-混凝土體系傳播時的速度,通過理論分析得知固結波速的大小於鋼和混凝土中彈性應力波速之間,由鋼與混凝土二者的材質特性決定,與二者的粘結強度密切相關。
  4. " don ' t rack your brains. in those words mephistopheles introduces himself to faust. have you read faust ?

    「您不必傷腦了,這是米菲斯托菲爾向浮士德自我紹時說的話。您讀過《浮士德》嗎? 」
  5. Hosted by d. kostopoulos and published by slack incorporated in 2005, this video demonstrates treatment techniques in trigger point and myofascial therapy and proprioceptive training, with anatomical pictures of pain pattern muscle. the presenter also suggests home exercises that can help prevent injury

    此套錄影帶於二零零五年發行,示範肌膜激痛點及肌膜治療法和本體感受訓練,並附有圖片解釋肌肉痛癥,及紹預防創傷的家居運動。
  6. This paper referred to the massive domestic and foreign technical material, elaborated in the sheet forming value simulation theory essential technology in detail, points out when analysis sheet forming question should use the big distortion ball plasticity fem and introduce the application characteristic and the function summarizes of the sheet forming simulation software dynaform. secondly, analyzed the cover forming characteristic, simultaneously introduced the influence cover forming factor in detail : such as ramming direction, the craft addendum surface and the material pressing surface, the radius of convex - concave mold, draw bead, pressure strength, blank size and craft margin and so on. and simulates many typical automobiles cover panel with software : such lateral board, back taillight pedestal and storage cover

    其次,分析了覆蓋件成形的特點和要求,同時詳細紹了影響覆蓋件成形的因素如沖壓方向、工藝補充面和壓料面、凸凹模圓角、拉延、壓邊力、坯料尺寸和工藝切口等,並用數值模擬軟體對多個典型的汽車覆蓋件汽車后側圍板、后燈座以及轎車后備箱蓋的沖壓成形情況進行模擬,用模擬結果優化拉延工藝方案,比較了內覆蓋件和外覆蓋件在成形特點和要求的一些異同點,以及常見的起皺、拉裂和回彈、成形不足等缺陷的產生機理和相應對策,重點紹工藝補充面和壓料面的設計及優化方法,因為拉延是沖壓工藝的關鍵工序,而工藝補充面和壓料面的設計是拉延工序的關鍵,對消除缺陷至關重要。
  7. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  8. A new type of automatic spot welding controller for reticulate frame made by reinforcing steel bar is introduced, and the working principle, hardware circuit and software of the control are described in detail

    摘要研製了一種新型的全自動鋼電阻點焊控制器,詳細紹了該控制器的工作原理、硬體電路及控制軟體。
  9. The experimentation of the door outer ’ s viscous pressure forming under different blank holder pressures has been done. the strain distributions of the decorated rib and handle are obtained by the girding method and the thickness strain distributions are also obtained

    通過網格分析法對試件關鍵部位(裝飾和把手)的應變進行了分析,分析了粘性質壓力成形過程中成形試件的壁厚分佈。
  10. The methods of tendon or fascia fixation and bone grafting are discussed here

    本章主要紹肌腱和膜固定方法及骨移植。
  11. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉橋主橋墩設計為鋼混凝土圓端型沉井結構,其中詳細紹了沉井下沉施工技術,同時紹了水下松動控制爆破技術。
  12. The programme can solve two - dimensional stresses, strains and axial symmetry problems with different yield criteria. a satisfying solution has been put forward to the contact boundary between reinforcements and soil. the special problem of two contact plane elements at the joint between plate and strip has been solved

    該程序能同時考慮平面應力、平面應變和軸對稱問題,並能運用不同的屈服準則,使其更具有通用性和適用性,成功地解決了材與土質界面的接觸問題,較好地解決了墻面板與帶連接處出現兩個接觸面單元的特殊問題。
  13. This articles presents the nomenclature, location and needling manipulation and indications of acupoint yanglao ( si 6 ) and its clinical application in the treatment of neck stiffness, back fascitis, prolapsed lumbar vertebra and sub - calcaneal fat pad lesion

    摘要紹養老穴命名、取穴方法、操作方法及適應癥,並列舉治療落枕、背肌膜炎、腰椎間盤突出癥、左跟骨下脂肪墊炎等病例4則。
  14. This paper presents the experimental results of typical elements of field works such as reinforced concrete beams, fiber glass reinforced plastic honeycomb sandwich plates, flexible covers ; examines the interrelationship of the loads and deformation under the condition of large deformation ; obtains the laws governing the interaction of the medium and the structure ; solves the design and calculation problems related to shallow buried structures in soil

    本文在對大量試驗資料進行整理和作了大量分析計算的基礎上,選取了野戰工事中有代表性的構件即鋼混凝土梁,玻璃鋼蜂窩夾層梁式板和帆布被復作為研究對象進行試驗研究。深刻地考察了大變形條件下荷載和變形之間的內在關系,進而掌握了質與結構相互作用的規律,較好地解決了土中淺埋結構的設計計算問題。
  15. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,紹了沉井施工過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼綁扎,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  16. It gives a brief introduce on working theory, combination of proventing soil wall with sinew soil and on structure material, calculation of proveuting soil plank, tensil sinew, restuffing material

    文中對加土擋土墻的工作原理、組成以及擋土板、拉、回填料的結構、材料與計算作了概括紹。
  17. Stone - escaping skill ; sideboard corner stone capture ; stalemate triple alive ; the common skill of weiqi ; hane and two - step hane ; dig between two enemy stones ; abandon strategy ; fantasy capturing stone - by abandoning ; expand territory ; way of connection ; a set sequence of moves joseki ; attack defense skill ; common opening stage theory ; position situation judgment

    逃子技巧邊角吃子要領雙活與三活圍棋常用手法連拔及反打挖的運用棄子戰術巧妙吃子倒脫靴擴張模枰通連方法常用定式紹攻防手常見布局探討形勢判斷要領
  18. Introduction of doctor du zi - ming ' s manipulation of restoring and treating injured soft tissues and fractures

    近代中醫骨傷名家杜自明理正骨手法
  19. This paper introduces the construction techniques of the box girder bottom - formwork making, steel bar handling, and concrete casting, etc., and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of changhan superhighway

    紹了箱梁底模製作、鋼加工、混凝土澆築等施工工藝及其在長邯高速公路第10合同段內的兩座箱梁大橋中的應用。
  20. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板施工、鋼施工、混凝土澆築等幾個方面紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體清水混凝土墻施工技術。
分享友人