筋升 的英文怎麼說

中文拼音 [jīnshēng]
筋升 英文
jin sheng
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : Ⅰ動詞1 (由低往高移動) rise; hoist; go up; ascend 2 (等級提高) promote Ⅱ量詞1 (容量單位) lit...
  1. Their kind smiling faces during their performance made one feel that guan yin bodhisattva was around. the san francisco health and beauty art performance school was performing the yuen zi dance, known for its effectiveness in enhancing the flexibility of our body

    當三藩市健與美藝術團穿著民族服裝出場時,讓人眼前一亮,他們表演的元極舞,能增強老人家的骨活動能力,讓人越跳越朝氣勃勃,能提身心的健康舞蹈。
  2. The nearly conical fuji is classified as a dormant volcano since it last erupted in 1707, but the government was rattled in november 2000 when the number of small earthquakes shaking the peak jumped to more than 200 from a monthly average of around 20

    這座類似圓錐形的火山最後一次爆發是在1707年,之後被歸為"休眠火山" 。但是在2000年11月,日本政府大傷腦,因為富士山上小地震不斷,從平均每月20次左右飆到200次之多。
  3. Improvement on the elevatory dragline of zy240 type dump truck

    240型自卸車舉的改制
  4. Construction of turnover formwork in reinforcement chimney hydraulic lifting frame

    混凝土煙囪液壓提架翻模施工
  5. If the victim sweats heavily and convulse, serve him with salt water in the ratio of one tea spoon of salt to one litre of water

    如果患者大量流汗、抽,可在水中加鹽每半公水加半茶匙鹽。
  6. 3. a space bond slip relation of reinforcements in either end of a member is proposed, based on one - dimensional bond slip model of reinforcements proposed by teng zhiniirmg from tsinghua university, the first - time loaded ascending stage ? curve of which model is modified as the line which parameters are not changed so as to simply the computation. the bond, slip is regarded as the boundary nonlinearity of a member

    3 、採用清華大學滕智明建議的一維鋼粘結滑移恢復力模型,但從簡化計算的角度出發,將首次加載的上段曲線改為直線,並假定構件端部的諸多縱向鋼的滑移服從平截面假定,考慮由節點錨固區粘結滑移引起的構件端截面軸向和兩轉角附加變形。
  7. The 308 rc z concept car is powered by a 1. 6 litre thp engine derived from the ep6dts unit developed by psa peugeot citro & euml ; n and the bmw group

    308鋼混凝土的z概念車搭載一臺1 . 6公引擎巴馬汀來自ep6dts股開發由標致雪鐵龍集團和寶馬集團
  8. Direct against : liver, courage improve with the balanced function, can increase resolute strength, improve the reproductive system, improve the hydroncus

    針對:肝、膽有改善平衡之功能。可增加果斷力,提精神改善血液循環系統更能舒暢骨。
  9. Vertical transportation : reinforcing steel bar, from and so on materials should use self - lifting tower crane and one 50t crawler crane

    垂直運輸:鋼、模板等材料使用自式塔式起重機,並配備一臺50t履帶式起重機。
  10. Technical code for reinforced concrete lif - slab structure

    混凝土板結構技術規范
  11. Using uprising method to raise tunnel with reinforced concrete cover

    用頂法抬高鋼混凝土蓋板涵洞
  12. Slabs are concreted complete with ducts and openings framed with metal aprons welded to slab reinforcement and intended to accommodate columns

    樓板用混凝土澆注成整體,其上留有用金屬擋板圍成的孔道和提環,它們和樓板配焊接在一起,以備將柱子套入其中。
  13. Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    文摘:水下混凝土澆注鋼籠上浮事故的原因是操作不當,如鋼籠固定不牢、提導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  14. Generally ship lift structure is consisted of two or four huge reinforced concrete tube towers and a single - story machinery building on the top of tube towers. because the tube towers is demanded to support the large loads, the lateral stiffness of tube towers is a few hundred times as solid as that of the top machinery building and cause the sudden change of the stiffness. this change would cause insentive seismic whipping effect of the top building. the aseismic methods are difficultly used to reduce seismic responses of the top building of ship lift structure. the feasibility of develop an intelligent vibration control system is explored in the paper

    這樣,在塔柱頂部鋼混凝土平臺就會產生側移剛度的突變。這種巨大的剛度突變會引起船機頂部廠房強烈的地震鞭梢效應,使得船機頂部廠房地震反應的控制就成為船結構抗震設計中的關鍵問題之一。由於採用常規的結構振動控制方法難以較好地解決船機頂部廠房地震鞭梢效應,因此這就為智能振動控制技術的發展和應用提供了可能。
  15. The cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    水下混凝土澆注鋼籠上浮事故的原因是操作不當,如鋼籠固定不牢、提導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  16. This paper use the principle of mass concrete temperature raise and down will make concrete inside stress and strain cause change, and mixture ratio of concrete effect temperature stress, and the principle of equilibrium management model of china - pole, and the test curve of temperature in engineering, and the model experiment " anti - pull " together of mass concrete etc, to studied mass concrete anti - crack theory in design, construction and management

    本文採用大體積混凝土溫度降引起混凝土內部的應力和應變產生變化及混凝土的配合比對其溫度應力的影響原理、鏈桿平衡管理模型的計算原理、工程溫度實測曲線、大體積混凝土「抗?放」結合模型的試驗結果等研究了大體積混凝土在配設計、施工及施工管理過程中的抗裂措施。
  17. Construction technology of hydraulic lifting and turning over formwork for concrete chimney 240 m high

    高鋼混凝土煙囪液壓提翻模施工技術
  18. This kind of construction hoist is a universal hoist for passengers and materials with a speccial bucket and a platform to load concrete and very long steel bar. it is mostly used in construction of cooling tower and chimney of power plant to transport passergers and materials

    該系列施工降機是一種帶有料門和鋼運架的多用途人貨兩用降機,可用於建造電廠冷卻塔煙囪等特殊工程施工,解決混泥土超長鋼及人員垂直運輸。
  19. Tunnel vault and the surface of the side wall, play a firing prevention and heat insulation protecting roles, prevent the armored concrete reducing its intensity when the temperature rapidly heating up because of fire, avoid the tunnel from exploding and protect effectively the lining reinforcing steel bar not to lose supporting capacity so as to avoid the tunnel collapsing

    隧道防火塗料塗噴在隧道內的拱頂和側壁的表面,起防火隔熱保護作用,防止隧道內鋼混凝土在火災中迅速溫而降低強度,避免混凝土炸裂、有效保護襯內鋼不會失去支撐能力而避免隧道垮塌。
  20. There ' re reports saying that the sp1 rc can be upgraded without uninstalling first, but try at your own risk

    有正在報導說,該sp1的鋼混凝土,可以級,沒有卸裝第一,但嘗試您自己承擔風險。
分享友人