管道敷設工程 的英文怎麼說

中文拼音 [guǎndàoshègōngchéng]
管道敷設工程 英文
ducting works
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Pipe laying works

  2. The labor quota of long - distance pipeline construction

    長輸管道敷設工程勞動定額
  3. West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench

    摘要黑河是西部採用大開挖方式穿越的距離最長的河流,原油與成品油採用同溝方式穿越該河流。
  4. The modes selection of directly buried installation for hot - water heat - supply pipeline, the design and construction of directly buried installation with and without expansion joint and the quality assurance of prefabricated directly buried insulating pipe are discussed with a practical engineering example

    摘要結合實例,探討了熱水供熱直埋方式的選擇,有補償和無補償直埋方式的計與施及預制直埋保溫質量的保證。
  5. Take the gelmud - lhasa product oil pipeline as an example, the authors study and discuss some technical problems about pipeline construction in the permafrost region, including pipe laying methods to be selected, cathodic protection technology, weather and environment variation along pipeline route and environment control of pipeline route

    以格拉輸油為例,探討了凍土地區可選擇的方式、油氣的電保護技術、氣候和環境變化對的影響以及沿線環境理等方面的問題。
  6. The synthetic operation of engineering pipelines of a residential area is to collect designed and existing information of each kind of engineering pipelines in the layout space of the residential area, to analyze and investigate the information, to find out and solve the conflict in the constructing process of the engineering pipelines, to synthetically arrange the plane and vertical location of the engineering pipelines, to provide the foundation for the engineering pipelines " designing, construction and management the leading content of this dissertation is how to make use of the vertical space under roads in the residential area and rationally locate every underground engineering pipelines

    小區線綜合就是搜集包括現狀的小區規劃范圍內各項的規劃計資料,加以分析研究、綜合安排,發現並解決線在規劃計中的矛盾,合理地安排各線的平面位置和豎向高度,為各線的計、施理提供依據。由於架空方式很難保持環境的完整和美觀,有礙小區進一步發展,且存在諸多不安全隱患,正被逐步替代,因而,如何利用小區路下的豎向空間,合理置各專業埋地線,成為本文研究的主要方向。
  7. The company has been undertaking projects such as power delivery and distribution system for alternating currents of 110 kv and below, smart architecture system, channel and optical cable laying project for communication system, computer network system, and cable television network,

    公司一直從事110kv及以下送變電和配電系統、建築智能化系統及通訊系統的和光纜、計算機網路系統、有線電視網路、機電安裝與城市路照明等
  8. Responsibilities of the branch also include providing advice on regulatory accounting to the telecommunications authority, monitoring the performance of public telecommunications operators, investigating industry complaints regarding public telecommunications services, facilitating public mobile network operators access to land to place radiocommunications installations and coordinating the laying of ducts for telecommunications in public roads

    其他職責還包括就電訊規計帳向電訊理局局長提供意見、監察公共電訊服務營辦商的表現、調查有關公共電訊服務的業界投訴、協助公共流動網路營辦商進入土地置無線電通訊裝置、以及協調在公用電訊電纜
  9. At the same time, constrained by geologic condition and engineering practice, many pipelines have been buried in soft soil

    同時,受地理條件和實際的限制,許多在軟土地基中。
分享友人