箱形板梁 的英文怎麼說

中文拼音 [xiāngxíngbǎnliáng]
箱形板梁 英文
box plate girder
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The study of influence of the crossbeam and corner prop on shear - lag in the thin - wall curve box beams

    橫隔及角隅承托對薄壁曲線剪力滯影響的研究
  2. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(縱向、橫隔橫向、斜腹豎向)也施加在相應的位置,分析了在自重、索力和預應力作用下的空間應力效應。
  3. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋鋼橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變基礎上,提出了(即鋼+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的高性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  4. The work in this thesis mainly includes following parts : 1. as for box girder cross section, the three - bar stimulation method under typical loads and supports has been introduced. the force and stress formulae for flanges have been derived from the three - bar method. by reasonable simplification for multi - cell box girder, the three - bar method has been applied in multi - cell box girder ' s shear lag analysis

    對于截面主,本文介紹了三桿比擬法上、下翼中比擬桿的計算公式,以及在典型荷載和支承的情況下翼內各桿的應力計算公式,並對多式主截面進行合理簡化,使三桿比擬法應用於多室的剪力滯分析。
  5. On basis of the producing fact of kiu ming heavy machine ltd, the author get much fact material through inner research, and presents a imagine of new corrugated - web structure of overhead traveling crane. through enough compare and argumentation, this paper presents using sine curve as corrugated sheet of web

    作者根據昆明重機股份有限公司的生產實際,深入調查研究,在掌握大量生產應用實際的資料基礎上,提出了橋式起重機的的新型波結構的設想,並在充分比較和論證的基礎上提出了以正弦曲線波作為腹的波
  6. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大橋主航道斜拉橋鋼混凝土結合的鋼結構部分、混凝土橋面、鋼混凝土結合部位在海洋環境下耐久性設計特點及採用方案。
  7. There are two methods for welding radial stiffeners to bias - rail box girder : welded all around and open at tensile flange

    摘要起重機偏軌橫向加強有加強四周均焊和在受拉翼緣處空開2種焊接方式。
  8. The overhead traveling crane used at a cold strip mill factory is given to study the deformation, stress distribution and load capacity of the main girder with 3d - fea shell - to - solid submodel method

    以某冷軋帶鋼廠橋式起重機偏軌為例,採用三維有限元法「到體子模型」技術,比較分析了加強2種焊接方式下主的變、應力分佈和承載能力。
  9. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變的計算,計算各工況荷載作用於吊全結構面、內支撐、吊桿、懸吊頂、底等的應力和變,並對比吊圍堰面計算變和施工實測變,結果是吻合的;對大遼河特大橋高樁承臺輕型吊的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  10. 4. the elementary analysis about the geometrical parameter influences of plate thickness and breadth of rib beam on mechanical properties of the thin - wall core box cast - in - site concrete hollow floor is also made. a single geometrical parameter on mechanical properties of such floor system is set forth and the fitting scale for these parameters is determined to provide the reference when designing

    4 、對影響薄壁體現澆混凝土空心樓蓋內力和變寬度、肋寬、肋間距、厚等因素進行了分析,討論了單一幾何參數對該樓蓋受力性能的影響規律,提出這些參數適宜取值范圍,為對這種樓蓋進行設計時提供參考。
  11. Shear properties in the plane of the panel ( interlaminar shear ) duplicate the kind of shear stress encountered in such glued structural assemblies as structural sandwiches and adjacent to gluelines between flanges and webs in box - beams and i - beams and gusset plates in trusses

    平面的剪切特性(層間剪切) ,與夾層結構這類粘合組件,以及、工字凸緣與腹間的焊接層和桁架加固附近位置所受的剪切應力類型相同。
  12. Second, change the diaphragm ’ s space between, retain the other thing, analyze the influence of the stress and deformation of box ? girder cross section and the beam web. based on the analysis upwards, the writer studied the rule of the influence of the stress and deformation box ? girder cross section and the beam web with different diaphragm ’ s space between. according to the results of finite element analysis, the writer puts forward some suggestions which will provide some reference for the following design

    本文利用ansys有限元分析程序,對指定斷面,不同曲率的曲,建立完備的有限元模型,分別對二個方面的問題進行了分析:其一,通過對在有無跨中橫隔時截面頂及腹的變和應力分佈的對比分析,闡述了設置跨中橫隔的重要性;其二,在相同工況下,通過改變橫隔的設置間距,分析對翼緣及腹的受力影響。
  13. Discusses of design method of box girder with corrugated steel webs

    鋼腹橋設計方法探討
  14. The influence of shearing deformation causes the non - uniform stress in the wing plate of the box girder, especially the cantilever box girder

    摘要剪切變的影響使得的翼中出現應力不均勻現象,尤其是懸臂剪力滯現象。
  15. Analysis could also show, to improve the stress distribution of the twin - box single cross section of cable - stayed bridge, it is the best way by thickening the bottom flange

    分析還表明,加厚底對斜拉橋雙單室應力分佈的改善效果最佳。
  16. In recent years, during the detection of the established reinforced concrete or the prestressed concrete box girder bridges etc. the large structures, we can find that the concrete in particular structural positions such as the anchorage zones of prestressed reinforcement with dense reinforcement, the prestressed pipe in which the space of reinforcement or the thickness of concrete cover is small, the top and bottom flange of box girder and so on has brought great difficulty to concrete construction because of the small size and densely - packed reinforcement

    對于變截面t、工字等常見結構,截面式復雜,一些部位尺寸較小且密集配筋,如,預應力管道間,混凝土不可避免的造成不密實導致耐久性降低,而這些問題往往為設計者所忽略。對于新建橋混凝土的密實度問題,尤其是新建橋關鍵部位的混凝土密實度和耐久性問題,人們研究和關心的較少,這也為橋的質量監督控制和使用壽命埋下了隱患。
  17. There are many cross - section forms such as t cross - section, i cross - section, slab cross - section, box cross - section etc. for common span of bridges. slab and box cross - section beam ' s resistance to torsion is stronger than t and i cross - section beam ' s. but deadweight of slab and box cross - section beam is bigger than it of t and i cross - section beam

    現有常用跨徑橋的截面式多為以下幾種: t、 i式截面和截面等,式截面和截面與t和i這些開口截面相比其抗扭能力更強;但式截面的自重要比t的自重大得多。
  18. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立井井塔為現澆鋼筋混凝土結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  19. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立井井塔為現澆鋼筋混凝土結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  20. This paper summarizes the status and developing direction and the important action on the modem industry of material handling, analyzed the status of overhead traveling crane in our country. because internal box - maingirder overhead traveling cranes s main girder is too weight and need too material, this paper presents a improving method to web of main girder

    本論文闡述了目前國內外物料搬運的狀況、發展動態和發展方向,以及物料搬運在現代工業中的重要作用,研究了目前國內橋式起重機的現狀,針對國內橋式起重機主偏重、耗材多等缺點提出了一種對主的改進方法。
分享友人