箱梁 的英文怎麼說

中文拼音 [xiāngliáng]
箱梁 英文
box girder
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. Considering the difference of cantilever plate between the end and the middle of the concrete box bridge, the chief influence factor is studied

    考慮箱梁端部和跨中懸臂板根部的區別,研究了影響變厚度懸臂根部彎矩的主要因素。
  2. Being aimed to the irrationality and inadaptability of different calculation methods for wide cantilever plate, study of space numeric simulation analysis about concrete box bridge cantilever plate can be carried out for three dimension solids based on ansys

    摘要針對混凝土箱梁懸臂板諸多演算法的不合理性,應用大型通用有限元分析軟體ansys ,以三維實體單元對混凝土箱梁懸臂板進行空間數值模擬分析研究。
  3. The box girders were to be precast units, bonded together in place at the joints with an epoxy resin.

    箱梁採用預制構件,在現場連接處塗以環氧樹脂,以粘結成為整體。
  4. Construction of post - tensioned pre - stressed box girders for hengdaozi flyover on dandong - benxi express highway

    本高速公路橫道子立交橋工程后張預應力砼連續箱梁施工
  5. Each succeeding fabricated box is erected on trolleys.

    每段預拼的箱梁安裝在小平車上。
  6. Comparing the results of one irregular box beam obtained by the gridiron method to that by fem, the characteristics of the application scope, merits and drawbacks of the gridiron method are convinced. it is shown that the gridiron method underestimates the results in contrast to fem when analyzing irregular box beams

    對上德立交橋中的一聯異形箱梁通過不同的方法以及試驗進行分析和計算,詳細地說明了異形箱梁設計中常常使用的格法的適用情況和實際的效果。
  7. The consequence is, when the majority of structure does n ' t enter yield habitus, but the position of belly - board has been reached the ultimate habitus, it lead to material waste of the other positions, we should pay attention to the disastrous result it will bright to us

    它帶來的後果就是當結構的大部分處于彈性狀態時,箱梁腹板處由於剪力滯效應一般最先達到強度極限狀態,導致腹板間材料的抗力沒有得到充分的使用,如不引起重視會帶來災難性後果。
  8. The box beam ' s temperature stress of longitudinal direction and transverse direction with different conformation are analyzed, it finds that there is largish temperature tensile stress in the bottom of top deck and the haunch of box beam increase temperature tensile stress in the bottom of top deck. the paper makes a study of different thermal effects resulted from several kinds of closed rigid frame

    根據大量實測溫度場結果建議採用一個有利於理論推導的指數函數的公式來擬和箱梁體內的溫差分佈,既貼近實測數值,計算又比較簡單;通過對空腹式剛架拱橋尤溪洲大橋所在地夏季、秋季、冬季的溫度場及溫度應力的實測,以及與本文所提出計算方法的理論解進行的分析比較,證實了本文計算方法的正確,同時改進了已往混凝土箱梁溫度自應力的計算方法。
  9. Analysis of ultimate strength for box girder by marc

    進行箱梁的極限強度分析
  10. In the thesis, fem and plexiglass model test are used for the research of shear lag effect on double - level continuous box girder

    本文運用有限元分析和有機玻璃模型試驗方法對雙層荷載連續箱梁的剪力滯效應進行深入研究。
  11. Steel strands shape parameters of skew prestress box girder

    斜交預應力箱梁鋼絞線形狀特性及其影響
  12. Supervision points on jacking up steel - box ruction of self - anchored suspension bridge

    自錨式懸索橋鋼箱梁頂升施工的監控要點
  13. After closure, continuity prestressing tendons would be provided in the bottom of the box.

    合攏以後,箱梁底部布置有連續的預應力筋。
  14. The actual examples of the large - tonnage static tests on the box - beams

    箱梁大噸位靜載試驗實例
  15. At the mean time, algor, a famous fea program, is used to verify the results obtained by the program compiled. the results are proved to be correct

    同時,學習了大型有限元程序algor ,用它分析了前述研究的箱梁,並把結果與自編程序計算的結果進行了比較,表明編制的程序計算的結果是正確的。
  16. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋鋼箱梁橋面鋪裝工程,從鋪裝層環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即鋼板+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的高性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  17. The work in this thesis mainly includes following parts : 1. as for box girder cross section, the three - bar stimulation method under typical loads and supports has been introduced. the force and stress formulae for flanges have been derived from the three - bar method. by reasonable simplification for multi - cell box girder, the three - bar method has been applied in multi - cell box girder ' s shear lag analysis

    對于形截面主,本文介紹了三桿比擬法上、下翼板中比擬桿的計算公式,以及在典型荷載和支承的情況下翼板內各桿的應力計算公式,並對多式主截面進行合理簡化,使三桿比擬法應用於多室箱梁的剪力滯分析。
  18. A scheme on the erection of 50m concrete box girder in hangzhou bay bridge

    雙幅混凝土箱梁運架方案探討
  19. Static experiment for double - track box beam

    雙線箱梁靜載試驗研究
  20. Observation and control of settlement of light rail continuous box beam

    輕軌連續箱梁沉降觀測及控制技術
分享友人