箱筋 的英文怎麼說

中文拼音 [xiāngjīn]
箱筋 英文
crossbar of the moulding box
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  1. This paper referred to the massive domestic and foreign technical material, elaborated in the sheet forming value simulation theory essential technology in detail, points out when analysis sheet forming question should use the big distortion ball plasticity fem and introduce the application characteristic and the function summarizes of the sheet forming simulation software dynaform. secondly, analyzed the cover forming characteristic, simultaneously introduced the influence cover forming factor in detail : such as ramming direction, the craft addendum surface and the material pressing surface, the radius of convex - concave mold, draw bead, pressure strength, blank size and craft margin and so on. and simulates many typical automobiles cover panel with software : such lateral board, back taillight pedestal and storage cover

    其次,分析了覆蓋件成形的特點和要求,同時詳細介紹了影響覆蓋件成形的因素如沖壓方向、工藝補充面和壓料面、凸凹模圓角、拉延、壓邊力、坯料尺寸和工藝切口等,並用數值模擬軟體對多個典型的汽車覆蓋件汽車后側圍板、后燈座以及轎車后備蓋的沖壓成形情況進行模擬,用模擬結果優化拉延工藝方案,比較了內覆蓋件和外覆蓋件在成形特點和要求的一些異同點,以及常見的起皺、拉裂和回彈、成形不足等缺陷的產生機理和相應對策,重點介紹工藝補充面和壓料面的設計及優化方法,因為拉延是沖壓工藝的關鍵工序,而工藝補充面和壓料面的設計是拉延工序的關鍵,對消除缺陷至關重要。
  2. After closure, continuity prestressing tendons would be provided in the bottom of the box.

    合攏以後,梁底部布置有連續的預應力
  3. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  4. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨水管和污水管道用預制鋼混凝土形斷面的標準規范
  5. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨水管和污水管道用預制鋼混凝土形斷面的標準規范
  6. Hydraulic concrete crusher detail : all round, extremely efficient concrete crusher system for concrete demolition in general, and reinforcement exposure in particular. the system works immissionfree, i. e. : it does not produce any noise, dust or cibrations and operates without water. description : pliers qty 1, hydraulic power pack qty 1, 10m long oil pipe set of hoses, high pression qty 2, accessories bag qty 1

    啟動電機帶動油泵運轉,液壓油直接返回油手動轉動換向閥三位四通閥一個位置后,液壓油進入系統推動活塞,活塞桿伸出,帶動鉗體收縮,從而破碎鋼混凝土結構,反向轉動換向閥,鉗體松開,完成一個工作循環。
  7. Rebar fixing of extension of box culvert no. 1

    形排水渠的鋼
  8. Due to their simplicity in fabrication and excellent strength to weight ratio, stiffened steel panels are also widely used for construction of land based structures such as box girder and plate girder bridges

    由於製作簡單且有良好的強度重量比,加板也廣泛應用於製造陸基結構物如梁和板梁橋等。
  9. Strengthening of a reinforced concrete continuous box girder bridge

    混凝土連續梁橋的加固
  10. This paper introduces the construction techniques of the box girder bottom - formwork making, steel bar handling, and concrete casting, etc., and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of changhan superhighway

    介紹了梁底模製作、鋼加工、混凝土澆築等施工工藝及其在長邯高速公路第10合同段內的兩座梁大橋中的應用。
  11. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼,分底腹板和頂板分別綁扎並吊裝鋼骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  12. Application and research of reinforcing techniques in rc box - rib arch bridge

    肋拱橋加固技術的應用及探討
  13. The modal base can make much operation such as calculating the internal force, computing the foundation pressure and bearing capacity, checking the foundation sedimentation, and testing the shear resistance on individual foundation, strip foundation, raft foundation, box foundation, pile foundation and so on

    該庫能實現對獨立基礎、條形基礎、筏板基礎、型基礎、樁基礎等各種基礎的內力計算、土層承載力確定、地基反力計算、地基變形驗算、軟弱下臥層驗算、基礎配等操作。
  14. Construction monitoring of reinforced concrete arch bridge with precast segmental cantilever

    懸臂拼裝鋼混凝土型拱橋的施工監測方法
  15. Standard for circular prestressed concrete water tanks with circumferential tendons

    帶有環形預應力鋼的環形預應力混凝土水標準
  16. The coal unloading chute is a kind of the underground reinforced concrete box structure. the main beam of coal unloading chute being made skew, this kind of structure has been the first time in domestic

    進煤系統的主體建築物卸煤溝為地下式鋼混凝形結構,卸煤溝溝頂主梁採用斜向布置,這種結構布置形式在國內尚屬首次。
  17. It specially produces all kinds of plactes materials and something else. for example, suits, cases, gloves, toy and sport appliances, elastic cords, cotton and rubber band strings

    澄新公司專業生產各類適用於服裝、包、手套、玩具、運動器材等,各種松緊帶、棉繩、橡繩、服裝衣架、照相、手機吊帶等;以及相關的塑料製品,並能按客戶提供之樣品生產。
  18. Experimental study on the long - term behavior of concrete box girders prestressed with external cfrp tendons

    預應力混凝土梁長期受力性能試驗研究
  19. The machine can form five veins at one time to strengthed sheets, mostly used to produce duct and strengthed case sheet

    五線平衡壓機用於板料補強,可一次性壓出多條加強,多用在冷氣風管製作板料的加強等方面。
  20. The calculation results of deformation and internal force have been obtained, with which the experimental results are compared. finally, based on the experimental study and theoretical analysis, with the reference of practical calculation method given by related code of concrete structure in time, the practical calculation method and the design suggestion of coal unloading chute with skew beam are brought forward. the method is both reasonable and simple, and the calculated results are in good agreement with that of the experiment

    最後,在試驗研究和有限元分析的基礎上,參考有關現行規范對同類結構的設計方法,提出了斜梁式淺埋形卸煤溝結構的簡化計算模型;針對卸煤溝的特點,提出了相應的構造措施及鋼配置方式要求;根據地下結構的動態反應特性、主要破壞特徵及震害分析,提出了卸煤溝避免地震破壞的措施。
分享友人