箱頂封裝 的英文怎麼說

中文拼音 [xiāngdǐngfēngzhuāng]
箱頂封裝 英文
desk top enclosure
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • 封裝 : [半] package; potting; encapsulation; enclosure; packing; cladding; jacketing; encapsulating; pac...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊鋼筋骨架入模;拆式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、端、橋面防水層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Seal the shipping container with either two inches ( 5. 08 cm ) or more width of pressure - sensitive or nylon - reinforced tape or with 60 - pound, three inch ( 7. 62 cm ) wide water - activated reinforced tape. close the box securely, applying three strips of tape to both the top and bottom of the box, so the middle and two edge seams are sealed

    08厘米)或更寬寬度的感壓或尼龍加強膠帶,或者使用60磅、三英寸( 7 . 62厘米)寬的水活性強力膠帶,密運輸容器。在包部和底部貼上三條膠帶,牢固地合上包,這樣中間的接縫和兩條邊沿接縫就已經密了。
  3. Seal your box with heavy - duty tape ( preferably reinforced ) by applying three strips to both the top and bottom of the box, so that the middle seam and the two edge seams are sealed

    在包部和底部貼上三條膠帶,使用重負載膠帶(最好是加強型)密,這樣中間的接縫和兩條邊沿接縫就已經密了。
分享友人