節制壩 的英文怎麼說

中文拼音 [jiézhì]
節制壩 英文
check dam
  • : 節構詞成分。
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 節制 : 1 (限制; 控制) control; check; be moderate in 2 (指揮管轄) command; direct; control 3 (克制...
  1. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    砂石料場的規劃選擇是混凝土為主體工程的水利水電工程施工組織設計中的重要環,料場選擇受到多種條件的約,影響因素很多。
  2. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河水電站的設計方案,對水輪機調系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編了源程序進行計算機模擬計算。
  3. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘工程,開展溫度應力及溫度控研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,約工程費用。
  4. ( 5 ) rock mass stability analysis on dam abutment of xia luo - yu damsite as follows : in left dam abutment, sideslip control structure has been relatively integrate, and low dip angle jointing did n ' t develop, so integrate sliding deformation control structure could n ' t been formed in three - dimensional space and rock mass stability could n ' t been influenced badly ; in right dam abutment, indicate rock mass distortion was caused by the rock mass mechanics condition, such as specific rock mass structure, compression stress concentrate with high strength and especial landform and so on

    ( 5 )對下落魚肩巖體穩定問題的分析得出:左肩巖體雖然具有相對較完整的側滑控結構,但由於緩傾角理不發育,故在三維空間上不能形成完整的滑移變形控結構,亦不會對肩巖體穩定性產生嚴重影響:右肩巖體復雜變形,是在特定的巖體結構、高強度的壓應力集中及特殊的地形等不可或缺的巖體力學條件下產生的。
  5. Therefore the impervious face - slab set on upstream face of dam is a key to seepage control of rcc dams. and the value of impervious face - slab is showed by the impervious effect

    因此在碾壓混凝土上游設置防滲面板是控碾壓混凝土滲漏的一個關鍵環,而防滲效果則是防滲面板的價值所在。
  6. Simultaneously, the quality control method for the compaction, the construction technologies and measures and the roller - compacted parameters are studied and optimized, in this way the investment is saved at last

    同時,訂了壓實質量控方法,研究和改進了填築的施工工藝和措施,優化了大體型及施工碾壓參數,約了投資。
  7. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖段碾壓混凝土溫度控標準,介紹景洪水電站縱向圍堰高溫季碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。
分享友人