節漿器 的英文怎麼說

中文拼音 [jiéjiāng]
節漿器 英文
pulsaver
  • : 節構詞成分。
  • 漿 : 漿同「糨」
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Abstract : being aimed at the recovery system of ethanol pulping, and based on the techniques requirement of recovery processing and energy - savin g expectation, two kinds of flash tank, directed and turbine based, are designe d in this paper

    文摘:針對乙醇法制漿的藥液回收系統,根據制漿回收工藝和能要求,研究設計了直接式和渦輪式兩種閃蒸
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. One - step synthesization made the electrical properties more stable, controling the reducing sintering temperature and retention time can adjust the electrical properties in a certain scope, changing the oxidation temperature made the varistor ’ s voltage v10ma changed, using the special double - layer silver plasm can eliminate the voltage - direction problem

    一次配料得到的樣品電性能一致性更好;控制還原氣氛燒結溫度和保溫時間,可以在一定范圍內調鈦酸鍶壓敏電阻的電性能,改變氧化溫度可以獲得不同的壓敏電壓,從而得到系列化產品;採用雙層銀漿工藝成功消除了壓敏電壓的方向性問題。
分享友人