築井 的英文怎麼說

中文拼音 [jǐng]
築井 英文
chikui
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. For protective female worker healthy, law set the labor range that female worker prohibits be engaged in, unit of choose and employ persons must not arrange female worker to be engaged in the following these law prohibit the labor that female worker is engaged in : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise

    為了保護女職工的身體健康,法律規定了女職工禁止從事的勞動范圍,用人單位不得安排女職工從事以下這些法律禁止女職工從事的勞動: ( 1 )礦山下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在6次以上)每次負重超過20公斤,間斷負重每次負重超過25公斤的作業。
  2. The labor range that female worker contraindication undertakes includes : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise

    女職工禁忌從事的勞動范圍包括: ( 1 )礦山下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在六次以上)每次負重超過二十公斤,間斷負重每次負重超過二十五公斤的作業。
  3. The site of such an excavation, with its surface buildings, elevator shafts, and equipment

    礦山,礦場礦所在地及其地上建、升降通道和設備
  4. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建物在使用階段的沉降分析; 3 、建物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建物沉降影響分析; 7 、不同沉沖水對建物沉降影響分析; 8 、進深不同的土層沖水對建物沉降影響分析; 9 、不同埋深土體沖水對建物沉降影響分析。
  5. Also he built towers in the desert, and digged many wells : for he had much cattle, both in the low country, and in the plains : husbandmen also, and vine dressers in the mountains, and in carmel : for he loved husbandry

    代下26 : 10又在曠野與高原和平原、建望樓、挖了許多、因他的牲畜甚多又在山地和佳美之地、有農夫和修理葡萄園的人、因為他喜悅農事。
  6. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個鉆孔, 250個探,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建物進行結構狀況勘測。
  7. The buildings are made of burnt brick, with an elaborate system of sewers and wells.

    這些建物是用燒成的磚砌成的,有著精心建造的下水道和水
  8. Share the content of the area to include : path of elevator well, conduit well, stair well, rubbish, change between electric room, equipment, communal hallway, corridor, basement, be on duty gatehouse, and what serve for whole is communal the floor area that uses a room with room and management, with the level umbriferous area is calculated

    共有面積的內容包括:電梯、管道、樓梯間、垃圾道、變電室、設備間、公共門廳、過道、地下室、值班警衛室等,以及為整幢服務的公共用房和治理用房的建面積,以水平投影面積計算。
  9. The armor plate is a product of no cutting bits, holding the advantages that being high usingrate, firmintensity, slippery proof, easy to fix, durability and breezy, ectc. it can be used as motoway partition, air field runway and used for mine, dock, working platformand so on

    篩網作為一種無切屑產品,其鋼板利用率高,強度牢固,具有防滑、通風性能好、施工方便、經久耐用等優點;用於高速公路建、大型飛機楊跑道、礦、碼頭、工作平臺、隔離等。
  10. Arcade - house streets should be refreshed and rejuvenated. we should lay out their actuality and charm in the point of view of protective planning, architectural history, civic culture, and the vicissitude of marketplace

    對騎樓這一獨特嶺南建從建歷史、市西安建科技大學碩士學位論文文化、商埠風雲、頰嚨日保護等角度,多層次多方面地展現它的現狀和魅力。
  11. Suitable for the fireproofing of the skyscraper, can be suitable for such obscure steel construction in industry and civil building as the theatre, petrochemical industry, garage, oil drilling platform and large span factory building, etc., coating plays a firing prevention and protecting role on the surface, improve the fire endurance to reach the specification of modern fire protection design

    適用於高層建的防火,也可適用於影劇院、石油化工、汽車庫、鉆平臺和大跨度廠房等工業與民用建中的隱蔽鋼結構,塗覆于表面起防火保護作用,提高耐火極限達到現代防火設計的技術要求。
  12. Main product of this company includes more than 200 varieties and more than series such as mine shaft hoisting machine series, mine hoist series, dispatch hoist series, prop - pulling hoist series, building hoist series, flight conveyor series, heavy - load gear reducer series and electric equipment

    公司主要產品有:礦提升機系列,礦用提升絞車系列,調度、回柱絞車系列,建卷揚機系列,刮板輸送機系列,重載減速機系列,電氣控制設備等十幾個系列近200多個規格品種的產品。
  13. Abstract : through analysing systematically the conditions of engineerin g geology and hydrogeology, the regimes of groundwater level and data of deep wells, the p aleorelief, and the groundwater levels measured during the periods of foundation investigation of each existing building, the aberrant cause of groundwater level at yangfangdian and its vicinity was derived, and the approximate scope of grou ndwater level anomalies in the above - mentioned area in march, 1999 was obtained by calculation

    文摘:該文全面系統地分析了羊坊店及其附近地區的工程地質和水文地質條件、地下水位動態、深資料、古地形及現有建勘探時實測水位資料,指出了羊坊店及其附近地區地下水位異常的原因,並通過計算得出了1999年3月份該地區地下水位異常的大致范圍。
  14. He also built towers in the desert and dug many cisterns, because he had much livestock in the foothills and in the plain

    10又在曠野與高原和平原,建望樓,挖了許多,因他的牲畜甚多。
  15. And he built towers in the wilderness and hewed out many cisterns, for he had much cattle, both in the lowlands and in the plain ; he had farmers and vinedressers in the hills and in the fruitful fields, for he loved the soil

    10又在曠野建望樓,挖了許多,因他在低陸與平原的牲畜甚多;又在山地和肥美之地,有農夫和修理葡萄園的人,因為他喜愛農事。
  16. And he put up towers in the waste land and made places for storing water, for he had much cattle, in the low hills and in the table land ; and he had farmers and vine - keepers in the mountains and in the fertile land, for he was a lover of farming

    又在曠野與高原和平原、建望樓、挖了許多、因他的牲畜甚多又在山地和佳美之地、有農夫和修理葡萄園的人、因為他喜悅農事。
  17. [ bbe ] and he put up towers in the waste land and made places for storing water, for he had much cattle, in the low hills and in the table land ; and he had farmers and vine - keepers in the mountains and in the fertile land, for he was a lover of farming

    又在曠野與高原和平原、建望樓、挖了許多、因他的牲畜甚多又在山地和佳美之地、有農夫和修理葡萄園的人、因為他喜悅農事。
  18. The origin, definition and the eaves rafter of small yards were expounded in this paper, and the forms, function and concepts of small yards in the traditional local - style dwelling houses were compared and analyzed in detail, so as to give some enlightenment to the layout of architectural space

    摘要闡述了天的源起、天的界定及天的檐椽,並著重橫向比較分析了傳統民居中天的形式、功能及理念,以期能對今後建空間的規劃設計有所啟示。
  19. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉充填、錨體澆、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  20. Experience of sunk well construction in the basis of basement

    高層建地下室基礎沉施工經驗淺談
分享友人