築堤 的英文怎麼說

中文拼音 []
築堤 英文
fill; embank; banking; dike; construct a dam
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. Foresters gathered 822, 000 cubic feet of lumber for use in building the road. one million board feet of lumber and 2400 pilings were used in a causeway over the swamp

    伐木工砍伐了用於路的62 . 5萬立方米的木材。橫越沼澤地的一個道用了1百萬板英尺[ 1 ]的木材和2400根立樁。
  2. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪水,對庫區周邊環境的影響較大,因打壩築堤縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周邊灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。
  3. It played an important part in masses motivation, money collection, flood - prevention and irrigation - dispute mediation

    它在動員群眾修築堤圍、籌集資金、防汛搶險、調解水利糾紛等方面,始終扮演了較為重要的角色。
  4. In the early periods, the objective of the river management is to constraint the braid river in a main channel by using construction of dikes. by control the flood could prevent from river banks flowing away

    早期河川治理,以築堤御洪為主,其主要目標在於整理網狀亂流,束范于河槽中,防止沿岸土地浸淹崩坍及流失,達到防災減災的目的。
  5. We have banked up the river to prevent flooding

    我們已沿河築堤以防河水泛濫。
  6. Centuries of silt deposition and diking has caused the river to flow above the surrounding farmland, making flooding a critically dangerous problem

    幾世紀的淤泥沉積以及築堤導致了河水六向周圍的農田,造成洪水泛濫的嚴重後果。
  7. The last need of maslow is self actualization ; winning, achieving, realizing self potential

    Ortega公路沖向築堤,斷了雙腿。
  8. A hollow metal cylinder used especially in constructing dams and foundations

    金屬筐一種尤其用於築堤及防禦工事的中空的金屬筐
  9. The train was traveling from london to scotland when it derailed friday night, spilling cars down an embankment

    星期五晚上該列車是從倫敦開往蘇格蘭的途中突然出軌,撞到築堤的車的。
  10. It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth - fill embankment dam

    還要考慮到可能的備選方案,比如是選擇混凝土重力壩還是選擇填土築堤大壩。
  11. Levees are needed in floodplains, where soils tend to be wet and can change every 100 yards along a proposed route

    ?濫平原需要海,因為這里的土壤通常相當濕潤,同時築堤預定路線上的土質往往每隔100公尺就不一樣。
  12. The upper reservoir had a concrete dam 400 ft. long and 138 ft. high with a storage of 175, 000, 000 gallons. the dam of the lower reservoir was modified and reconstructed from that of the former tai shing paper manufacturing co.

    建成後分上、下兩個水塘,上塘是用混凝土築堤壩,壩長400尺,高138尺,存水量為1
  13. The sky defies control, and information knows no bounds. in this era of internet, national borders or checkpoints can do nothing to stop the flow of information, though they can bar the entry of humans

    天空關不住,資訊滿天飛,網際網路鋪天蓋地的時代,國門和關卡,或許能擋得住人,卻無法封得了消息,與其築堤防洪,不如疏導流向。
  14. The soil erosion is effectively prevented from the project construction of the water conveyance project for dahuofang reservoir by taking both the project of high way reform and the river traning project as the key points ; in which the measures to prevent the soil erosion are made for the spoils piled up with different types in all the spoil areas therein, and then the spoil is used to build high way and dike concerned as well

    摘要大夥房水庫輸水工程以公路改造和河道規劃整治項目為著手點,利用渣料修路築堤;根據各渣場堆放形式的不同而採取不同的防治措施,可有效地防止工程施工可能造成的水土流失。
  15. Bank is an important part in chinese system of controlling flood. it has accumulated much experience in the choice of bank ' s material, division of bank ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on

    防是我國防洪工程體系的重要組成部分,在築堤材料、體分區、體穩定、滲流、沉降及應力應變分析、基礎處理、填標準、施工機具等一系列關鍵技術上,已經積累了豐富的經驗。
  16. This paper presents a method of probability analysis in order to develop the general design and analysis methods for problems of the embankment stability under random storm wave actions as well as with random properties of the embankment medium. the major purpose of this study is carry out modellings of ( 1 ) probability analysis for the problem of seepage stability of levee projects ; ( 2 ) probability analysis for the problem of erosion due to washout sediments from the embankment ; ( 3 ) numerical analysis for coastal evolution due to beach erosion under energy actions of storm wave

    本文根據598084號年浙江省自然科學基金項目和g59901號國家教育部回國留學人員科研啟動基金項目的部分研究目標和研究內容的要求應用概率分析方法研究了在隨機風浪荷載作用下和築堤材料隨機性影響下防護壩抗滲流、抗沖刷穩定性的分析計算模型;用數值分析方法研究了在浪潮能量作用下岸灘侵蝕造成海岸演變問題的數學分析模型。
  17. Article 26 no excavation of sand, dike and dam construction, dumping of rubbish, reduction or expansion of river - beds, or demolition operations may be carried out within 200m either upstream or downstream of large highway bridges and highway ferries

    第二十六條不得在大型公路橋梁和公路渡口的上、下游各二百米范圍內採挖沙石、修築堤壩、傾倒拉圾、壓縮或者擴寬河床、進行爆破作業。
  18. The west dam faced the inner sea of rocky harbour and was 2, 470 ft. long and 333 ft. high. the construction of the 2 dams was a complicated process, as 2 cofferdams had to be constructed at each of the sites, before the main dams could be built. these were to keep the dam sites dry for construction

    兩條主壩建工程相當復雜,在興建主壩之前,需于建築堤壩地點建造圍堰,將海水隔開,抽乾海床范圍內的海水,挖除黏土和沙,才築堤壩,使主壩能穩固地建造在堅硬的巖石上。
  19. Though the danube has been damaged by human activity, through dam - building and unsustainable land - use ; pollution from instudy and agriculture, her natural enviroment was in general better preserved than in many parts of western europe

    盡管築堤建壩,不可持續的土地使用、工農業污染等人類活動已經破壞了多瑙河的自然環境還是得到了較好的保護。
  20. Building of dams, narrowing or widening of river beds for the purpose of rescue operations and flood prevention in the areas mentioned in the preceding paragraph should get prior approval from transportation depattments of the people ' s governments of respective provinces, autonomous regions and municipalities and related water resources administrative departments, and effective measures should be carried out to protect the related roads, road bridges, road tunnels and road ferries

    在前款范圍內因搶險、防汛需要修築堤壩、壓縮或者拓寬河床的,應當事先報經自治區、直轄市人民政府交通主管部門會同水行政主管部門批準,並採取有效的保護有關的公路、公路橋梁、公路隧道、公路渡口安全的措施。
分享友人