築墩 的英文怎麼說

中文拼音 [dūn]
築墩 英文
zhudun
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  1. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某水閘工程在施工過程中擋墻及邊產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建物的危害程度,提出了相應的控制措施,較好地保證水閘正常運行的功能。
  2. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  3. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿拱支承結構的縱槽向地震效應較小;吊桿式拱架結構動力特性取決于槽和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建高度和重心,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  4. Thermal stress of pak phanang barrage pier

    巴帕南水閘閘整體澆溫度應力研究
  5. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋基礎的施工方法,對水深不超過四米的橋基礎,採用填土島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋,採用浮式平臺。
  6. The straight transverse axis shall be parallel with the present crooked jianshe avenue ( qingnian road - hanxi section ), connect to nanniwan avenue in the west and form the along - river traffic system parallel to yangtze river and hanjiang river ; the road shall pass through the core of wangjiadun cbd, connect with entry and exit of subway station, underground parking lot and basements of high - rise buildings, to form the comprehensive underground space ; the road section close to hanxi shall be connected to the tunnel of nanniwan avenue via through cut, therefore integrating the western residential zone in space

    橫軸對建設大道(青年路-漢西段)裁彎取直,西與南泥灣大道相接,形成與長江、漢水平行的順江交通系統;該道路貫穿王家商務核心區,與地鐵出入站、地下停車庫以及高層建地下層相銜接,形成綜合地下空間;靠近漢西路段以路塹形式與南泥灣大道隧道相接,在空間上使西部居住區形成整體。
  7. A series of arches supported by columns, piers, or pillars

    拱形建物由柱、橋或臺柱支撐的一系列拱
  8. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘採用的島、下沉混凝土圍堰施工方案,以及54 ~ 58號深水水中採用的雙壁鋼結構圍堰施工方案。
  9. The plan of wangjiadun district will give prominence to the development theme of ecology and humanity, and combine with the low spatial density construction of the city to arrange centralized landscaped water area at south of wangjiadun district, and connect it with yangtze river and hanjiang river to form a large open public place with ecological function ; the dregs of future construction will be piled up to form massifs at north wangjiadun district to create a classic “ south of hill and north of water ” urban image of business district

    王家地區的規劃突出生態和人文的發展主題,結合城市低密度空間建設,在王家地區南部布置集中綠化水面,與長江、漢江相連接,形成具有生態效用的大型公共開敞空間;利用現狀建渣土在王家北部堆山丘,營造商務區「山南水北」的經典城市意向。
  10. Systemic analyses of the practical engineering have been done. the engineering measures including post - pouring belt, part pier pouring with lock floor at one time and pipe cooling is been thoroughly studied. by applying these measures, the stresses in the concrete change

    針對實際工程混凝土施工需要,著重研究了后澆帶、部分墻和底板同時澆和布置冷卻水管三種工程措施所帶來的混凝土應力的變化情況。
  11. Conceivably the mound - building indians believed their resurrection would coincide with some such liberation, and built their graves in imitation of the low moraines deposited by the departing glaciers

    可以想象,擅長構的印第安人相信人的死而復生會與某種類似的釋放同時發生,所以他們在建造墓塋時模仿離去的冰川積下的低矮冰磧。
  12. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。
  13. The prestressed concrete floodgate pillar may simplify the structure of buildings, to shorten the use of steel largely and to make the construction conveniently, therefore it is used more and more popularly

    摘要預應力混凝土閘可以簡化建物結構、節省大量鋼筋和方便施工,因此被越來越多地採用。
  14. Invested by dongguan grand view hotel co., ltd., grand view hotel is established according to international five - star hotel standard, it is now unquestionably one of the finest hotels in dongguan for business and leisure travelers, as well as the venue of choice for important events and celebrations

    匯景酒店是由東莞市匯景酒店有限公司按國際五星級標準投資興建的商務度假型酒店,佔地120餘畝,總建面積54800平方米,位於洪梅道?望牛交匯處,交通十分便利。