築壩填料 的英文怎麼說

中文拼音 [tiánliào]
築壩填料 英文
filling material for dam
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  1. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材防滲和凍脹特性、與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石的成功記錄,解決了一系列國內外均無先例的難題。
  2. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照所用材,可以把稱為混凝土、堆石,水力沖等等。
  3. It has accumulated much experience in the choice of earth rockfill dam ' s material, division of dam ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on

    在土石體分區,體穩定,滲流,沉降及應力應變分析,基礎處理,標準,施工機具等一系列關鍵技術上,已經積累了豐富的經驗。
  4. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡混凝土面板堆石開采爆破試驗
  5. ( 2 ) combined with engineering practice of shuicheng reservoir, and use the value engineering technology to analyze the technological and economical benefit of the mining technology of its rock - fill material. this is the first time the value engineering was used in the construction of the medium - sized hydraulic engineering in yunnan province, and has gained great success

    ( 2 )結合水城水庫工程實踐,用價值工程技術經濟分析方法對水四川大學工程碩十學位論文城水庫大堆石開采工藝進行價值分析,這在雲南省的中型水利工程施工中是有首次,並且取得了巨大成功。
  6. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石建設中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用邊墻施工法,在每一層墊層之前,用擠壓式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計鋪,用振動碾平面碾壓,合格后重復以上工序。
  7. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大施工竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大安全設計及防滲墻墻體材的選擇提供了理論依據。
  8. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石摻合的最大幹密度受反濾與粘土的摻合比例、反濾含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合的實際壓實度。
  9. The gravelly soil is a better kind of damming material. it ' s usually used as impervious core and also as dam shell

    礫質上是一種良好的,既能作防滲材,又能殼。
  10. Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction

    摘要盤石頭水庫面板堆石,在筑前進行了大型碾壓試驗,復核設計壓實標準,確定各區參數,供體施工採用。
  11. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通過對下游石渣的兩個源進行生產性碾壓試驗, ?解分析其壓實特性,核實設計標準的合理性,推薦達到標準的經濟合理的壓實方法、機械類型、施工參數等。
  12. Based on the roller - compacted test, check on construction and observation during operation, the fill - criteria of the design for the dam is obtained, and then the economic and reasonable roller compacted method, including selection of the roller, mechanical parameters, watering amount for material of sandy gravel etc., is determined as well

    摘要通過碾壓試驗、施工復核及大運行觀測,得到了大的設計標準,從而確定了經濟合理的壓實方法,包括壓實機械選型、機械參數、砂礫加水量等。
  13. According to plentiful of experimentation, some new build techniques are created, for example the technique of no watering fill in winter, the technique of prevent frostbite and crack of faceplate etc. these techniques were proved by the project of lianhua cfrd. at last this paper gives some conclusion

    而且根據地區特點,進行了大量的實驗,給出了以往一般面板所未遇到過的施工工藝,如冬季堆石體不灑水、面板的防凍抗裂、體渡汛措施等以及採用新的爆破方法開採石等新的施工工藝。
  14. ( 3 ) the statistics model is employed to press and analyze the date, which were collected through the security field monitoring, to the stress and deformation of the med, and then these results were compared with fem results, of the med before it was banked to 140m. ( 4 ) the stress and deformation prediction the med has been made both while the dam has been built height of 185m and after the reservoir is full of water

    ( 3 )茅坪溪防護大至140米高程時應力和變形安全監測資分析:使用統計模型對應力和變形安全監測獲取的應力和變形資進行數據處理和分析,並與茅坪溪防護大140米高程以下施工情況下的應力和變形的分析計算結果作出比較。
  15. Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment

    文摘:蓮花面板堆石施工中,注意對源做出符合工程實際情況的規劃:利用其他建物的開挖降低造價;採用分區的措施,加快施工進度和解決寒冷季節施工問題;方便的上交通道路網和良好的路面,為高強度提供有力保證;選擇合理配套的施工設備使設備得到優化利用。
  16. The study consists of construction technologies of rock - fill filling of concrete facing rock - fill dam in negative temperature condition, manufacture and fill of cushion layger, exceedingly frost - resisting property of concrete facing and the protection of concrete facing in winter etc. these technologies have been come up to advanced domestic standards and some gaps in the fields of same technology has been filled in

    這些技術包括砼面板堆石在負溫條件下體堆石及墊層的制備與技術、高抗凍性面板砼技術、面板砼的越冬防護技術等。
  17. ( 4 ) through the constant application of value engineering, make the merit maximization as the direction of construction, and ' then productivity of rock - fill material constantly increased, therefore construction schedule of embankment filling were quickened and the engineering construction were completed 120 days before the limited time

    ( 4 )應用價值工程,以功能價值最大的項目作為改進方向,隨著價值工程的不斷深入,價值的不斷提高,堆石的生產率也不斷上升,加快了大施工進度,使得整個主工程施工工期提前了120天。
  18. Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper

    如在混凝土面板的抗凍耐久性、墊層材防滲和凍脹特性、與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石均有其獨特之處。