米堤 的英文怎麼說

中文拼音 []
米堤 英文
misty
  • : Ⅰ名詞1. (稻米) rice 2. (泛指去殼或皮的可吃的種子) shelled or husked seed 3. (姓氏) a surname Ⅱ量詞(公制長度的主單位) metre
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. Foresters gathered 822, 000 cubic feet of lumber for use in building the road. one million board feet of lumber and 2400 pilings were used in a causeway over the swamp

    伐木工砍伐了用於築路的62 . 5萬立方的木材。橫越沼澤地的一個道用了1百萬板英尺[ 1 ]的木材和2400根立樁。
  2. We have effectively killed smooth cordgrass ( spartina alteriflora ) outside the qingjiao dyke of haicang by using selective herbicide on 15th, july, 2005

    摘要2005年7月15日對廈門海滄青礁海外的互花草進行藥物殺除,試驗選用的除草劑對互花草的殺除有效。
  3. Slow as a sea turtle on land, the 208 - foot - high [ 63. 4 - meter - high ] cape hatteras lighthouse was rolled to its new home, a half mile [ 0. 8 kilometers ] from the beach, at a top speed of one foot [ 30. 5 centimeters ] a minute

    高208英尺(約63 . 4)的海持拉斯角燈塔,原來的聳立處在大地震及颶風( 40 )的侵襲中已被蝕淹,倖存的它便如一隻緩慢匍匐于岸的海龜般搬遷至半英里(約0 . 8海里)以外的海灘上。
  4. Reclamation and associated construction of a 970m long seawall

    填海及興建相關的一條970長的海
  5. Limited reclamation and associated construction of 310m long seawall

    填海及興建相關的一條310長的海
  6. The requirement of stability is easily reached, due to the design height of embankment is several meter

    由幹路設計高度一般只有幾,穩定條件較易滿足。
  7. Article 26 no excavation of sand, dike and dam construction, dumping of rubbish, reduction or expansion of river - beds, or demolition operations may be carried out within 200m either upstream or downstream of large highway bridges and highway ferries

    第二十六條不得在大型公路橋梁和公路渡口的上、下游各二百范圍內採挖沙石、修築壩、傾倒拉圾、壓縮或者擴寬河床、進行爆破作業。
  8. During the research period, by combining theory analysis with engineering practice, the field tests in three sections with high rock - filled embankments, which are over 30m hig h, are put over. through the tests, plenty of valuable field data are obtained which will be helpful in the highway constructions in western china in the future

    此外,本文結合理論分析與工程實踐,成功地完成了三段高達30餘的高填石路的現場試驗路,通過周密系統的分層沉降觀測和分類現場檢測,取得了豐富的現場資料,為今後西部高等級公路建設積累了寶貴的經驗和數據。
  9. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構海的地基在主水平基準面以下約5,沿海挖掘沉管隧道坑道至主水平基準面以下30會削弱這些海
  10. By the time the spur line is able to come down from an elevated structure to ground level, the railway has already cleared long valley. " moreover, construction of a 2 - metre high wall on both sides of the tracks to protect the railway tunnel from flooding risk in this low - lying area would become a big visual intrusion

    此外, ?原是一個低洼地帶,如果在該處興建隧道,必須在隧道兩旁加建兩高的基,以確保隧道不受水浸影響,然而,這會對景觀造成更大影響。
  11. Finally embankment broke, floods washed away villages and roads covered by water, 1 m deep, it can be the road rowing

    最後岸破了,洪水沖走村莊,道路被水覆蓋,有一深,人們可以在路上劃船。
  12. Under the port and airport development strategy study completed in 1989, a 4. 5 km long breakwater to the west of lamma was proposed, mainly intended to provide protection to the proposed lantau port

    1989年完成的港口及機場發展策略研究,建議在南丫島西岸興建長4 . 5的防波,主要作用是為擬議的大嶼山港口提供屏障。
  13. Looking like a rainbow, the 17 - arch bridge is eight metres wide and 150 metres long and links the east causeway with the nanhu island on kunming lake

    連接昆明湖東和南湖島的十七孔橋,長一百五十,寬八,形若長虹。
分享友人