粘土地面 的英文怎麼說

中文拼音 [niándemiàn]
粘土地面 英文
clay floor
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Frame columns inset the filler - wall, avoided the influence that the comer of the room columns outstanding to indoorses view and take up the using space. at the same time, this structure has some advantages as the frame structure, such as arranging neatly, comparting easily etc., deeply welcoming by inhabitant and real estates company, is a building structure system that have the vast development foreground and satisfying the request of green building ". current, the reinforced concrete special - shaped columns structu re system lacks the actual measuring data of earthquake damage and the comprehensive aseismic performance of structure system, the structure system not yet is included in the national code, needing the thorough research

    鋼筋混凝異型柱結構體系,採用t形、 l形、十形截柱代替傳統的矩形截柱,以輕質材料製作的框架填充墻代替自重較大的磚填充墻;框架柱隱于墻內,避免了屋角柱楞突出對室內觀瞻及佔用空間的影響,同時,又具有框架結構布置靈活、易於分隔的優點,深受住戶及房產開發商的歡迎,是一種滿足「綠色建築」要求並具有廣闊發展前景的建築結構體系。
  2. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟厚度大、可能作為樁基持力層頂起伏變化大等復雜質條件,採取了多種先進的勘探手段(如高精度淺層震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  3. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與管徑的調配設計,增大環狀粒料層和止水層的厚度;濾水管外包尼龍紗網;粒料與止水接觸界上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類區人飲水井施工提供技術示範作用。
  4. As a special viscous soil, dilative soil causes many problems of ground and slope

    摘要膨脹作為一種特殊的引發了許多基與邊坡方的問題。
  5. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供水工程金湖泵站位於塘廈鎮東,屬低山、殘丘貌,高程22 60m ;泵站前池進水渠橫切山脊,連接原東深供水河,設計開挖1條長135m的進水渠,坡高50多米,邊坡質為強風化的粉砂質泥巖,網狀裂隙發育,結構基本與坡重合;坡體質中含有較多的礦物,具有遇水軟化的特性。
  6. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行鉆孔竣工時間預估及下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石鉆頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石鉆頭和深基坑支護方案綜合評價中的應用。
  7. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、質情況復雜,表層淤泥質及松軟層較厚,基巖頂起伏較大,且存在斷裂構造,層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形下連續墻結構,並獲得成功。
  8. On the paas - normalized plots, the parent granite and the granite weathering crust are enriched in lree without ce anomaly. while the groundwaters are also enriched in lree, they display significant negative ce anomaly, indicating the fractionation of ce during water - rock interaction. based on the study of two profiles of granitoid weathering crust, we concluded that ree concentrations in the groundwaters from the granitoid weathering crust are likely related to the continued chemical weathering, as well as the ree concentrations in the crust near the water table, clay concentration and the wate r ph values

    下水與母巖、風化殼稀的paas標準化分佈模式基本相似,呈lree富集型,母巖中無ce異常,而水樣中有ce負異常,表明ce在水巖作用過程中發生明顯的分異;通過研究兩個典型花崗巖風化殼剖發現,下水的稀含量與連續的化學風化,以及水位附近剖上的稀含量、礦物含量以及水的ph值等有關。
  9. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對心墻和壩基垂直防滲方案、瀝青混凝心墻和壩基垂直防滲方案以及斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  10. There are many main buildings in the plant such as concrete - faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc

    電站的主要建築物有砼板堆石壩、心墻二壩、溢洪道、引水隧洞、調壓井、廠房和開關站等。
  11. Deeplying cohesive soil ; land subsidence ; consolidation law ; consolidation parameter

    深層沉降固結規律固結系數
  12. According to the feature of adamicearth, s engineering geology and calculation of engineering design, the chief problems about traditional calculation method in the earth pressure are studied refering to cantilever - type retaining pile in excavation engineering, and the calculation methods and specific advices are posed

    摘要根據紅工程質的特點及工程設計計算,針對基坑工程中懸臂支護樁採用傳統計算方法在壓力計算方所存在的主要問題進行分析研究,並提出了具體處理意見和計算方法。
  13. On the basis of the monitoring results of land subsidence and calculation of deep groundwater resources by using water balance method, it is shown that the leakage recharge from its upper shallow groundwater account for approximately 38. 2 %, drainage of the clay layers, about 41. 3 %, water release from the aquifers, around 5. 6 % and lateral inflow, some 14. 9 %, of the total groundwater resources

    摘要根據天津平原沉降監測結果,採用水量均衡法,計算出深層下水開采量中,淺層下水越流補給量佔38 . 2 % ,性壓密釋水量佔41 . 3 % ,彈性釋水量佔5 . 6 % ,側向流入量佔14 . 9 % 。
  14. In this paper, the numerical techniques and computational methods for limit analyses and shakedown analyses of soil structures and foundations are systematically investigated and then are employed to the assessment of the safety of the non - homogeneous foundations and the offshore platform foundations. in this dissertation, the computational method which combines elasto - plastic analysis with melan ' s theorem is developed and then applied to evaluate limit load and shakedown load of soil structures. elasto - plastic analyses are performed to obtain elasto - plastic stress field and elastic stress field

    在巖工程領域,飽和的安定現象與飽和砂的液化早已為人所知,但是安定性理論及其分析在工程實際中並沒用受到足夠的重視,在這方的探索研究也極為有限,這與體穩定性評價中廣泛應用極限分析方法極不協調,而在海洋平臺基等實際工程中安定性問題又顯得十分重要。
  15. In this thesis, one - dimensional nonlinear consolidation behavior of saturated soft soil is studied in detail through a great mount of typical numerical examples and many consolidation curves are prepared, from which, the behavior of one - dimensional nonlinear consolidation of soft soil is illustrated

    本文在前人工作的基礎上,對飽和軟基的一維非線性固結性狀進行了更全細致的研究與分析,並繪制了大量固結計算曲線。
  16. The analysis of grain size of later pleistocene loess covering on the northern slop of tian shan mountains and ili basin shows that the tian shan loess is composed mainly of silt, accounting for 60 - 70 %, and some clay, accounting for 15 - 20 %

    摘要天山北坡和伊犁盆晚更新世典型黃粒度分析表明,天山黃以粉砂為主,佔60 - 70 %左右,粒含量一般在15 - 20 %之間。
  17. It result in water level rising, hypo - salinification aggravating, sediment silting up, the lake atrophy, marsh extending and nature disaster such as droughu waterlog ^ salinification occurring frequently. completely analysis to geology and hydrology conditions of the district along yellow river in shandong has been applied in this paper and aquifer ' s hydrological characteristic and subsurface flow ' s characteristic have been analysed as keystone in the paper. after finding out the distribution rule and formation conditions of the shallow layer " s ground water resource, divide the district into three hydrological sections according to hydrological conditions and subsurface flow characteristic

    本文對山東沿黃質、水文質條件進行了全系統的分析,並重點分析了區內含水層的水文質特徵及下水運動特徵,進一步查明了淺層下水資源的形成條件和分佈規律,根據水文質條件及下水運動特徵,劃分出三個水文質區,劃分並論證了裂隙含水層的形成及供水意義;確定了科學的水文、水文質參數,為準確計算淺層下水資源奠定了可靠的基礎;根據淺層下水資源形成特點,建立了下水均衡方程式,據此,計算了區內淺層下水資源及淺層下水可采資源。
  18. ( 3 ) the forming wrapping structure because of interlayer between silt and clay at the transition part from the fourth layer to the fifth layer in the sediments section. according to this, intense change of the geoenvironment in this area at the period of filling up of the ancient barrier lake is presumed

    ( 3 )通過在沉積物剖的第四層到第五層過渡的部位可以看到粉砂層和層相互滲透而形成的包卷構造,推測古堰塞湖淤積時期內該區域的質環境發生了重大改變。
  19. The impact of deeplying cohesive soil on subsidence in tianjin is presented in this paper. based on the analysis of the consolidation law of deeplying cohesive soil, the pore configuration, and the movement of pore water, the mechanism of the consolidation of hard cohesive soil is discussed. finally, the consolidation parameters, resulting from consolidation cycles, are applied in the calculation of settling volume and the degree of forecast accuracy is satisfactory

    闡述了天津市深層沉降的影響,分析了深層的固結規律。通過研究孔隙結構和孔隙水運移特徵,探討了堅硬的固結變形機理。選取由固結旋迴法得到的固結參數對深層引起的沉降量進行了計算,獲得了較好的預測精度。
  20. Discussions were first made on the mechanism of vibro - replacement crushed stone columns for different types of soils and then, based on the experience on a practical project, methods for building vibro - replacement crushed stone columns for improvement of soft soils and methods for testing to verify the improvement effect of the vibro - replacement crushed stone columns were also discussed

    摘要首先對振沖碎石樁法在不同基中的加固機理進行了闡述;然後,以實際工程為依託,對應用振沖碎石樁法處理高液限軟基的施工、加固效果檢測等方的問題進行了討論。
分享友人