粘土沙 的英文怎麼說

中文拼音 [niánshā]
粘土沙 英文
dirty sand
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  • : 沙動詞[方言] (搖動以清除雜物) shake
  1. Consolidation settlement occurs mainly in clays or silts.

    壓縮沉降主要出現在或粉中。
  2. Detritus usually consists of gravel, sand and clay.

    巖屑通常是由砂礫,組成的。
  3. The central plain, which is broken in places by low hills, is extensively covered with glacial deposits of clay and sand

    被低矮的丘陵分割的中心的平原覆蓋著冰河時期留下的子的堆積物。
  4. During play on clay, and even hard courts, dirt and grit lodged between the strings can increase friction

    當在地打球時,或者硬地球場,臟的細粒會留在拍子上增加球線間的摩擦。
  5. The main results are following : ( 1 ) the variation of clay / silt ratio can indicate the secondary clay action of dust depositions ; the variations of magnetic susceptibility and total fe content are inferred to be records of the changeable intensity of bio - pedogenesis ; the variations of sr content and rb / sr ratio can indicate bio - pedogenesis, dissolving and leaching action ; the content of total organic carbon ( toc ) can reflect variation of climate and vegetation during soil formation, it indicates the intensity of weathering and bio - pedogenesis ; the content variation of caco3 can show the intensity of dissolving - leaching action and secondary deposit, which was noted as pseudomycilia in pores and fissures in the sediment, so it can indicate the intensity bio - pedogenesis quite well. these proxy indexes also reflect obvious regional difference of pedogenic environment and the intensity bio - pedogenesis ; namely, secondary clay action, dissolving - leaching action and bio - pedogenesis are all much stronger in south than that in north

    實驗結果表明:粒粉比值能很好地指示粉塵堆積物的次生化作用;磁化率和全鐵很好地指示生物風化成壤作用; sr和rb sr比值能很好的指示生物風化成壤作用和淋溶作用;總有機碳( toc )含量的高低,在一定程度上反應了壤發育過程中氣候和植被狀況的變化,指示著成壤過程中腐殖質化的程度; caco3含量的變化,可以反映了黃壤形成時的風化成壤作用的強弱程度,指示成壤過程中的淋溶作用和次生碳酸鹽化作用;並且各指標所指示的成壤環境和成壤強度存在明顯的區域差異,即渭河流域壤的生物風化成壤作用、次生化作用和淋溶作用均表現出南部強于北部。
  6. Because traffic flow greatly increases in recent years and the rank of actual driving load enhances, causing this bridge to be at the excess load the service condition, so in order to guarantee the bridge ' s transport security, the main body structure of the bridge should be reinforced

    摘要長市八一路跨線橋由於近年來交通流量大增,實際行車荷載等級提高,使得該橋處于超負荷的營運狀態,為了保證大橋營運安全,需要對此橋的主體結構進行加固,在選擇加固方案時對比了三種加固方法:鋼混凝組合結構加固方法、混凝結構擴大截面加固方法、鋼加固方法。
  7. Compared with straw - barriers or wooden barriers, clay - barriers may well be in favor of the settlement of plant species at first, in the long run, however, they will hold back the development of leymus secalimus population, so that it will take much longer time for the plant community to restore to its climax stage

    與草木障相比,粘土沙障設置初期可能有利於植物的定居;但是會對賴草種群的發育產生不良影響。所以,從長遠看來,粘土沙障不利於地植物群落的恢復。
  8. Channel deposits, consisting of sand, silt and clay, fill the valleys cut by a river system.

    河道沉積由砂,粉組成,充填于河流切割的河谷之中。
  9. The equipment gives pressure to both sides and makes use of industrial wastes, slags, flying ash , lime sand, fluvial sand and gangues with a little cement to produce the standard bricks, blind hole unburned bricks and clay - sintered bricks for all kinds of specification

    該設備雙面加壓,利用工業廢渣、礦渣、粉煤灰、石粉、子、煤矸石等原料加少量水泥製成各種規格的標磚、盲孔免燒磚、燒結磚。
  10. The bulk density was 1. 2 g cm - 1. the soil contents about 60 % of silts and about 15 % of clays. a slope adjustable flume of 3 by 8 m was subdivided into 15 mini - flumes of 0. 2 by 8 m

    壤顆粒以粉為主,粉粒占總量的60左右,粒約佔15左右,容重約為1 . 2gcm ~ ( - 1 ) ,試驗前將樣風干並過1 1cm的粗篩。
  11. At 12 week after inoculation, lymphoid follicles were especially conspicuous in the submucosa, and they were also found in the deep portion of the mucosa. at 24 week after inoculation infected mongolian gerbils could be found gastric ulcer, which often located near the transitional zone and their depth reached to the muscularis propria. in our study, we could not found intestinal metaplasis, atypical hyperplasia and adenocarcinoma

    Pylori灌喂之後各個時期的蒙古鼠的胃組織學研究之後發現,在感染的8周即可見到慢性炎癥性病變,而12周膜層和膜下層出現淋巴濾泡, 24周胃竇部可見到胃潰瘍,但住我們的實驗中並未發現有文獻報道的腸化生、胃腺癌等進一步的病變。
  12. You can add materials to clay to gain desired results, for example, you can add sand to prevent tiny breaks or lamieslines from forming in the finished product, but you should not use sand from the coldest severlcoastsof oceans

    你可以在內放入一些物質來達到預想的結果,比如,你可以增加子以防止在最後的成品中出現細小的裂紋或者細縫。
  13. In our study gastric histopathologic findings were confined to h. pylori - infected animals as detected by culture, histologic testing, and rut

    Pylori感染組和正常對照組蒙古鼠取胃膜進行h pylori形態學(塗片和細菌培養) 、 h
  14. The hydrothermal limestone breccia sheet presented over tertiary fluvial, lacustrive sandstone and mud in the wandongshan - wulipai area is a hydrothermal breccia landslide from the chenjiazhuang breccia pipe, and it may be a domain origin which would have obstructed the jinshajiang old channel and made the jinshajiang river to change and to form the famous valley and turns

    萬洞山五里排帶呈席狀覆蓋于第三系河湖相的砂礫巖和沉積之上的灰巖質熱水角礫巖為一套從陳家莊角礫巖筒滑覆過來的熱水角礫巖滑體,其可能是造成金江古河道淤塞並使古金江改道和形成大拐彎的主要原因。
  15. Based on the approximate estimation of wetted front edge of one dimension soil column, the design parameters of sdi were determined primarily

    濕潤鋒運移速度明顯慢于,特別是容重較大時更為明顯。
  16. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    結合黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形無結預應力鋼絞線和單圈有結預應力鋼絞線對排洞襯砌混凝施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝壓力管道結構管壁混凝的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝壓力管道理論計算方法的可行性。
  17. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排洞,擔負著泄洪、排、調節徑流和保證進水口不被泥淤堵的任務.根據排洞的水庫運用要求,灌漿帷幕下游排洞洞身段設計為混凝后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無結預應力系統,成為目前世界上規模最大的無結預應力隧洞襯砌工程,在國內尚屬首例
  18. You can add materials to clay to gain desired results. for example, you can add sand to prevent tiny breaks or lines from forming in the finished product

    你可以通過在裡添加其它材料來得到你想要的成果。比如,你可以增加子來預防微小的裂痕或在最後成形時添加條紋。
  19. Description : raindrops have splashed clay particles and organic matter into the furrows, further than the sand particles

    降雨沖刷使和有機物比粒更多的流入壟溝。
  20. Graves are a mix of gravels, clay and sand carried out by the river

    它混合著碎石、和河流帶來的子。
分享友人