的英文怎麼說

中文拼音 [suǒ]
英文
Ⅰ名詞1. (大繩子; 大鏈子) a large rope 2. (姓氏) a surname Ⅱ動詞1. (搜尋; 尋找) search 2. (要; 取) demand; ask; exact Ⅲ形容詞[書面語]1. (孤單) all alone; all by oneself 2. (沒有意味) dull; insipid

    ※中文詞彙在字典百科國語字典中的解釋。

    1. - similar to asm, active appearance models ( aam ) is also composed of two parts : the aam subspace model and the aam search

      -與主動形狀模型演算法類似,主動表面模型也由兩部分組成:子空間模型和搜過程。
    2. The police caught the man who tried to abduct the boy for ransom.

      警察抓住了那個企圖拐走這男孩以便勒贖金的傢伙。
    3. The preattentional bias of heroin abstainers under two - cues competition condition

      雙線競爭條件下海洛因戒除者的前注意偏向特性
    4. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

      本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,力檢測和結構溫度監測的方法。
    5. Three of them are british diplomats based in addis ababa, ethiopia ' s capital

      他們中的三人是英國駐衣比亞首都亞的斯亞貝巴的外交官。
    分享友人