終端負載 的英文怎麼說

中文拼音 [zhōngduānzǎi]
終端負載 英文
terminal load
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 終端 : terminal; terminus; terminator; tag end; end; termination; trailing end; end point; terminating終...
  • 負載 : [電學] load
  1. This paper is to propose an open synchronization framework based on agent. it can availably economize network band, cut transfers delay, lighten netword burthen by using sufficiency network computing resource, and access offline

    本文利用agent技術,建立了一個新同步復制系統模型,從而能夠有效地節省網路帶寬,縮短傳輸延遲並充分利用網路計算資源以減輕移動的計算,在網路斷接的情況下提供對數據的訪問。
  2. Many protective and monitoring functions are integrated in the system, such as earth - fault monitoring, short circuit protection, over - load protection, phase symm etry and phase loss monitoring, over voltage protection, under voltage protection, motor thermal monitoring and so on

    該系統能自動轉換控制方式,具有漏電、短路、過、斷相、欠壓、過壓等保護功能,並且能通過漢字顯示顯示各路荷的工作狀態和工作參數。
  3. Assuming the loop is known to be only a single straight segment of 26awg cable, there is no additive loop or afe noise, and the remote - end is terminated by a high - impedance load for all frequencies, figure 5 shows the resulting selt performance

    假定已知環路只有一個單個的直段26awg電纜,沒有附加的環路或者afe噪聲,對所有的頻率遠通過一個高祖抗止,圖5給出了selt的性能結果。
  4. This system uses the means of distributing control and concentrating management. the remote terminal ( rt ) controls electrical loads, meanwhile the power system processor ( psp ) controls the whole electrical system. this power distribution system realizes effectively load automatic management

    該系統採用分散式控制、集中式管理的策略,由各個遠程( rt )控制電氣,而由供電系統處理機( psp )責整個電氣系統的綜合控制,有效地實現了的自動化管理。
  5. But the contemporary p08 system uses a large amount of terminals and the distance between terminals is enlarged. as a result, the host overloads and the terminal has slow responsibility

    而現在的pos系統中, pos數量增加,距離增大,導致后臺主機過重,反應遲鈍,需要採用更為有效的系統集成方案。
  6. Asn : both electric utilities and end user are becoming increasingly concerned about the power quality. major reasons for the concern load equipment is more sensitive to power quality variations

    電業和用戶兩者變得越來越關心關于設備的品質,原因對電力品質變動是敏感的。
  7. So the equipment is schemed out to simulate the work - state of aepds, according to the in - out signals of every solid - state power controller ( sspc ) and the stochastic voltage and current of buses. the top - down design method is adopted in the design

    所以作者根據固態功率控制器輸入、輸出信號模擬多路,以及匯流條的電壓、電流等在飛機配電系統中的各種工作狀況,研製了「先進飛機配電自動測試裝置」 。
  8. The conventional connection circuit as the figure shows for two - wired transmitter : handhold terminal palm computer and external communication interface or mainframe communication circuit cannot directly bridges in the ends of power source. but may either meet on field ends a and b or meet on the ends of load resistance b and c. in the above - mentioned case, the circuit are supplied by power source

    對兩線制變送器來說,傳統的連接電路如圖所示:手持掌上電腦和外接通訊介面或主機通訊電路不能直接跨接在電源兩,但既可接于現場兩a , b上,也可接在電阻兩b , c ,兩種情況下,電路都要通過電源來供電, hart規范允許電阻為2301100 。
  9. A system design of the circulation function therapeutic instrument of brain is presented in this paper. an integrated prototype is composed of at89c55 used as system controlling module and a / d, d / a converter and liquid crystal display device used as a terminal display module to realize the output of dynamic load and permanent flow through digital synthesis

    本文提出了一種設計智能腦電治療儀的系統方案,以at89c55為核心控制模塊,輔以d / a 、 a / d成為全反饋閉環系統,使用液晶顯示器為顯示設備,實現數字合成動態恆流輸出。
  10. 2 for the first time, the author brings forward the concept of " pyramid horn high order mode resonator " and pml - fdtd technique is used to analyze the electromagnetic field distribution in the pyramid horn. the results show that the pyramid horn sensor is much more sensitive than the open ended waveguide or transmission line sensors. the sensor we used is a kind of resonance sensor

    二、首次提出了「角錐喇叭高次模諧振腔」的概念,並且採用pml ? fdtd法分析了角錐喇叭場分佈狀態,從而,得出了角錐喇叭探頭比開口波導或傳輸線探頭靈敏得多的原因在於:我們採用的探頭是諧振式探頭,消聲瓦樣品的差別相當于對角錐諧振腔的微擾;採用波導或同軸線探頭,消聲瓦樣品的差別相當于對傳輸線終端負載有一點變化而已。
  11. Numerical results are given to demonstrate the effects of several factors including the number of basis functions, the thickness of waveguide, the terminations of waveguide and different frequency on the radar cross section ( rcs ) of a slot array

    物理光學法用於有限電尺寸導體平板散射的分析。文中給出了縫隙陣列在不同頻率、基函數個數、波導厚度、終端負載等情況下的計算結果。
  12. Finally, in view of the absorbed po ~ ver of the terminated load and the realizablity of couplers, a proper eclectic distribution of coupling degree of couplers is computed synthetically. 2. a small, light, compact, ~ vide band and high performance h - t coupler with lognitudinal dualslot is presented

    根據天線方向圖要求,確定陣面的口徑分佈,在此基礎上,結合慢波線終端負載的吸收系數,以及耦合器耦合量的可實現性,綜合折中考慮,計算選擇出合適的耦合器耦合度分佈。
  13. Acting as the linkage between the transaction end systems and host, the front transaction host serves as application isolation, physical network isolation, message channel management and load balance. and then, the paper introduces xmp and xtp

    用前置機作為會員接入軟體交易與交易主機之間的橋梁,在三層客戶服務器模型中起到應用隔離、網路隔離、鏈路管理和均衡等功能。
  14. The working load balanced technology, realized involved the platform the real - time monitoring, as well as to mobile termination connection assignment and control

    使用均衡技術,實現了介入平臺的實時監控,以及對移動連接的分配和控制。
  15. In the experiment of advanced aircraft electrical power distribution system ( aepds ), terminal built - in test equipment ( tbte ) is one of the most important equipments, which can not only simulate all remote terminal loads " work - states, but also monitor the buses " power quality

    為了加快先進飛機配電系統的設計,需要一個既能夠模擬系統多路和匯流條各種工作狀態,又能對匯流條進行電能質量監測的實驗裝置,以便進行地面實驗和測試工作。
分享友人