結構布置 的英文怎麼說

中文拼音 [jiēgòuzhì]
結構布置 英文
array of structure
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. Frame columns inset the filler - wall, avoided the influence that the comer of the room columns outstanding to indoorses view and take up the using space. at the same time, this structure has some advantages as the frame structure, such as arranging neatly, comparting easily etc., deeply welcoming by inhabitant and real estates company, is a building structure system that have the vast development foreground and satisfying the request of green building ". current, the reinforced concrete special - shaped columns structu re system lacks the actual measuring data of earthquake damage and the comprehensive aseismic performance of structure system, the structure system not yet is included in the national code, needing the thorough research

    鋼筋混凝土異型柱體系,採用t形、 l形、十形截面柱代替傳統的矩形截面柱,以輕質材料製作的框架填充墻代替自重較大的粘土磚填充墻;框架柱隱于墻內,避免了屋角柱楞突出對室內觀瞻及佔用空間的影響,同時,又具有框架結構布置靈活、易於分隔的優點,深受住戶及房地產開發商的歡迎,是一種滿足「綠色建築」要求並具有廣闊發展前景的建築體系。
  2. According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed

    根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。
  3. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的,水冷壁的粘污、垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁渣等問題。
  4. The effect factors of boiler steel frame are analyzed, loads composition and structural distribution, also the design code and special value norm for load classification are discussed, mainly including state and live loads, wind and level earthquake

    分析了電站鍋爐鋼的荷載影響因素,提出合理的結構布置和荷載取值及其工況組合。分析了設計標準中的荷載分類及取值約定。
  5. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐架鋼的特殊形式,研究並提出了電站鍋爐鋼改造加固研究方法,及動力分析的具體步驟:建立了鍋爐鋼動力分析模型、地震荷載分析方法、建立了鍋爐鋼結構布置型式、及整個鍋爐鋼架抗側力體系模擬分析方法。具體包括:鋼架本體及架上荷載、地震載荷與阻尼系數確定、制晃裝確定、吊桿與大板梁簡化。
  6. ( 9 ) by studying matching between catalytic converter and exhaust gas system, the conclusions having been gotten as follow : " purifying step by step and driving step by step " and " mental substrate and chinaware substrate being used in same engine " being the laying principles in exhaust gas system, which can solve the contradiction between high converting efficiency of exhaust emission and small loss of power, fuel economics, the rapid light - off and laying difficulty of catalyst

    ( 9 )進行了催化轉化器與排氣系統的匹配研究,對于催化劑的,提出了「分級凈化,逐級推動」的原則;對于載體形式的選擇,提出了「金屬載體和陶瓷載體復合」使用的原則。這樣可以良好的解訣催化轉化器與發動機匹配時,排氣污染物高凈化率與動力性經濟性損失小之間的矛盾、快速起燃和結構布置困難的矛盾。
  7. The structure arrangement of the intake tower for the underground hydropower station of baise project is suit to the complex topography and geology condition, and the hydraulic test shown that the flow pattern entering the tower is well

    百色水利樞紐地下水電站進水塔結構布置,較好地適應了地基復雜的地形地質條件,水流流態良好。
  8. Generally, the analysis model of structure should not be simplified into structure with only one tower unless the rigidity of large base are more than the one of the tower and it is necessary to make the elastic - plastic time history analysis ; ( 3 ) it is necessary to make supplementary time history analysis of tall building with muti - towers when the layout of the structure is asymmetry

    除底盤剛度相對于上部剛度很大的,一般情況下,不能簡單地將其簡化為單塔樓進行計算;有條件時應進行大底盤多塔樓的彈塑性時程分析;多塔樓高層建築結構布置不規則時宜採用時程分析法進行補充計算。
  9. Subsequently, designing the integration of hydraulic loop which makes whole system ' s structure more tighter and simplifies hydraulic loop, so, completing the deploy of hydraulic component. so as to completing the design of whole hydraulic loading system

    為使系統結構布置緊湊、管路簡化,根據選擇的液壓元件及已確定的液壓迴路設計了液壓集成塊,完成液壓元件的配,從而完成液壓加載系統系統的設計。
  10. Welding position : if the configuration collocation of weld is symmetry and the welding sequence is reasonable, the longitudinal contraction and transverse lateral contraction deformation are usually produced, incontrast, the bending deformation is usually produced

    焊接位:如果焊縫在結構布置對稱,焊接順序合理時,則主要產生縱向收縮和橫向收縮變形,反之,則要發生彎曲變形。
  11. On the basis of annlyzing the main domestic cocurrent combustor, we adopted the up and down - shade - technology to reform the combustonafter researching the characteristics of main coal and its affecting factors, i. e., density of coal dust, granularity of coal dust, firing characteristics, alteration of coal, we put forward the scheme of coal ' s configuration and reforming plan about structure of combustor and its disposal type. finally, we make a debugging of cool and hot performance and operation optimizing

    因此,本文在分析目前國內主要直流燃燒器性能的基礎上,選用了上下濃淡燃燒技術,改造了燃燒器;通過對現場燃燒的主要煤種特性及煤粉濃度、煤粉細度、著火特性、煤種變動等的分析研究,提出了配煤方案和燃燒器的方式改造方案;最後進行了冷、熱態性能與運行優化調試。
  12. For the first time, based on frame structure with large thick raft plinth and many engineering examples, analytic method of interaction that means the analysis on three parts above as a whole with a full consideration of interaction thereof that met the need of the deformation correspond on the boundary was used to research on the interaction of structure and groundsill in this paper. and five models were adopted, which were : ( 1 ) a tube with symmetrical double - axis structure and symmetrical loads, ( 2 ) two tubes with symmetrical double - axis structure and symmetrical loads, and ( 3 ) a tube with symmetrical single - axis structure and symmetrical loads, and ( 4 ) two tubes with symmetrical double - axis structure and unsymmetrical loads, and ( 5 ) two tubes with unsymmetrical structure and loads. based on the middle - thick slab theory from mindli and the model for groundsill from winkle, the deformation character of raft foundation and the distributing rule for resisting force of fundus were studied in details by using b ig - style fem ( finite element member ) software, ansys

    本文合了大量的工程實例,以大底盤框架厚筏形式為研究對象,針對單個和多個塔樓於同一個大底盤框架厚筏基上的復雜體系,分( 1 )一個塔樓:結構布置雙軸對稱,荷載對稱的情況; ( 2 )兩個塔樓:結構布置雙軸對稱,荷載對稱的情況; ( 3 )一個塔樓:結構布置單軸對稱,荷載對稱的情? ; ( 4 )兩個塔樓:結構布置雙軸對稱,荷載不對稱的情況; ( 5 )兩個塔樓:結構布置和荷載均不對稱的情況等五種組合情況,全面系統地探討了上部?基礎?地基相互作用的大跨度基礎、基礎板變形特徵及其基底反力的分佈規律。
  13. Research on the effect which is caused on structural stiffness by structural arrangements was conducted

    研究了多塔斜拉橋的各種結構布置方式對剛度的影響。
  14. Improved power structure distribution led to enhanced intensity of flow field and higher separation efficiency

    介紹了通過改進其脫油動力結構布置形式,增加了流場旋流強度,提高了分離效率。
  15. Based on tianmu bridge - no. 3 landscaping pedestrian bridge on jian river in shunyi district of beijing, this paper expounds the design considerations, type alternatives and layout of the structural system

    摘要針對北京市順義區減河3號景觀步行橋天目橋,詳細闡述了該橋的方案比選和結構布置
  16. Structural layout plan

    結構布置
  17. The multi - function building makes the structural configuration the more complex

    多功能綜合性大廈的出現,使高層建築的結構布置更是復雜多變。
  18. To realize this type of structure lay - out, transfer floor must be laid in the floor where structure is transferred

    為了實現這種結構布置,就必須在轉換的樓層設轉換層。
  19. The stadium roof structures are limited on many aspects, such as structure disposal, architecture form and so on

    體育場挑蓬由於其自身的特性,在結構布置、建築形式等受到很多限制。
  20. This paper briefly introduces the arrangement of hst on middle and small tractors. it has certain advantages and possibility

    摘要經過結構布置,認為將hst應用於中、小功率拖拉機上具有明顯優勢,而且切實可行。
分享友人