結構鋼架工 的英文怎麼說

中文拼音 [jiēgòugāngjiàgōng]
結構鋼架工 英文
structural steel erector
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  • 鋼架 : steel frame鋼架廠房 steel frame mill building; steel frame mill plant; 鋼架結構 steel frame const...
  1. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀吊裝方案,樹狀吊裝機械及平面布置,樹狀及節點的搭設,以及樹狀樹干、樹枝和節點的吊裝藝等諸多藝問題。詳細的論述了採用全站儀對樹狀進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀可焊性、焊接方法、焊接藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種焊接問題。
  2. Structural steel erector structured steel welder

    安裝
  3. This thesis takes a typical project - - the natatorium of the sports center, xuzhou normal university - - as a case to study the theory and practice of the design and the construction of the variant steel arched girder

    本文以典型的程? ?徐州師范大學體育中心游泳館為實例,從理論和實踐上研究了變異的設計和施
  4. Caigang watt production ; structural steelwork aircraft processing

    瓦的生產;的加
  5. Some research results are achieved as follows : ( 1 ) layout of lpg supply system and modification of body construction are carried out, and structural analyses of fuel supply bracket are performed. then fuel bottle with single - welding line and valve type specially used for lpg motorcycle is designed and fabricated, and boil - off pressure adjuster and mixing unit of lpg fuel supply are successfully developed

    主要作和論如下: ( 1 )完成了lpg摩托車燃料供給系的總體布置與整車改裝,及其燃料供給系支與座墊支承的分析和抗彎加固;設計和製造加出組合閥式、單焊縫的lpg摩托車專用瓶;實現汽化調壓器與混合器的良好匹配及長縫式等比例式空氣與燃氣混合器的成功開發。
  6. Bpec established in 2003, which is a joint venture outside in home, the factory located in the juliang street no. 21 of cheng - an economic development zone inhebei, it regards producing and selling steel to a con - struction piece, the equipments of heat and it is series products as the contents primarily

    邯鄲博佩克成套設備程技術有限公司,成立於2003年,是一家中外合資企業,廠址位於河北成安開發區聚良大道21號,以生產和銷售件、暖通設備及其系列產品為主要經營內容。
  7. In order to study how the floor stiffnesses influence on the mega steel - frame structures, the results of mode 1 and mode 4 of example 1, and those of mode 2 and mode 3 of three examples are compared. some conclusions are obtained as follows : compared with beams and columns of the common steel - frame structures, the cross - sectional dimension of mega beams and mega columns in the main - frames of mega steel - frame structures are very large. because the mega structure system has great lateral stiffness and entirety work behavior, whether or not considering the floor stiffness has less influence on the entirety responses of the mega steel - frame structures and on the displacement and internal forces of columns of the mainframe, but larger influence on the response of columns of hypo - frame

    通過對算例1方案1和方案4及算例1 - 3方案2和方案3周期、位移和內力反應的比較,研究了樓板剛度對巨型反應的影響,得到如下論:與普通的梁、柱相比,巨型中主框的巨型梁、巨型柱截面尺寸要大得多,並且由它們組成的這種超常規的大型具有巨大的抗側剛度和整體作性能,因此,在地震作用下,考慮樓板剛度與否對巨型整體反應影響不大,對主框柱位移和內力反應影響也不大,但對次框位移和內力反應的影響相對較大。
  8. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層中採用迭層空腹桁.首先分析了其受力性能,得出了空腹桁件合理的截面剛度以及布局形式.然後合一實際程,進行了兩榀迭層空腹桁轉換模型( 1 : 8相似比)的豎向荷載下靜力試驗以及擬動力試驗.其中一榀為普通混凝土迭層空腹桁,另一榀配置了預應力和骨混凝土,對比分析了兩模型的層間位移比、骨曲線以及等效粘質阻力系數等抗震性能的比較,並進行了彈塑性動力分析.試驗和分析果表明,配置預應力和型混凝土的迭層空腹桁轉換具有良好的抗震性能,可以成功地解決迭層空腹桁作為轉換層所產生的弊端問題,最後對這類轉換層提出了相應的設計建議
  9. The degrees of crystallinity of pure ptfe under the different conditions of water cooling, air cooling and furnace - varying cooling were made comparison by xrd. the thermal stability of pure ptfe and solid lubricant was analyzed by dsc - tg ; the composition and valence state of elements in the surface of carbon fiber, solid lubricant before and after friction test and lubricant transfer film were characterized by xps ; the frictional property of solid lubricant was tested by pin and disk test rig. the frictional wear property of solid lubricant between embedded bearing sleeve and steel axle friction pair ring was tested by special simulate test machine, the hardness of solid lubricant was tested by pm ; the compression strength of solid lubricant was tested by material test machine

    用sem表徵原料微觀、摩擦表面及潤滑轉移膜表面形貌:用xrd進行原料物相分析,及比較水冷卻、空氣冷卻、隨爐冷卻三種藝條件下的純聚四氟乙烯樹脂的晶度;用dsc - tg分析純聚四氟乙烯樹脂及固體潤滑劑的熱穩定性;用xps表徵碳纖維表面、固體潤滑劑摩擦前後表面、潤滑轉移膜表面的元素組成、價態變化;用銷盤式摩擦磨損試驗機對固體潤滑劑進行摩擦性能測試;採用專用的臺模擬試驗機對固體潤滑劑鑲嵌軸承套與軸摩擦副間的摩擦磨損性能進行測定;用萊次偏光顯微鏡( pm )測試固體潤滑劑的硬度;用材料試驗機測試固體潤滑劑的抗壓強度等。
  10. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文合太(集團)有限公司第二煉廠主廠房由於生產藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線框排各層豎向(設備)荷載后,對廠房,尤其吊車梁系統進行檢測鑒定與加固設計的實際程,首先對廠房進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析果,對廠房件的可靠性進行了評定,並綜合提出鑒定論和加固處理建議。
  11. Our company is the profession produces the factory house of the metals plastics handicraft product, is a firm gathers the design and manufacturing, in the last years we are positive to set up to expand, the technique is continuously perfect, the product construction renews continuously, having owned the design, paint, make the mold and wash to press, print, throw the light, electroplate, linear production in flowing water in etc. in packing technique equipments, main creation : every kind of copper, iron, stainless steel, aluminum, zinc metal alloy, lead tin metal alloy, acryl, pvc. . etc. material of the badge, medal, key buttons up, the badge of police, memorial chapter, memorial currency, school badge, craft mark card, skin piece mark card, tie clip, knife and fork cutlery, into oil acryl, bottle opener, music speech bottle opener, resemble etc. travels the trophy, the business advertises the promotion gift and craft gift

    本公司系專業生產金屬塑料藝品的廠家,是一家集設計與製造為一體的供應商,多年來積極創新開拓,技術不斷完善,產品不斷更新,已擁有設計、繪圖、制模、沖壓、印刷、拋光、電鍍、包裝等流水線的生產技術設備,主要製作:各種銅、鐵、不銹、鋁、鋅合金、鉛錫合金、壓克力、 pvc等材質的徽章、獎章、鑰匙扣、警徽、紀念章、紀念幣、校徽、藝標牌、皮件標牌、領帶夾、刀叉餐具、入油壓克力、開瓶器、音樂語音開瓶器、像等旅遊紀念品,商務廣告促銷禮品及藝禮品。
  12. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異設計可採用的軟體、模型的建立、支座造形式、變異拱梁的設計,以及保證拱梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異弧形梁吊裝、角度的調整、鉸支座穿軸銷等的施方法,最後對施完成後的位移進行了實際量測。
  13. Referring to some type of the structure such as plane truss, grid truss and grid shell, the author dissertates the common construction technique including whole installation, integral propping up, integral lifting, high altitude construction in bulk, member assembly and sliding construction

    合大跨度的各種形式,如平面桁、網、網殼等,概要的論述了其一般的施方法、藝和技術要點,包括整體吊裝法、整體頂升法、整體提升法、高空散裝法、分單元吊裝法和高空滑移法。
  14. ( 2 ) the paper uses two methods to analyse the falsework structure and then get the basic data to guide the construction and installation of the falsework in sliding construction. these data play an important role in practice

    ( 2 )基於扣件式管腳手設計規范、柱兩種方法對胎受力進行分析,進而得出能指導滑移施中胎造及搭設的基本數據,其果對程實踐有重要的指導作用。
  15. Analysis the force on the falsework by comparison to three calculation methods, referring the designing standard steel tube scaffold of buckling element, lattice column of steel frame and the computer program of sap2000. the result provides strong guidance for practicing it

    基於扣件式管腳手設計規范、柱及sap2000程序等三種方法對胎受力進行分析、比較,其果對程實踐有重要的指導作用。
  16. For portal frame light steel structure building, it has been widely used with less consumption of steel and has obvious advantage on the period and applicability of the construction with comparison to the tradition

    在輕型房屋體系中,門式剛在施周期、適用性上與傳統建築產品相比,具備明顯的優勢。
  17. The industrial computer chassis designed by our company can be used. it is made of 1. 2mm galvanized steel with digital - control technique. the open steel structure, plus industrial power supply and fan, it boasts good stability and heat diffusivity

    Kla機型的計算機主機放在機櫃的下部,可放置我公司配套設計的控主機機箱,該機箱使用1 . 2mm鍍鋅板全數控藝製成,採用開放式,配有業級電源和風扇,擁有超凡的穩定性和散熱性,與kla機身可以輕松的緊固,渾然一體。
  18. C payments, roof boarding processing ; light structural steelwork, rack manufacture, marketing ; steel sales

    、屋面板加;輕、網製造、銷售;材銷售。
  19. This article discusses a successful application of the big span steel structure truss assemble prefabricated parts and slip technology in qingdao liuting international airport project phase

    摘要論述了大跨度的吊裝、滑移技術在青島流亭國際機場二期程中的成功應用。
  20. For the project of erecting the steel structures of the national stadium, the main truss was divided into two lifting elements, i. e. space 3 - d truss and 2 - d truss according to the actual conditions

    摘要國家體育場安裝程,主桁根據安裝實際情況被分成空間立體桁和平面桁兩種吊裝單元。