絞合線對 的英文怎麼說

中文拼音 [jiǎoxiànduì]
絞合線對 英文
twisted wire pair
  • : Ⅰ動詞1 (把兩股以上條狀物扭在一起) twist 2 (握住條狀物的兩端同時向相反的方向轉動 使受到擠壓; 擰...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ動詞1 (回答) answer; reply 2 (對待; 對付) treat; cope with; counter 3 (朝; 向; 面對) be tr...
  1. Commercial building telecommunications cabling standard - part 2 : balanced twisted - pair cabling - addendum 3 - additional considerations for insertion loss and return loss pass fail determination

    商用建築電信電纜敷設標準.第2部分:稱雙電纜敷設.補充件3 .插入損耗和回波損耗通過失效確定的附加考慮要素
  2. Commercial building telecommunications cabling standard - part 2 : balanced twisted pair components - addendum 1 - transmission performance specifications for 4 - pair 100 ohm category 6 cabling

    商用建築電信電纜敷設標準.第2部分:稱雙部件.補充件1 . 4100歐姆的第6類敷設電纜的傳輸性能規范
  3. Twisted pairs : individual conductors twisted into pairs with varying lay length and with specified color combinations to provide pair identification

    絕緣:把單根絕緣按不同的節距扭,採用規定的色譜組,以便識別
  4. The prime works are as follows : strain and stress distribution of section was analyzed. the effect of prestress degree. on cracking moment was explored. the relation of the unbonded prestress increment to effective reinforcement index and corresponding bonded prestress increment were studied. the formulae had been established

    其次,設計了三根活性粉末混凝土無粘結預應力疊梁,兩點稱集中加載、一次受力,得到了它們的截面應變分佈、撓度與變形、無粘結預應力鋼的預應力增量、裂縫的發展與分佈以及極限荷載。
  5. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相位移的簡便計算方法;並綜國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  6. 2. prolonging fireproof compensation lead of precision grade connecting with k dividing code thermocouple, owning polyvinyl fluoride insulation and sheath multi - strand conductor pairs and general shield knited by tinning copper thread, which twisted by 10 compensation pairs. nominal section of conductor is 1. 5mm

    2 .與k分度號熱電偶連接的延長型耐熱精密級補償電纜聚全氟乙丙烯絕緣和護套,多股導體,鍍錫銅編織屏加總屏, 10個補償,導體標稱截面為1 . 5mm 。
  7. Coaxial and coaxial twisted pair composite service wires for aerial applications

    架空設備用共軸和共軸成服務
  8. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形無粘結預應力鋼和單圈有粘結預應力鋼排沙洞襯砌混凝土施加預應力的1 : 1模型試驗,比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝土壓力管道結構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。
  9. Pair : the insulated conductors are twisted into pairs with different pitches so as to raise properties of crosstalk iso1ation and capacitance unbalance

    :絕緣芯以不同節距,以提高串音隔離和電容不平衡性能。
  10. 3 - wire strands with tensile strength of 1570 mpa were collocated in the lower precast concrete slabs of superposed floor. the manner of reinforcement lap and other detailing were brought forward. plane dimensions of the tested floor are 9m and 12m, and height is 180mm

    本論文通過前期試驗的分析總結,選用1570mpa的三股鋼作預制底板的預應力鋼筋,提出了理的板側橫向鋼筋搭接方式和其它構造措施,並按照現行規范設計並製作了試驗結構,樓蓋平面尺寸9 12m ,樓板厚度180mm 。
  11. 1000base - tx " a full duplex ethernet physical layer specification for 1000mb s 1000base - tx operating over category 6 balanced twisted pair cabling

    使用第6類稱雙電纜實現1000mb s
  12. An innovative strengthening scheme for reinforced concrete space beam - column joints using high strength steel wire mesh and polymer mortar jacket was proposed, and the quasi - static tests of three reinforced concrete beam - column joints with floor slab and transverse beams were performed to verify the efficiency of the strengthening scheme

    摘要提出了採用新技術高強鋼網片聚物砂漿加固技術提高鋼筋混凝土空間框架節點抗震性能的方法,並通過3個帶有直交梁和樓板的空間框架節點試件的低周反復加載試驗該加固方法進行了檢驗。
  13. Commercial building telecommunications cabling standard - part 2 : balanced twisted pair cabling components - addendum 4 - solderless connection reliability requirements for copper connecting hardware

    商用建築電信電纜敷設標準.第2部分:稱雙電纜敷設.補充件4 .銅制連接硬體的無釬焊連接的可靠性要求
分享友人