絞吸挖泥船 的英文怎麼說

中文拼音 [jiǎochuán]
絞吸挖泥船 英文
cutter-suction dredger
  • : Ⅰ動詞1 (把兩股以上條狀物扭在一起) twist 2 (握住條狀物的兩端同時向相反的方向轉動 使受到擠壓; 擰...
  • : 動詞1 (把液體、氣體等引入體內) inhale; breathe in; draw 2 (吸收) absorb; suck up 3 (吸引) a...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : 名詞1. (水上的運輸工具, 船舶的通稱) boat; ship; vessels 2. (姓氏) a surname
  1. As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area

    作為一種疏浚設備,單作業可疏浚和吹填。它能連續地掘和輸送漿,因而具有廣泛的適用性和經濟性。
  2. We put emphasis on the method and process of establishing a controller link field control network ; have designed the monitoring program and remote service manager program. the completed system realizes the automatically monitoring and remote - communication of the dredging work of cutter suction dredger

    重點闡述了組建controllerlink現場控制網路的方法和步驟,編制了上位機監控程序和遠程服務管理器程序,基本實現了疏浚作業的自動化監控和遠程通訊。
  3. Development of cutter suction dredge simulator

    疏浚作業模擬訓練器的研製
  4. Repairing technical requirement for special equipment of cutter suction dredgers part 1 : cutter

    絞吸挖泥船專用設備修理技術要求第1部分:
  5. Repairing technical requirement for special equipment of cutter suction dredgers part 2 : trunnion of suction ladder

    絞吸挖泥船專用設備修理技術要求第2部分:刀架耳軸
  6. In the paper, the cutter ladder of 500m3 / h dredger structure analyzed based on structural mechanics, finite element method and the risk analysis

    本文以500m ~ 3 h刀架為研究對象,從結構力學分析、有限元計算、風險評估三個方面加以研究。
  7. It has been tested by dredger simulation training machine and is running perfectly

    初步通過了疏浚作業模擬器的測試,運行狀況良好。
  8. The cutter suction dredger practicality model of the monitoring system is studied and designed in depth in this paper

    本文主要深入研究並設計了監控系統的實物模型。
  9. This text digs a mire operation from the exaltation for time, type to dig a mire ship yield

    摘要文中從提高運轉時間、提高流速、提高漿濃度三個方面論述了提高產量的方法。
  10. Based on the fruit of the model experiment, the application experiment is carried out on the 400m3 / h cutter suction dredger

    在試驗臺研究成果的基礎上還在400m ~ 3 h上進行了實試驗。
  11. Because a cutter suction dredger can continuously excavate and transport the dredged material, it has extensive adaptability and good economy

    具有連續掘和輸送漿的特點,因而具有廣泛的實用性和較高的經濟性。
  12. In the working of cutter suction dredger, the slurry is transported by solid - liquid two - phase flow that is consisted of sand and water. this method cannot carry slurry too long, so some projects cannot be taken on

    疏浚作業中,漿是由沙和水組成的固-液兩相流得以輸送的,往往因排距離不長而使許多工程無法承擔。
  13. This tug shall be designed and constructed in accordance with the requirements of ccs rules on the coastal tugs. this tug shall assist the dredgers in dredging operation, and has the function of towing, fire - fighting and personnel transport etc. main engine : nta855 - m350

    按我國規范對沿海航區拖的要求進行設計建造,主要用於協助csd650整體或350m3 h整體作業,具有拖帶消防及運送工作人員等功能。
  14. Based on plenty of investigations and researches, the thesis developed lots of lively, vivid, visual integrative monitor and alarm interfaces with excellent interactive quality by processing graphical edit software in the integrative monitoring and alarming system. the thesis managed to make them to be an ordinal, clear and distinct system, by programming and designing as a whole, arranging and organizing systematically

    疏浚模擬訓練器集中監控報警系統以國產1750m ~ 3 h集中監控報警系統為模擬母型,在大量調查研究基礎上,通過對各種監控數據、報警提示適當取捨、擴充,並進行總體規劃設計,經過分門別類地編排組織,採用過程圖形編輯軟體開發了大量生動、形象、直觀、交互性強的集中監控報警界面,使之組成脈絡分明、層次清晰的有序系統。
  15. Repairing technical requirement for special equipment of cutter suction dredgers part 4 : spud

    絞吸挖泥船專用設備修理技術要求第4部分:鋼樁
  16. Repairing technical requirement for special equipment of cutter suction dredgers part 5 : spud keeper

    絞吸挖泥船專用設備修理技術要求第5部分:鋼樁卡箍
  17. Repairing technical requirement for special equipment of cutter suction dredgers part 6 : cutter head driven system

    絞吸挖泥船專用設備修理技術要求第6部分:傳動裝置
  18. Based on the technical requirements of manufacture, application and repair of the pump shell and cutter piece of the cutterhead pipeline dredge, put forward are the re - manufacture three principles on easily damaged workpieces of dredge engineering. with the inter - clamped structures on the pump liners, the gradient wear - resisting design on the cutter piece, and the new techniques in the process of re - manufacture, new wear - resistant materials, including high - cr alloy, overlaying and brazing deposits, and polymer adhesive coatings have been successfully applied to the re - manufacture dredge pump shell and cutter piece. the application results show that their wear - resistant lifetimes and the dredging profits have been increased remarkably

    根據絞吸挖泥船刀的製造、使用和修復性能要求,提出了疏浚工程易損件再製造三原則;採用泵內襯互鎖結構、刀梯度化耐磨設計和工藝再製造新技術,將高鉻合金耐磨材料、熔敷耐磨材料及其復合材料和高分子耐磨膠粘塗層材料成功地應用於再製造泵殼和刀片上,顯著提高了泵殼和刀的耐磨壽命和的疏浚效益。
  19. According as the mathematic model near the inlet of the 1750m3 / h cutter suction dredger, by researching the method of calculating the slop ' s specific gravity and volume concentration, the thesis adopted instant interactive mode and developed the optimized dredging operation guiding and training system, which has outstanding instructional quality

    根據1750m ~ 3 h口處漿形成過程的數學模型,通過對計算漿比重及體積濃度的方法進行專門研究,採用即時交互方式,按疏浚作業優化操作步驟開發出指導性強的疏浚作業優化操作提示系統。
  20. This project is one part of project of study and application of new devices and technologies in the 1750m3 / h cutter suction dredger ( it is called as the 1750 dredger for short ), which is a china state ninth five - year key project and was developed by the joint efforts of changjiang waterway bureau and wuhan university of technology

    該項目是中國國家「九五」重點科技攻關項目「 1750m ~ 3 h新技術裝備實驗研究及應用」的一個重要子課題,由長江航道局和武漢理工大學共同承擔。
分享友人