給加煤 的英文怎麼說
中文拼音 [gěijiāméi]
給加煤
英文
load a supply of coal into-
Time, in her flight, drops these fine old feathers. they discussed the collieries. clifford s idea was, that his coal, even the poor sort, could be made into hard concentrated fuel that would burn at great heat if fed with certain damp, acidulated air at a fairly strong pressure
克利福的意思,以為他的煤炭的品質給縱令不佳但是可以做成一種集中燃料,這種燃料如果加以某種帶酸的濕空氣,好好強壓起來,是能夠發出很大的熱力的,很久以來,人們已注意過這種事實了。They use mechanical stokers to feed coal into the furnace
他們用自動加煤機給爐子添煤。These extra power stations, however, are mostly coal - fired, and they have put intolerable strains on the rail and road networks that must carry the additional coal supplies
然而,這些新增電站多數是燃煤火電站,它們給鐵路與公路網增加了難以承受的壓力,因為運輸系統必須運輸更多的煤炭供應。Gas heated catering equipment ; convection - ovens
煤氣加熱給養供應設備.對流烘箱If you can get down to earth for a minute or two and put some coal in this engine, maybe we'll pass the next hill.
如果你的心能定下來一會兒去給火車頭加一點煤炭,也許我們能夠駛過下一個山頭。According to the parameter we carries on the structure, the hydraulic system design and the blueprint, making this machine realize rotary drilling movements, break the frozen coal and unload the frozen coal to the outside of rail car ; carries on the processing, the assembly and the debugging of this machine
根據得出的參數進行結構和液壓系統的設計,繪制圖紙,使該機實現旋挖進給運動,破碎凍煤和凍煤卸車;進行零部件進行加工、裝配,經過樣機調試,達到了設計的目的。We are looking coal mines / exporters / sellers for import of 100, 000 m / tons bituminous coal which will be used for a thermal power plant of our bangladesh government
我們想從煤礦、出口商、生產商手中購買100 , 000兆噸生煤用於給孟加拉政府供熱,請附帶你的公司簡介及你的詳細聯系方式與我們聯系。We strengthened coordination of economic operation and took measures to increase supply and rationally guide the growth of demand, thus alleviating transport difficulties and shortages of coal, electricity, petroleum and important raw and processed materials
加強經濟運行協調,採取措施增加供給,引導需求合理增長,緩解煤、電、油、運和重要原材料供應緊張狀況。Lying beneath the dazhuang village are coal deposits with richreserve. repeated mining operations carried out by the state, collective and private - owned mines over the recent years have led to the presence of cracks on 200 - odd houses. analysis shows that this may be attributed partly to the mining - induced ground subsidence and partly to underground dewatering operation. a division is made of the responsibilities of the individual mines causing the damages
西山煤電股份有限公司鎮城底礦選煤廠是一座礦井型選煤廠,近年來產品的硫分經常達不到用戶的要求,低硫煤的產量又越來越少,給礦井生產和選煤加工帶來了困難,系統改造勢在必行.通過改造,滿足了用戶對硫分的要求,提高了選煤廠的市場競爭力Based on the principle, the preventive scheme was put forward by stage and combining water infusion with grouting
給出了該條件下增加煤體孔隙率,減少瓦斯、空氣流通通道的防治原則。This paper gives an example that is a project about repowering 2 50mw coal - fired plant as combined cycle. it is found out that after full firing repowering, the absolute efficiency gain is 4. 62 % and after feed water heating repowering, the absolute efficiency gain is 2. 78 %
本文結合2 50mw燃煤機組改造為聯合循環的方案實例,計算出排氣助燃型聯合循環系統更新改造使原燃煤機組絕對效率提高了4 . 62 % ,給水加熱型聯合循環系統更新改造使原燃煤機組絕對效率提高了2 . 78 % 。分享友人