給加煤 的英文怎麼說

中文拼音 [gěijiāméi]
給加煤 英文
load a supply of coal into
  • : 給Ⅰ動詞1 (送對方某物; 使對方得到) give; grant 2 (用在動詞后 表示交與 付出) pass; pay 3 (叫; ...
  • : 名詞(黑色固體礦物) coal
  1. Time, in her flight, drops these fine old feathers. they discussed the collieries. clifford s idea was, that his coal, even the poor sort, could be made into hard concentrated fuel that would burn at great heat if fed with certain damp, acidulated air at a fairly strong pressure

    克利福的意思,以為他的炭的品質縱令不佳但是可以做成一種集中燃料,這種燃料如果以某種帶酸的濕空氣,好好強壓起來,是能夠發出很大的熱力的,很久以來,人們已注意過這種事實了。
  2. They use mechanical stokers to feed coal into the furnace

    他們用自動爐子添
  3. These extra power stations, however, are mostly coal - fired, and they have put intolerable strains on the rail and road networks that must carry the additional coal supplies

    然而,這些新增電站多數是燃火電站,它們鐵路與公路網增了難以承受的壓力,因為運輸系統必須運輸更多的炭供應。
  4. Gas heated catering equipment ; convection - ovens

    養供應設備.對流烘箱
  5. If you can get down to earth for a minute or two and put some coal in this engine, maybe we'll pass the next hill.

    如果你的心能定下來一會兒去火車頭一點炭,也許我們能夠駛過下一個山頭。
  6. According to the parameter we carries on the structure, the hydraulic system design and the blueprint, making this machine realize rotary drilling movements, break the frozen coal and unload the frozen coal to the outside of rail car ; carries on the processing, the assembly and the debugging of this machine

    根據得出的參數進行結構和液壓系統的設計,繪制圖紙,使該機實現旋挖進運動,破碎凍和凍卸車;進行零部件進行工、裝配,經過樣機調試,達到了設計的目的。
  7. We are looking coal mines / exporters / sellers for import of 100, 000 m / tons bituminous coal which will be used for a thermal power plant of our bangladesh government

    我們想從礦、出口商、生產商手中購買100 , 000兆噸生用於拉政府供熱,請附帶你的公司簡介及你的詳細聯系方式與我們聯系。
  8. We strengthened coordination of economic operation and took measures to increase supply and rationally guide the growth of demand, thus alleviating transport difficulties and shortages of coal, electricity, petroleum and important raw and processed materials

    強經濟運行協調,採取措施增,引導需求合理增長,緩解、電、油、運和重要原材料供應緊張狀況。
  9. Lying beneath the dazhuang village are coal deposits with richreserve. repeated mining operations carried out by the state, collective and private - owned mines over the recent years have led to the presence of cracks on 200 - odd houses. analysis shows that this may be attributed partly to the mining - induced ground subsidence and partly to underground dewatering operation. a division is made of the responsibilities of the individual mines causing the damages

    西山電股份有限公司鎮城底礦選廠是一座礦井型選廠,近年來產品的硫分經常達不到用戶的要求,低硫的產量又越來越少,礦井生產和選工帶來了困難,系統改造勢在必行.通過改造,滿足了用戶對硫分的要求,提高了選廠的市場競爭力
  10. Based on the principle, the preventive scheme was put forward by stage and combining water infusion with grouting

    出了該條件下增體孔隙率,減少瓦斯、空氣流通通道的防治原則。
  11. This paper gives an example that is a project about repowering 2 50mw coal - fired plant as combined cycle. it is found out that after full firing repowering, the absolute efficiency gain is 4. 62 % and after feed water heating repowering, the absolute efficiency gain is 2. 78 %

    本文結合2 50mw燃機組改造為聯合循環的方案實例,計算出排氣助燃型聯合循環系統更新改造使原燃機組絕對效率提高了4 . 62 % ,熱型聯合循環系統更新改造使原燃機組絕對效率提高了2 . 78 % 。
分享友人